Abstract
Large-scale collapse happened under excavation construction in the past. But, recently the trend that it is completed safely to minimize damages is growing because of increasing levels of design review and detecting signs of problems before the outbreak of large-scale collapse with proactive planning of measurement. In this paper, through studying case collapses over the past, it put the cause of the collapse in order. And then, after reviewing general information on management and utilization of measurement methods which importantly emerging recently, the type and cause of the problem during the excavation was reviewed. And the causes of problem were analyzed by targeting the site which unusual symptoms happened on measuring results under construction. In this study, the awareness that measurement management and subsurface investigation is highly important will increase for preventing large-scale collapse in advance.
과거에는 굴착공사 중 사고발생의 경우 대부분 대규모 붕괴로 연결되는 경우가 많았다. 그러나 최근에는 설계검토 수준의 향상 및 공사 중 적극적인 계측계획의 수립 등으로 대규모 붕괴로 연결되기 전 문제발생 징후를 사전 감지, 피해를 최소화하여 공사를 안전하게 완료하는 경우가 많아지고 있다. 본 논문은 먼저 과거 붕괴사례 조사를 통해 과거의 붕괴원인에 대해 정리하였다. 다음으로 최근에 중요하게 대두되고 있는 계측관리에 대한 일반사항 및 활용방법에 대해 살펴보고 굴착공사 중 문제발생 유형 및 원인에 대해 검토하였다. 또한 실제 시공 중 계측결과 이상 징후가 나타난 현장을 대상으로 계측결과와 연계하여 문제발생 원인 및 보강대책을 검토하였다. 본 연구를 통해 굴착공사 중 대규모 붕괴사고를 사전에 방지하기 위해서 계측관리 및 지반조사가 매우 중요한 사항이라는 인식이 증대될 것으로 판단된다.