• Title/Summary/Keyword: 공사분류체계

Search Result 205, Processing Time 0.029 seconds

Analysis of Construction Work Breakdown Structure of Maintenance of Educational Facility (학교시설물 유지관리를 위한 공사 분류 체계 분석)

  • Ryu, Hanguk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.251-252
    • /
    • 2015
  • Enough school facility maintenance data should be accumulated in a database or data warehouse in order to supply information about school facility correct maintenance budget plan, budget assignment, and cycle and rate of maintenance or replacement. For those, this research analyze the present school facility maintenance practice and budget and construction cost structure. In order to solve the problems, this study analyze the present practice of maintenance and replacement and obtain LCC(Life cycle cost) data, perform expert interview and then establish construction work breakdown structure of maintenance of educational facility by combining work breakdown structure(WBS) and cost breakdown structure(CBS).

  • PDF

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

Integrated Management System of Construction Documents and Drawings by Construction Information Classification System (건설정보 분류체계에 의한 설계도서 통합 관리 방안)

  • Seo Jung-Hun;Park Seong-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.589-592
    • /
    • 2003
  • Our government suggested an integrated construction information classification system (CICS) for improving construction information exchange between project participants. However, because a database for integrating construction documents and drawings is insufficiently built, there are many restrictions in using CICS. Therefore, this study suggests a methodology to integrate and manage the construction documents and drawings by CICS. The methodology suggested in the study is verified to a web-based construction documents and drawings management system with integrated DB.

  • PDF

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

Development of Risk Breakdown Structure of Nuclear Power Plant Decommissioning Project: Focusing on Structural Damage / Work Process Risks (원전 차폐 콘크리트 구조물 제염해체공사 리스크 분류체계 구축: 구조적 / 작업 리스크를 중심으로)

  • Kim, Byeol;Lee, Joo-Sung;Ahn, Yong-Han
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.22 no.3
    • /
    • pp.38-45
    • /
    • 2018
  • The purpose of this study is to deduct the structural damage / work process risks factors which can be occurred during the decommissioning in the NPP containment concrete structure. To achieve these purpose, risk profile specified in the construction industry is analyzed, and the work process of NPP decommissioning and the construction project were matched based on the similarity of each works. Accordingly, human and physical risk factors are classified. Finally, the risk associated with the building structure and work process was classified as per their process activities, and risk typology explaining the disaster which put the structure, equipments, machine and workers in serious danger was developed.

A Risk Management Method Using Fuzzy Theory for Early Construction Stage (퍼지이론을 이용한 초기 건설공사의 리스크 관리 방법)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.136-143
    • /
    • 2004
  • This study presents a risk management methodology using fuzzy theory for early construction stage and is focused on risk identification and risk analysis. This study identifies various risk factors associated with activities clearly construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The risk analysis method presented in this study is based on the RBS that has two levels such as upper level and lower level. The risk exposure of lower level risk factors is assessed by fuzzy inference. The weight of risks is estimated by fuzzy measure. Then, the estimated risk exposures and weights are aggregated to assess the risk exposure of upper level risks by Choquet fuzzy integral. The risk exposure of upper level risks determine the priority of risk factors in view of risk management. This study performs case study to validate the proposed method. The result of case study shows that the methodology suggested in this thesis would be utilized well in evaluating risk exposure.

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

Development of Earned Value Management System by Using Visualization Index and WBS Map (시각화 지표 및 좌표식 정보분류체계에 의한 공정.공사비 통합관리시스템 개발)

  • Lee, Woo-Sik;Kang, Leen-Seok;Park, Seo-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.26-35
    • /
    • 2009
  • Work breakdown structure (WBS) can be used as an information center in earned value management system (EVMS) for the construction project. Because EVMS results, such as schedule variance and cost variance, are analyzed for the selected WBS code, the role of WBS code is important in EVMS. This study suggests a methodology for organizing WBS map with a quadrant. It can represent the project organization collectively by work level in a coordinate system. And the study developed an EVMS tool based on the WBS map and this tool can visualize various attribute indexes of EVMS by color symbols. Those methodologies can be used for improving practical application of EVMS.

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.