Development and implementation of statistical prediction procedure for field penetration index using ridge regression with best subset selection (최상부분집합이 고려된 능형회귀를 적용한 현장관입지수에 대한 통계적 예측기법 개발 및 적용)

  • Lee, Hang-Lo;Song, Ki-Il;Kim, Kyoung Yul
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.6
    • /
    • pp.857-870
    • /
    • 2017
  • The use of shield TBM is gradually increasing due to the urbanization of social infrastructures. Reliable estimation of advance rate is very important for accurate construction period and cost. For this purpose, it is required to develop the prediction model of advance rate that can consider the ground properties reasonably. Based on the database collected from field, statistical prediction procedure for field penetration index (FPI) was modularized in this study to calculate penetration rate of shield TBM. As output parameter, FPI was selected and various systems were included in this module such as, procedure of eliminating abnormal dataset, preprocessing of dataset and ridge regression with best subset selection. And it was finally validated by using field dataset.

An Institute for Weight and Price index of Estimation System of Historical Cost Data in the Electrical Construction Works (실적공사비 적산제도에서 전기공사비지수의 적정 가중치 및 가격지수에 관한 연구)

  • Seo, S.S.;Jang, Y.K.;Ryu, K.H.;Kim, K.G.;Choi, S.D.;Kim, D.S.;Baek, S.H.;Won, S.H.;Sohn, H.K.;Park, I.P.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2092-2093
    • /
    • 2008
  • Since Jan. 2004, the Ministry of Construction and Transportation has partly introduced estimation system of historical cost data in order to reflect result cost of construction market to cost estimation for public construction. And KEPCO started estimation system of historical cost data in the electrical construction works. Electrical construction cost index a matter of great importance. This paper was conducted to examine estimation methods of the items of the price index estimation system of historical cost data and suggest reasonable applications.

  • PDF

Performance Management through Time-Cost Integration in Construction Project (비용-일정 통합관리를 통한 건축공사 실적관리)

  • Kim Dong-Jin;Lim Hyoung Chul;Choi Jung Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.379-382
    • /
    • 2001
  • In domestic construction industry, time and cost has been managed separately in most cases. Usually projects are managed focused on cost, so time is not yet managed systematically. Project performance in these managemental situation can not be assessed correctly. This would cause project delay, cost overrun, productivity loss. Therefore it is needed to adopt earned value concept, an approach used in the management and control of project costs and schedules. Using this EV concept through time-cost integration, project can be managed properly based on the consistency, predictability, and reliability of the performance data. This paper proposed time and cost integration process, proper PMT method, and practical performance management model through time and cost integration.

  • PDF

A Study of the Decision Making System in adopting Off-Site Construction Method in the Initial Stage Considering the Building Project Characteristics -Focused on Structure Work of Apartment Housing- (건축 프로젝트 특성을 고려한 초기 단계에서의 Off-Site Construction 공법 도입 여부 의사 결정 시스템 개발 - 공동주택 골조공사 중심으로 -)

  • Lee, Sungho;Cha, Heesung;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.89-97
    • /
    • 2022
  • Recently, various problems such as reduced productivity, insufficient inflow of skilled manpower, reduced quality, and concerns about increasing safety accidents have appeared in the domestic construction industry. Stakeholder of construction project are considering the Off-Site Construction (OSC) method rather than the conventional on-site construction as an alternative. Despite the importance of decision making in the early stage of the adoption of OSC, there is a lack of methodologies for rational decision making. In this study, a decision making system has been developed to derive the final construction cost score by deriving the project characteristics, selecting the construction difficulty index, and developing a cost model for each construction method alternatives to calculate the standard construction cost. Using this system, the OSC method can be effectively evaluated in terms of its feasibility in the early stage of construction

A Study of the Best Performance Index for Estimate at Completion Forecasting Model on the Earned Value Management System(EVMS) (EVMS 최종공사비 예측 모델 최적성과지수에 대한 고찰)

  • Kim Seon-Gyoo;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.101-107
    • /
    • 2000
  • On 1 July, 2000, the Ministry of Construction and Transportation announced the Earned Value Management System(EVMS) will be applied in public sector soon. However the arguments over the EVMS applied to our unique construction environment still exist and create strong concerns and worries among some experts it would be another mistakes proposed by the government. We do know the EVMS comes from C/SCSC which was first released by the United States Department of Defense in December 1967, and proved very powerful and efficient project management tool from a lot of practices. Although it is an excellent tool, we can not ignore our many experienced failures appling foreign system due to the differences of construction culture and law between the Korean and US construction industries. The purpose of the EVMS's success in Korea, therefore, this paper tests and proves the EVMS's adaptability and credibility to our construction environment by EAC model, that is one of the most important functions in the EVMS, using very scare EV data of the Korean construction projects.

