• Title/Summary/Keyword: 공사비분류체계

Search Result 67, Processing Time 0.032 seconds

Development of the Space Cost Breakdown Structure(CBS) for Multi-Family Housing Projects (공공아파트 건설공사의 공간별 공사비분류체계 개발)

  • Hyun, Chang-Taek;Koo, Kyo-Jin;Yeon, Hee-Jung;Moon, Hyun-Seok;Cho, Kyu-Man;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.178-187
    • /
    • 2007
  • As the government has enforced recently the policies on the distribution of the housing, the construction cost of multi-family housing projects has increasingly become very sensitive and political issue. However, it is difficult to predict the construction cost in planning and design phase of the project because the Bill of Quantity of the multi-family housing projects was composed of breakdown structure based on each work package. To predict the construction cost in planning and design phase for multi-family housing projects in more effective and reasonable way, this study developed the cost breakdown structure based on spaces using Delphi method. The Cost Breakdown Structure (CBS) based on spaces for multi-family housing projects basically consists of three parts: (i) Building part; (ii) Non-building part; and (iii) Additional part. The characteristics of spaces in multi-family housing projects are fully taken into consideration. Then these three parts were subdivided into work packages in terms of work tasks. Additionally, the usefulness and effectiveness of Space CBS in this paper were validated by analyzing the BOQs of several collected sample projects and matching with Space CBS afterwards.

A Study on the Estimation of Elemental Costs for an Apartment Building (공동주택에 대한 부위별 공사비 산정에 관한 연구 - 사례 H사의 실행단가를 중심으로 한 연구 -)

  • Kang, Hyun-Wook;Yoo, Jong-Hwan;Kim, Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.173-181
    • /
    • 2007
  • The purpose of this study is to estimate elemental costs of an apartment building. The adapted research method includes a case study from $^{\circ}{\AE}H^{\circ}{\phi}$ construction company. The results of this study are as follows: 1) An elemental cost format of an apartment building is proposed, 2) An elemental cost table based on a case study of $^{\circ}{\AE}H^{\circ}{\phi}$ construction company is suggested.

Development of Supporting tool for WBS-based cost (작업분류체계 기반 공사비 작성을 위한 지원도구 개발)

  • Yoon, Hoi-Su;Moon, Jin-Suk;Kim, Seong-Jin;Han, Chung-Han
    • Annual Conference of KIPS
    • /
    • 2011.11a
    • /
    • pp.1430-1432
    • /
    • 2011
  • 공사비정보와 일정정보는 사업을 관리하는데 있어 매우 중요한 정보로 이들이 연계활용되어야 공정공사비 관리를 원활하게 진행할 수 있다. 그러나 국내의 실정은 공사비가 내역체계 기반으로 관리됨에 따라 설계사에서 작성되어 시설, 부위, 공간 등의 정보를 갖고 있던 수량정보가 내역체계 기반으로 전환되면서 정보들을 상실하고 시공사에서는 다시 물량분개라는 작업을 통해 다시 시설, 부위, 공간 등의 정보를 부여하는 작업이 발생하고 있다. 이에 도로분야 사업을 대상으로 작업분류체계(WBS)를 그 연계방안으로 제시하고 작업분류체계 기반 공사비 작성을 통해 설계사에서 작성된 정보를 시공사에서까지 활용할 수 있도록 하고자 한다. 본 사업에서는 이러한 작업분류체계 공사비 작성을 위한 지원도구 개발을 위해 업무 프로세스 검토, 지원도구 활용 공사비 작성, 시험적용을 통한 지원도구 검증을 수행할 계획이다. 이를 통해 내역정보와 공정정보의 연계가 실현되고, 효율적인 공사비 관리의 기반을 제공할 수 있다.

Project Informations Classification System for Civil Works (토목공사용 정보분류 코드체계의 개발)

  • Lee, Bae Ho;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.14 no.4
    • /
    • pp.897-905
    • /
    • 1994
  • Project Informations Classification System (PICS) can be utilized as a springboard for advanced construction management techniques because it marries informations to networks and maintains a disciplined cost control. The present study attempts to develop a PICS which can be applied in construction management techniques. The frame work largely consists of the three parts such as: (i) development of the tentative Work Breakdown Structure with three divisions, facility calssifications, functional classifications and work classifications, covering the whole areas of civil works, (ii) development of the integrated informations system including the other informations in cost estimating and network scheduling, (iii) construction of relational database system for computer application. The system suggested in the study is found useful for the systematic and uniform management of construction works in the various stages.

  • PDF

Standardization of Factors Classification Associated with Cost and Schedule Variations in Road Construction Projects (도로건설공사 공사비·공사기간 증감요인 분류체계 표준화 연구)

  • Mun, Junbu;Lee, Juhui;Baek, Seungwon;Lee, Kangwook;Yun, Sungmin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.821-830
    • /
    • 2023
  • Various studies has tried to unveil causes of cost overrun and schedule delay in the road construction project. However, these causes need standardization due to difference by guidelines, relevant research, and facilities. Therefore, this study identifies and elaborate standard road construction cost and schedule variation factors that can be used in the planning and execution of the project. variation factors have been derived and grouped through literature review and modified and supplemented through expert interview. In addition, the connection with the relevant guidance factors is confirmed and the usability is reviewed by applying actual road construction cases. The factors suggested in this study comprehensively include factors of related guidelines and previous research, more clearly distinguish, support decision making.

A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

A Conceptual Model for Automated Cost Estimating Using Work Information Classification System of Apartment House (공동주택의 공사정보분류체계를 활용한 적산 자동화 개념 모형 개발)

  • Lee, Yang Kyu;Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.1
    • /
    • pp.15-24
    • /
    • 2014
  • The study presents work information classification system of apartment house which can organize all construction management services throughout the planning and management of a construction such as the decomposition of the design process, the assembly of construction process and cost estimating, etc. In addition, the study suggested a way to connect work information classification system based on a relational database in working order and built a conceptual model for automated cost estimating by utilizing established data base. A conceptual model for automated cost estimating will resolve the fundamental problems of the existing cost estimating system and will be able to take advantage of scientific cost estimating system at the construction site of apartment house.

A Study On Information Classification Systems For Civil Construction (토목공사 정보분류체계에 관한 연구)

  • Kim Byeong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.102-111
    • /
    • 2003
  • It is very important to improve the overall efficiency in exchanging construction information among project Parties from the project set-up through the project completion. However, each government agency in Korea tendering construction projects has different structures in classifying information. This results in inefficiency of overall construction projects and cost increasing. This requires establishing a new construction information classification system. This research suggests a framework for an analysis of a standard classification system in setting up a standard classification system and in evaluating its applicability to business processes. According to the identified requirements of the classification system, this research analyzes and compares existing information classification systems such as Uniclass, Uniformat, and Korean Standard Classification System of Construction Information, and then identifies problems and approaches for the improvement.

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.