• Title/Summary/Keyword: 공사계측

Search Result 320, Processing Time 0.03 seconds

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

ICT-based agricultural water management algorithm (ICT 기반 농업용수 관리 알고리즘)

  • An, Hyunuk;Choi, Eunhyuk;Shin, Ankook;Lee, Jaenam;Kang, Munsung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.174-174
    • /
    • 2020
  • 현재 4차 산업혁명은 산업 전 분야에 걸쳐 일어나고 있다. 농업용수 분야에서도 데이터를 활용한 수요자 중심의 지능형 물 관리사업 뿐만 아니라 일정규모 이상의 저수지 및 양수장에 대하여 농업용수 공급량 측정을 위한 계측기 설치사업이 추진 중에 있다. 그러나 현재까지 설치된 계측장치들의 활용방안에 대해서는 뚜렷한 성과가 도출된 바 없기에 농업용수 계측장치들의 활용방안에 대한 깊이 있는 연구가 필요한 실정이다. 이에 본 연구에서는 충북 진천군 소재 무수저수지 유역을 대상으로 농업용수 계측정보를 활용하여 관개용수의 최적 관리방안을 모색하고자 하였다. 농업용 저수지의 공급량, 용수간선의 수문개도율에 따른 각각의 시나리오를 설정하고 시나리오별 목적함수를 계산하여 농업용수의 최적 관리를 위한 시설물조작 알고리즘을 도출하였다. 뿐만 아니라 관개구역 내 수리시설물, 영농방식, 용수공급현황 등의 조사를 통해 농업용수 관개수로망을 구성하고 수리해석을 실시하여 농업용수 최적관리 알고리즘의 적용성을 검토하였다.

  • PDF

The Case Study of Effective Reinforcement Method to Trouble Occurred of Excavation Construction (굴착공사 중 문제발생 유형에 따른 효과적인 보강방법에 대한 사례연구)

  • Ki, Jungsu;Jung, Kyoungsik;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.2
    • /
    • pp.49-57
    • /
    • 2012
  • Large-scale collapse happened under excavation construction in the past. But, recently the trend that it is completed safely to minimize damages is growing because of increasing levels of design review and detecting signs of problems before the outbreak of large-scale collapse with proactive planning of measurement. In this paper, through studying case collapses over the past, it put the cause of the collapse in order. And then, after reviewing general information on management and utilization of measurement methods which importantly emerging recently, the type and cause of the problem during the excavation was reviewed. And the causes of problem were analyzed by targeting the site which unusual symptoms happened on measuring results under construction. In this study, the awareness that measurement management and subsurface investigation is highly important will increase for preventing large-scale collapse in advance.

Analysis of the cause of non-measurement seepage rate on CFRD using geophysical and geotechnical exploration (물리탐사와 지반조사를 이용한 CFRD댐 침투수량 미계측 원인분석)