  • PDF

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

The Rationalization through Comparative Analysis of Price Fluctuation Adjustment Method (물가변동 조정방법의 비교분석을 통한 합리화 방안)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.67-76
    • /
    • 2012
  • There are index adjustment method and item adjustment method in estimation methods for price fluctuation rate of public constructions. A relevant regulation has put item adjustment method as a principle, but in most construction, contract sum adjustment has been made by index adjustment method. Hence, this study, by figuring out width and causes of the gap between index adjustment method and item adjustment method through direct comparative analysis, solved inequality caused by difference between them and suggested a rational way against irrationality of each method. For building operations of public housing construction, a detailed fluctuation rate by index adjustment method and item adjustment method of construction cost elements of the same construction, that is, direct material cost, direct labor cost and historical construction cost was estimated to analyze difference between two adjustments and establish its cause. Across the analysis, it was found that fluctuation rate by item adjustment method was estimated lower than that by index adjustment method and difference between methods for estimating fluctuation rate of quotation unit price and application of index unrelated to construction type and construction nature are main causes of the difference. This study has a significance in that, for smooth contract sum adjustment between contracting parties, it practically proved the real difference between adjustment methods by conducting comparative analysis of the difference in direct correspondence way.

Development of a new test method for the prediction of TBM disc cutters life (TBM 디스크 커터의 수명 예측 방법 개발)

  • Kim, Dae-Young;Farrokh, Ebrahim;Jung, Jae-Hoon;Lee, Jae-Won;Jee, Sung-Hyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.475-488
    • /
    • 2017
  • Wear prediction of TBM disc cutters is a very important issue for hard rock TBMs as number of cutter head intervention. In this regard, some model such as NTNU, Gehring model, CSM models have been used to predict disc cutter wear and intervention interval. There are some deficiencies in these models. This paper developed a new test method for wear prediction for TBM disc cutter and proposed a new abrasion index. In this regard, different abrasivity indices along with their testing methods are explained. A comparative study is performed to develop the predictability of different cutter life evaluation methods and index. The evaluation of the new methods proposed in this paper shows a very good agreement with the actual cutter life and intervention interval length. The proposed tester and index can be easily used to predict the intervention interval length and cutter wear evaluation in both planning and construction stages of a TBM tunneling project.

An Uncertainty Analysis of Calculating Life Cycle Maintenance and Energy Costs for Technical Proposals (기술제안입찰을 위한 유지관리 및 에너지 비용 산출방식의 불확실성 분석)

  • Chung, Sung Young;Kim, Sean Hay
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.3-9
    • /
    • 2018
  • Although Life Cycle Cost (LCC) must be evaluated by experts, sometimes it may not allow a sufficient time for even the experienced LCC expert to make rational decisions. Therefore, it often ends with relatively comparing the final numbers. We have broken down 110 technical proposals that are actually bade and accepted for large construction projects, and then have analyzed the uncertainty of Maintenance and Energy (M&E) cost during building life cycle, which turns out be the most volatile factor in uncertainty of LCC. Also we suggest "Value Engineering Index (VEI)" - the reduced M&E cost that is normalized by the reduced first cost. It is analyzed that the most uncertain factors of the M&E cost include repair and replacement term differing from each project, duplicated repair and replacement, non-standard repair items, and site-specific energy cost. Eventually we propose a VEI population with a mean of 1.38 and a standard deviation of 1.19, which is obtained by individually and exclusively applying the uncertain factors of the M&E cost to the 35 standard sample of technical proposals. The LCC evaluators may be able to use the VEI population as the benchmark to select the technical proposal with the most reasonable LCC among many others in two suggested manners; the one is to deterministically calculate the probability of single VEIs, and the other is to stochastically calculate the probability of the VEIs where uncertainty is quantified.

Relationship between brittleness index of hard rocks and TBM penetration rates (경암의 취성도와 TBM 순굴진율간의 관계)

  • Lee, Gi-Jun;Kwon, Tae-Hyuk;Kim, Kyoung-Yul;Song, Ki-Il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.4
    • /
    • pp.611-634
    • /
    • 2017
  • In rapid urbanization, demand for utility tunnel increases more, and tunnel boring machine (TBM) has been used widely. Prediction of TBM penetration rate is important for proper estimation of construction period and cost. Although there are several methods, such as NTNU model and CSM model that require many input parameters, fundamental understanding on correlations between rock properties and TBM penetration rate is critical. In this study, we explored the brittleness indices of hard rocks according to various definitions, and the correlations between the brittleness indices and the TBM penentration rates.