• Title/Summary/Keyword: 공사분류체계

Search Result 205, Processing Time 0.025 seconds

Using the common-WBS based on the Construction Classification System for the integration of Schedule and Cost information (공정-내역정보 연계를 위한 통합건설정보분류체계기반의 공통WBS 활용방안 -도로공사 사례를 중심으로-)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.107-114
    • /
    • 2005
  • The time and cost is the most important information for the construction project management. Currently, a lot of studies have been done in order to clearly relate them with each other, but there have been some difficulties. Because of the characteristic of Korean government contract law, the construction project in Korea is managed by only cost and the time and cost information is distinctly separated. In order to manage all the major construction project information smoothly, the time and cost information should have relation with each other. This study suggest methods for relating the time and cost information, especially for road construction project of MOCT. Through the survey of construction field engineers and case study of the road construction project, several alternatives to improve the usability of construction information are suggested in this study. These alternatives can support relating other construction information.

Development of an Approximate Cost Estimating Framework for River Facility Construction at Planning Stage (하천시설물 공사의 기획단계 개략공사비 산정체계 개발)

  • Shin, Jung Min;Woo, Sungkwon;Lee, Si Wook;Kim, Ok Ki
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.371-381
    • /
    • 2008
  • The systematic methodology for estimating construction cost approximately at planning and pre-design phase of a river facility construction project has not yet been established because of its unique characteristics including its relatively small project size in terms of cost. This research suggests a 4-level cost information structure and identifies critical factors affecting construction cost as a result of thorough analysis of accumulated historical cost data of river facility construction projects. Also, this research presents the framework of the approximate cost estimating methodology for river facility construction project a planning stage.

A Study on A Computerized Input Data Model for A General -Purpose Project Management (교량공사를 중심으로 한 범용 프로젝트 관리를 위한 전산 입력 자료 모형 구축)

  • Park, Hongtae
    • Journal of the Society of Disaster Information
    • /
    • v.12 no.1
    • /
    • pp.19-31
    • /
    • 2016
  • The purpose of this study was to establish the initial computerized management database which can be applied to a universal project management computer system for managing universal project management and operation. Database construction model presented in this paper suggested the model of organization, activity and operation of bridge construction(two abutment-three-span) based on the organization information classification system of the facility classification, functional component classification, work classification, resource classification. Database model established in this study are considered to be able to take advantage of a very systematic and scientific management for future universal project management and operations.

A Study on Taxonomy and RCM Strategy Establishment for Performance Evaluation of Hydrogen Compression System at Hydrogen Vehicle Refueling Stations (수소자동차충전소의 수소압축장치 성능평가를 위한 분류체계 및 RCM 전략수립 연구)

  • Seong-jun Bae;Ha-neul Yim;Seo-yeon Na;Chung-keun Chae;Jin-hyeok Choi;Jin-woo Lee;Sang-bong Shin
    • Journal of the Korean Institute of Gas
    • /
    • v.27 no.1
    • /
    • pp.48-56
    • /
    • 2023
  • Currently, Hydrogen compressor is maintained and managed according to the safety management regulations of the operator. But it is not based on technical standards, so it is necessary to establish based on reliability. In this paper, hydrogen compressor taxonomy by ISO 14224 standard reviewed for hydrogen compressor operated by KOGAS-Tech hydrogen vehicle refueling station to establish 9-stage taxonomy, and FMEA was conducted to establish RCM strategy specified in SAE JA1011, and 1012. It is expected that results of taxonomy and RCM strategy will be used as basic data for development of standards for verifying the performance of compressors.

A Study of BIM Delivery Model for Railway Construction Project using BIM Function Breakdown Structure (BIM 기능요소 분류체계 도출에 의한 철도시설공사 BIM 기능발주 구성 방안)

  • Kim, Young-Hwan;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.344-353
    • /
    • 2015
  • Recently, the utilization of the BIM system has been extended to cost and resource simulation, visualized management of construction site information and application of augmented reality including basic 3D modeling. Therefore, various BIM functions are being developed for practical applications. However, since clear classification criteria and knowledge information of BIM functions are not sufficient for field engineers, it is difficult to identify the necessary BIM functions for a construction project. This study suggests a BIM function breakdown structure considering the individual functional properties and a process model that can be ordered by applying BIM in a railway construction project. The proposed delivery model is used to obtain a practical utilization of BIM by analyzing features applicable to railway construction projects; model is verified using a case project.

A Suggestion on the Improvement of the Business Classification System Considering the Specialty of the Painting Work, Landscaping Construction Industry (전문건설업 대업종화 적용에 있어 도장, 조경공사의 특수성을 고려한 업종분류체계의 제안)

  • Kim, Jeong-wook;Kim, Gyu-yong;Choi, Min-soo;Nam, Jeong-soo;Lee, Sang-soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.497-506
    • /
    • 2022
  • In recent years, the specialized construction industry has undergone major construction and major industries, and without considering the technical expertise of construction works, the construction industry is promoting the integration and establishment of specialized construction industries according to convenience and abolition of their own industries. As the reorganization plan causes confusion in the production structure and lacks persuasive power by aiming only for industry simplification, it is judged to be desirable to review it according to the detailed characteristics of the specialized construction industry. In this study, -to review the reorganization of a rational classification system that considers the specific nature of the specialization of specialized construction projects, the classification of construction works, major work contents and characteristics, technical expertise, and problems of largescale industry in the case of painting construction and landscaping construction was analyzed. Based on this, aspects to be considered when reorganizing the current professional construction industry classification system are identified and reasonable improvement plans for each industry are suggested.

An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

A Study on the Improvement of Specification in connection with Construction Lessons Learned Database (건설공사 지식데이터베이스 연계를 통한 시방서 개선방안)

  • Song Jae-Young;Lee Tai-Sik;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.511-514
    • /
    • 2002
  • Nowadays, domestic construction companies make an effort to share knowledge and experience accumulated while conducting a project. One way of improving knowledge sharing is to develop specifications which are linked to the expert's knowledge and experience based on the specification classification. Therefore, the purpose of this paper is to review the current domestic specification system and develop the specification linked to the construction lessons learned database. It is expected that the proposed specification system will support the decision making process by effectively providing the knowledge and solution.

  • PDF

A New Perspectives on the Research of Domestic and Overseas Land Category System (국내외 지목체계 운용실태 연구에 관한 새로운 시각)

  • Ryu, Byoung-Chan
    • Journal of Cadastre & Land InformatiX
    • /
    • v.49 no.2
    • /
    • pp.151-167
    • /
    • 2019
  • Korea's current Land Category Classification System(LCCS) can not accurately register of complex and diverse Status of land use in Cadastral Record. Therefore, in order to draw implications for the improvement of LCCS in Korea, Shin SW and four others published a paper titled 'A Study on Land Category System of Domestic and Foreign Country' in 2013. This paper compared the 'land category', 'land use' and 'land cover' of six countries on the same line, and Some non-factual content was described. So, presented a new perspective on this. Looking forward, I hope that reasonable alternative will be presented based on the understanding of LCCS of Germany, Japan and Taiwan. In the future research project, to study the history of LCCS in Germany and Taiwan and suggest to refer to improvement of LCCS of Korea.