  • Jong Wook Lee;Geun Soo Lee;Seong Bae Jo;Nam Ryong Kim;Jeong Yeul Lim
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.83-83
    • /
    • 2023
  • 댐의 침투수량은 준공이후 댐 안전성 확보를 나타내는 지표 중의 하나이며, 유지관리를 위해 침투수량 측정을 실시하여 관리를 하고 있다. 댐 타입별로 침투수량에 대한 허용치와 관리기준치는 다르지만, 기본적으로 댐에서 발생되는 침투수량은 측정범위를 넘지 않도록 관리를 하고 있다. 댐의 침투수량 측정은 댐 하류에 누수집수벽을 설치하고 댐에서 발생되는 침투수량을 집수한 후 삼각위어를 통하여 침투수량을 측정하고 있다. 이러한 침투수량 측정은 대부분의 댐에서 실시간으로 자동측정하고 있지만, 경우에 따라 미계측 구간이 발생되어 댐 유지관리 측면에서 미계측에 대한 원인분석이 필요한 실정이다. 일반적으로 침투수량의 미계측 원인은 계측기기, 삼각위어, 누수집수벽, 기초지반 등 다양한 원인이 있지만 명확한 원인을 찾기는 어려움이 많다. 특히, 댐 침투수량의 경우 지하수위, 댐 표면 우수, 침투수가 같이 측정되기 때문에 원인분석을 위해서는 다양한 검토가 필요하다. 본 연구의 표면차수벽형석괴댐은 누수집수벽을 통하여 침투수량을 측정하고 있으나, 일부 구간 미계측 부분이 발생하여 기초지반, 댐체 하류사면, 여수로와 댐체 접합부를 통한 누수를 원인으로 추정하였다. 이를 조사하기 위하여 전기비저항 탐사, 시추조사, 수압시험, 지하수위 측정 결과를 이용하여 누수발생 추정위치를 찾고, 침투수량이 미계측되는 원인을 분석하고자 하였다. 전기비저항 탐사는 여수로 접합부, 누수집수벽 상·하류 구간을 선정하여 측정한 결과 상·하류 저비저항대가 존재하는 구간을 추정할 수 있었다. 수압시험 결과 기초암반은 2.3 ~ 21.3 Lu(3.65×10-5 ~ 3.65×10-4 cm/sec)의 범위로 누수 가능성이 있는 높은 투수성을 갖는 부분을 확인할 수 있었다. 전기비저항 탐사, 수압시험, 지하수위 측정을 통해 누수집수벽 기초지반 누수발생 원인분석 결과 누수집수벽 기초암반을 통한 누수로 누수집수벽에 댐체를 통한 침투수량이 저류되지 못하는 현상이 발생하기 때문인 것으로 판단되었다. 침투수량계의 정상화를 위해서는 조사를 통해 확인된 누수집수벽 기초암반 누수구간의 그라우팅 보수보강이 필요함을 확인하였다.

  • PDF

Analysis on the Current Status of Maintenance and Monitoring of the Bridge Across Seokdaecheon, Busan Metro Line 4 (부산도시철도 4호선 석대천 횡단 교량의 유지관리계측 현황분석)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.349-351
    • /
    • 2022
  • 1차 안전기준은 안전한 공사관리를 위한 목표치이며, 2차 주의기준은 주변구조물이나 주민에게 안전에 영향을 미칠 수 있는 범위 값이며, 3차 정밀분석기준은 공사장 자체의 위험에 대비하는 기준을 의미 하므로 향후에는 계측항목별로 계측관리기준을 세분하여 적용하는 것이 필요하다.

  • PDF

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

Analysis of Accident and Measurement Costs Resulting from Incidents in Retaining Walls (가시설 벽체 사고에 따른 복구비용 및 계측비용 분석)

  • Dong-Gun Lee;Ji-Yeol Choi;Jeong-Yeon Yu;Ki-Il Song
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.3
    • /
    • pp.27-35
    • /
    • 2023
  • Ensuring the stability of visible structures during excavation works are extremely crucial. While the stability of the ground is analyzed through numerical calculations the during design phase, the conditions during construction often differ. Therefore, it is imperative to analyze the stability of the wall through measurements. The cost of measurements on the construction site is set at a very low unit price, which increases the risk of accidents involving retaining walls. In this study, we argue for the importance of automated or wireless system measurements of retaining walls, by estimating construction duration and accident costs through the analysis of hypothetical accident cases, and comparing these with measurement costs. In case of a major destruction during excavation work, the accident handling cost could be less than 5% of the total measurement budget. Therefore, increasing the measurement budget to prevent accidents in advance can be economically beneficial.

Hydraulic experiment for topographical change around a sea dike using 3D laser scanner (3D 지형스캐너를 활용한 방조제 주변의 지형변동 수리모형실험)

