Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.458-461
/
2006
With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.
Journal of the Korea Institute of Building Construction
/
v.11
no.1
/
pp.73-81
/
2011
The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.
In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.
Kim, Woo-Kyum;Kim, Jin-Hwan;Lee, Bok-Hyung;Park, Han-Woo
Proceedings of the KIEE Conference
/
2007.07a
/
pp.104-106
/
2007
전력계통의 평상시 전류개폐, 고장구간을 신속히 차단 및 재투입하기 위해 차단기(CIRCUIT BREAKER)를 설치 운영하고 있다. 차단기를 조작방식에 따라 분류해 보면 압축공기압 조작방식과 유압 조작방식, 전동스프링 조작방식으로 크게 나눌 수 있으며 본 연구는 최근에 지속적으로 지연동작을 일으키는 압축공기 조작방식의 문제점 분석과 대책을 마련하고자 한다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.3D
/
pp.363-369
/
2008
Change is inevitable and is a reality of construction projects. Change adjustment includes the cost associated with materials, labor, etc. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. What is needed is a reliable method to identify and quantify the loss of productivity caused by cumulative impact of change orders. This study survey the change orders data in domestic area for public construction and analyze to quantify change order impact. This study developed concepts of "%CO", "%Delta", "%T" to capture change order effect on project and search the relationships between them. Finally, this study find strong relationship between change order and loss.
Korean Journal of Construction Engineering and Management
/
v.7
no.2
s.30
/
pp.109-117
/
2006
Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.
Korean Journal of Construction Engineering and Management
/
v.8
no.3
/
pp.125-133
/
2007
If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.
Proceedings of the Korean Information Science Society Conference
/
2007.10d
/
pp.317-322
/
2007
IPv6 이동성 관리를 위한 기존의 호스트 기반 프로토콜인 Mobile IPv6는 오랜 기간 동안 많은 연구에 의해 표준화되어진 안정적인 기술이지만 실제 상용망에서는 잘 사용이 안되고 있다. 그 이유는 단말의 수정 요구, 과도한 유/무선 자원 사용, 느린 핸드오버 지연시간 등이 있다. 이와 같은 Mobile IPv6의 단점을 극복하기 위하여 개발된 네트워크 기반 이동성 관리 프로토콜인 Proxy Mobile IPv6가 최근에 주목받고 있다. Proxy Mobile IPv6는 단말에서의 이동성 지원을 위한 수정이 필요하지 않으며, 유/무선 자원도 효율적으로 사용하며, 핸드오버 지연시간도 단축된다는 장점을 지니고 있다. 본 논문에서는 Proxy Mobile IPv6와 기존 호스트 기반 프로토콜인 Mobile IPv6, Hierarchical Mobile IPv6를 체계적으로 분석하고 핸드오버 지연시간을 비교 분석한다. 비교 분석 결과로서 Proxy Mobile IPv6는 기존 기법들보다 약 $84{\sim}93%$ 정도의 핸드오버 지연시간 단축이 있음을 알 수 있다.
Kim, Beop-su;Seong, Gi-gang;Bae, In-ho;Bang, Hong-soon;Choi, Hyeong-jin;Kim, Ok-kyue
Korean Journal of Construction Engineering and Management
/
v.20
no.4
/
pp.104-113
/
2019
Construction dispute about Extension of Time are complexly intertwined with various issues. The duration delay analysis defines the impact the issue has on the duration variation. And The international court and the arbitrator use the results of the analysis as a basis for reasonable duration judging. However, most of the domestic Construction sites have not established a business process for Extension of Time litigation. Therefore, Analysis data are collected after the occurrence of the dispute, there is not enough basic data of analysis almost. This study sought to improve the management efficiency by organizing information requirement for delay analysis and suggesting a reasonable business process. As a result of applying the proposed process to actual construction duration extension disputes, about 33% of practitioners, 46% of contractors, and 48% of legal advisors were satisfied with the process application site And Matrix validation was 91% identical. This study suggests that it is possible to increase the efficiency of the construction duration analysis work used as a basis in the construction dispute. Finally, the Computer based system design for this process should continue in the future.
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.6
/
pp.841-849
/
2023
Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.