Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.

방파제 건설의 작업한계와 작업일정 추정에 관한 기초적 연구

  • 유청노;이명호;최석관
    • Proceedings of the Korean Society of Coastal and Ocean Engineers Conference
    • /
    • 1991.07a
    • /
    • pp.25-29
    • /
    • 1991
  • 최근 해안종합개발 및 항만시설의 확장에 따라 해안 및 항만구조물의 건설공사가 날로 증대되고 있다. 이러한 구조물의 건설에 있어서 합리적인 시공계획을 수립하기 위해서는 기상, 해상 및 공사의 종류에 따른 작업가능일수의 추정이 중요하다. 이 작업일수는 공법의 결정, 공사비의 적산, 공사기간의 산정 등에 있어서 중요한 요소임에도 불구하고 지금까지도 육상의 토목공사 등에서 사용하고 있는 월간작업일수 20일을 해역별 (외항, 내항), 공종별 구분없이 해상작업에도 적용하도록 규정해 놓고 있는 실정이다.(중략)

  • PDF

Development of a Calculating Model for Local Index Based on Historical Data of Public Apartment Buildings (공공아파트 실적데이터 기반의 지역지수 산정 모델 개발)

  • Lim, Dae-Hee;Lee, Seung-Hoon;Seo, Yong-Chil
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.75-80
    • /
    • 2010
  • With the intensifying of price competition and structural diversifications, the uncertainty of the domestic housing market has been increased. This highlights the importance of the planning stage of construction projects, and the increased need for a higher level of accuracy in approximate estimates. Currently, a number of research and development programs to calculate construction cost at the initial planning stage are being conducted. However, there are few cases in which local characteristics are considered in deriving the results. If local calibration can be conducted during estimates, more accurate cost estimates will be enabled. This could also play a major role in ensuring the success of a project. Therefore, the purpose of this research is to develop a calculation methodology and a model for a local index based on the historical data of public apartment buildings, and to derive a local index that supports accurate construction cost estimates.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

Estimating Construction Cost for Small-Sized Apartment Unit (소형공동주택의 적정건축비 추정방안 연구)

  • Lee, Yoo-Seob;Kang, Tae-Kyung;Cho, Hun-Hee;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.5
    • /
    • pp.94-104
    • /
    • 2006
  • The changed Korean government law associated with the public apartment housing supply, so called the $^{\circ}{\AE}$Apartment Sales Price $Cap^{\circ}{\phi}$, requires new system for estimating construction cost in order to set appropriate price. A model apartment project was carefully designed and its construction cost were analyzed in many different ways. Based on the analyses outcomes, 1,028,000 Won/m2 (excluding cost for underground parking lot) is the most appropriate Price Cap for a smaller than $85{\beta}{\geq}$ apartment unit. Further, it was revealed that the price have to be adjusted reflecting such factors as underground size; structural system; external complex quality; and consumer preferences. Findings from this study will enable the Korean government to realize faster and better application of the related laws. The methodology for obtaining appropriate apartment construction cost will also benefit for future researchers.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

A Study on the Economical Analysis of the Composite Precast Concrete Method (프리캐스트 콘크리트 복합화공법의 경제성 분석에 관한 연구)

  • Yoo, Dae-Ho;Lee, Han-Bok;Ahn, Jae-Cheol;Kang, Byeung-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.113-118
    • /
    • 2007
  • In this study, we select a site adopting real composite precast concrete method. Estimating real construction cost and imaginary cost appling reinforced concrete method in the site, we compare the costs. Through using high intensity concrete and prestressed concrete, amount of concrete is reduced more than 50% but there isn't big gap in material cost. In the main construction cost of composite precast concrete method, the material cost with production cost and transportation cost are in that, joints and topping concrete are account for 90%. But in case of reinforced concrete, labor cost spent at concrete steel bar and form is account for 30%. In the cost of attached, compared with composite precast concrete method, the reinforced concrete method taken in big portion by temporary work and scaffolding is twice as much as composite precast concrete method in construction cost. Therefore, economic efficiency is excellent reducing 11% total cost of composite precast concrete method from the reinforced concrete method.

  • PDF

The Research on Development of Road Cost Index Using Each Representative Item of Expenditure (비목별 주요 항목을 활용한 도로 공사비지수 산정에 관한 연구)

  • Chun, Jin Yong;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.105-113
    • /
    • 2006
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust the contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for modulation of construction contract cost due to fluctuation of prices. However the method for making cost index had some problems in calculating cost index of each expenditure item that could not properly reflect the change of construction cost. To supplement these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes the method for making cost index that utilizes representative items of labor, material, equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent studies. By using this method, it is expected to solve the problems which were not reflected in preceeding studies.

Study of Construction Costs in South and North Korea: Focusing on Construction Cost in Ryomyong Street Project, Pyongyang (남북 건축공사비 연구: 평양 려명거리 사업 건설조립액을 중심으로)

  • Kim, Jang-Han
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.371-378
    • /
    • 2022
  • The Ryomyong Street project is the only construction project for which the construction cost is known, but its scale cannot be estimated because it is marked in North Korean Won. In this paper, the construction cost per m2 of North Korean apartment building construction was calculated based on the construction and assembly amount of the Ryomyong Street project. 160 to 1 was calculated as the ratio of the building construction cost per m2 between South and North Korea based on the Ryomyong Street project in Pyongyang and Seoul Housing & Communities Corporation. This ratio can be used to assume the construction size presented in North Korean won as there is no official exchange rate between the two Koreas.

Analysis and Quantitative Estimation of Risk Factors of Design-Build (턴키 프로젝트에서 리스크요인 분석 및 정량적 평가)

  • Oh, Guk-Yeol;Lee, Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.12-24
    • /
    • 2012
  • The Risks in undertaking a construction project comes from many sources and often involves many participants in the project. This study has identified various kinds of risks, assessed the risk factors quantitatively and suggested risk management method for response pertinent in Design Build(Turn Key)type of projects in Korean context. A questionnaire was designed comprising of 145 possible risks in all types of construction projects. The population from owner, consultant and contractor groups was asked to indicate the risks applicable in DB projects. 25 numbers of critical risks in DB projects were identified and further analyzed for reveling inherent relationship between them through factor analysis. Factor analysis revealed 8 risk factors in DB projects. Construction site related, contract related and design related risk factor consisted about 72% of total risk weight. It has been found out about 6%, while considering the mutual dependency, it is about 10% of total cost of DB project. Therefore, It is suggested that 6% to 10% of construction amount as contingency has to be made provision for risk responses in the DB projects.