  • Lee, Byeong Wook;Yoon, Jae-Seon;Jun, Teak-Ki;Song, Hyun-Gu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.213-213
    • /
    • 2021
  • 한국농어촌공사 농어촌연구원은 하천 및 해안분야의 다양한 수리모형실험을 수행할 수 있는 대형 수리모형실험 시설을 2018년에 구축완료하였다. 국내 최대 규모의 실험장뿐만 아니라 첨단 광학용 계측장비(PIV 및 LDV 시스템)를 연계한 전용실험수로, 대형유사실험수로 등 7종의 기능별 실험수로를 갖추고 있어 다양한 수리현상 분석을 수행할 수 있다. 최근에는 산사태의 주요 원인중 하나인 토석류 실험, 방조제 주변의 침·퇴적 실험 등을 수행하였으며, 본 연구에서는 3D 지형스캐너를 활용한 방조제 주변의 지형변동 수리모형실험에 대하여 소개를 하고자 한다. 방조제는 조수가 육지쪽으로 밀려들어와 내부개발지역이나 농지 등을 해수로부터 보호하기 위해 설치되는 외곽시설이다. 이러한 방조제 전면의 빠른 유속에 의한 침식은 배후지의 안전에 상당히 큰 문제를 야기시킨다. 방조제의 침식을 방지하기 위하여 방조제 전면에 수제공을 설치하여 수제공과 수제공 사이의 느려진 유속에 의해 방조제 전면에 토사를 퇴적시키는 방법이 있다. 본 연구에서는 방조제 전면에 수제공의 길이를 달리 설치하여 수제공 주변의 침·퇴적현상을 이동상 실험을 수행하여 분석하였다. 일반적으로 토사의 침·퇴적고를 계측하는 방법으로 일정한 격자망을 구성하여 각 지점별로 실험 전·후의 토사의 표고차를 수작업으로 계측한다. 이 경우는 실험자가 직접 측정하는 계측오차가 발생하게 되고 측정할 수 있는 지점의 수가 한계가 있어 전체적인 토사의 변화양상을 분석하기엔 어려움이 있다. 이를 해결하기 위하여 본 연구에서는 농어촌연구원이 보유하고 있는 3D 지형스캐너를 활용하여 토사의 표고차를 측정하였다. 실험에 사용한 3D 지형스캐너의 최대 측정거리는 스캐너가 설치된 중심점으로부터 반경 80m에 해당하며, 해상도는 1.6mm~50mm의 범위로 수작업으로 격자망을 구성하여 측정하는 것보다 상당히 높은 수준의 결과를 취득할 수 있으며 계측시간을 단축할 수 있는 장점이 있다. 하지만, 펄스레이저에 의한 지형스캔 방식은 수면과 같이 레이저가 투과할 수 없는 경우에는 계측이 불가능하며, 어두운 계열의 색을 스캔하는 경우 결과 분석에 주의할 필요가 있다. 본 연구에서는 이동상 재료로 안트라사이트(검은색)를 포설하였고, 검은색 계열의 실험사에도 3D 지형스캐너가 우수한 결과를 제공하는 것을 확인하였다.

  • PDF

A study on the optimal number of monitoring points in double-track tunnel lining (복선터널 라이닝의 최적 계측 측점수 산정연구)

  • Woo, Jong-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2017.11a
    • /
    • pp.143-144
    • /
    • 2017
  • 본 논문은 복선터널 라이닝의 최적 계측 측점수를 산정하기 위해 복선터널 라이닝에 작용하는 하중 조건을 대칭 분포하중이 작용하는 경우로 가정하여 터널해석 시 널리 사용되는 상용 프로그램에 하중 조건을 입력시켜 터널 라이닝의 단면 위치별 변위와 응력을 산출하였다. 산출된 변위를 계측 측점 3점, 5점, 7점으로 복선터널 라이닝 역해석 프로그램에 입력시켜서 구한 응력과 변위를 비교하여 복선터널 라이닝의 최적 계측 측점수를 산정한 결과 정확도는 측점 3점이 낮고, 측점 5점과 7점이 높으며, 현장 적용성은 측점 5점이 높은 것으로 해석되어 터널 계측 실무와 일치하는 것으로 나타났다.

  • PDF

Proposal of the Modified Management Criteria Value in Earth Retaining Structure using Measured Data (계측자료를 이용한 흙막이 구조물의 수정된 관리기준치 제안)

  • Kim, Jueng-Kyu;Park, Heung-Gyu;Nam, Jin-Won
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.20 no.1
    • /
    • pp.95-103
    • /
    • 2016
  • The absolute value management method is widely used in the most of the earth retaining construction, which evaluates the safety by comparing measurement result and management criteria. Therefore, the management criteria is the standard to evaluate the safety of the site, and in other words, the criteria is a direct factor of the evaluation. That means that the safety of the site can not be acquired if the management criteria is not proper, even though the measurement system is perfectly set. However, many of field technicians do not have rely on the current management criteria, and they even recognize the necessity of the revision. Therefore, in this study, the necessity of the revision was studied. Also, the optimum criteria selection and the application were performed based on the test results of earth retaining deflection and probabilistic theory. The absolute value management method was used for this study. The details are tabulated.