• Title/Summary/Keyword: 공기지연분석

Search Result 139, Processing Time 0.033 seconds

A Basic Study on the Improvement for Liquidated Damages at Construction Delay (지체상금 개선방안에 관한 기초연구)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.458-461
    • /
    • 2006
  • With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.

  • PDF

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

A Study on the Improvement of Railway Construction Schedule Using KTX Construction Case (경부고속철도 사례분석을 통한 철도건설공기 개선에 관한 연구)

  • Yang, Yeonjong;Chung, Byunghyun
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.6
    • /
    • pp.662-669
    • /
    • 2012
  • In 2004, KTX operated in Korea on the 5th in the world. But there are various factor on planed schedule delay of Big National Construction Project like Seoul-Busan High Speed Rail Project(Seoul-Busan HSR). For example, Often change of government policy, project management control problem of design and construction, conflict of interested party like environmental organization/resident are the main delay factors. The suggestions for improvement of the construction schedule through the Seoul-Busan HSR will help to make a new leap forward in rail construction.

The research for causes of delayed breaking of circuit-breaker driven by compressed air and solutions (압축공기 조작방식 차단기의 지연차단원인 및 해결방안에 관한 연구)

  • Kim, Woo-Kyum;Kim, Jin-Hwan;Lee, Bok-Hyung;Park, Han-Woo
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.104-106
    • /
    • 2007
  • 전력계통의 평상시 전류개폐, 고장구간을 신속히 차단 및 재투입하기 위해 차단기(CIRCUIT BREAKER)를 설치 운영하고 있다. 차단기를 조작방식에 따라 분류해 보면 압축공기압 조작방식과 유압 조작방식, 전동스프링 조작방식으로 크게 나눌 수 있으며 본 연구는 최근에 지속적으로 지연동작을 일으키는 압축공기 조작방식의 문제점 분석과 대책을 마련하고자 한다.

  • PDF

A Study on the Estimation of Change Orders Impact for the Public Construction (공공건설공사 설계변경에 따른 손실 추정에 관한 기초연구)

  • Lee, Min-Jae;Park, Bum-Jin;Im, Keon-Soon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.363-369
    • /
    • 2008
  • Change is inevitable and is a reality of construction projects. Change adjustment includes the cost associated with materials, labor, etc. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative impact of the changes. What is needed is a reliable method to identify and quantify the loss of productivity caused by cumulative impact of change orders. This study survey the change orders data in domestic area for public construction and analyze to quantify change order impact. This study developed concepts of "%CO", "%Delta", "%T" to capture change order effect on project and search the relationships between them. Finally, this study find strong relationship between change order and loss.

Competitive Advantage Strategy of Construction Duration by SWOT Analysis (SWOT 분석을 통한 건설기업의 공기경쟁력 강화 전략)

  • Kim, Sun-Kuk;Lee, Hyun-Soo;Ryu, Han-Guk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.2 s.30
    • /
    • pp.109-117
    • /
    • 2006
  • Recent rapid changes such as construction market reduction, lowest bidding system of construction cost, five days per week system, and post-construction sale system are inevitably accelerating the competitiveness between construction companies. Those rapid changes of construction environment require construction companies, which are main participants of construction industry, to adapt to the changes and more to lead new construction environment. However, there are many construction uncertainties which could delay construction completion. Without the proper identification of construction uncertainties, structured strategy establishment and management of construction schedule, the competitive advantages of construction duration could not be made. Thus this paper limited the research boundary to construction duration competitiveness instead of general strategy establishment. Recognizing the importance of proper calculation of construction duration, requirements of construction duration reduction and limited researches related to construction schedule strategy, we established the 25 strategies for construction duration competitivenss by internal and external construction environment analysis and SWOT analysis, and then elicited the first considerations to accomplish the strategies through concensus of all the staffs by questionnaire, brainstroming and face-to-face interviews.

An Administration Model for Causation of the Schedule Delays in Construction Projects (건설공사 공기연장사유 관리모델)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.125-133
    • /
    • 2007
  • If project time extension were required in the construction projects, either liquidated damages or extension costs should be applied according to causation of the schedule delays. However, in actual cases it is not applied so far according to the contract conditions. The reason why this situation happened Is that function of the present planning and scheduling is not working feasibly. The CPM schedule could not provide a proper solution for apportioning responsibility for the schedule delays. This situation could be considered as breach of contract and will cause potential disputes for schedule delay. Therefore, in this research process based contract administration model for construction delay claim is proposed to prevent schedule delay and solve the claims. The model is based on pro-active management for causation of delay to provide apportionment of responsibility and written evidences.

Handover Performance Evaluation for Proxy Mobile IPv6 (Proxy Mobile IPv6의 핸드오버 성능 평가)

  • Hyeon, Seung-Il;Han, Youn-Hee;Kong, Ki-Sik;Shin, Myung-Ki;Jeong, Sang-Jin
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2007.10d
    • /
    • pp.317-322
    • /
    • 2007
  • IPv6 이동성 관리를 위한 기존의 호스트 기반 프로토콜인 Mobile IPv6는 오랜 기간 동안 많은 연구에 의해 표준화되어진 안정적인 기술이지만 실제 상용망에서는 잘 사용이 안되고 있다. 그 이유는 단말의 수정 요구, 과도한 유/무선 자원 사용, 느린 핸드오버 지연시간 등이 있다. 이와 같은 Mobile IPv6의 단점을 극복하기 위하여 개발된 네트워크 기반 이동성 관리 프로토콜인 Proxy Mobile IPv6가 최근에 주목받고 있다. Proxy Mobile IPv6는 단말에서의 이동성 지원을 위한 수정이 필요하지 않으며, 유/무선 자원도 효율적으로 사용하며, 핸드오버 지연시간도 단축된다는 장점을 지니고 있다. 본 논문에서는 Proxy Mobile IPv6와 기존 호스트 기반 프로토콜인 Mobile IPv6, Hierarchical Mobile IPv6를 체계적으로 분석하고 핸드오버 지연시간을 비교 분석한다. 비교 분석 결과로서 Proxy Mobile IPv6는 기존 기법들보다 약 $84{\sim}93%$ 정도의 핸드오버 지연시간 단축이 있음을 알 수 있다.

  • PDF

An Design of Analyzing Process by Construction Extension of Time (공기연장 분쟁의 공사기간 분석 프로세스 설계에 관한 연구)

  • Kim, Beop-su;Seong, Gi-gang;Bae, In-ho;Bang, Hong-soon;Choi, Hyeong-jin;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.104-113
    • /
    • 2019
  • Construction dispute about Extension of Time are complexly intertwined with various issues. The duration delay analysis defines the impact the issue has on the duration variation. And The international court and the arbitrator use the results of the analysis as a basis for reasonable duration judging. However, most of the domestic Construction sites have not established a business process for Extension of Time litigation. Therefore, Analysis data are collected after the occurrence of the dispute, there is not enough basic data of analysis almost. This study sought to improve the management efficiency by organizing information requirement for delay analysis and suggesting a reasonable business process. As a result of applying the proposed process to actual construction duration extension disputes, about 33% of practitioners, 46% of contractors, and 48% of legal advisors were satisfied with the process application site And Matrix validation was 91% identical. This study suggests that it is possible to increase the efficiency of the construction duration analysis work used as a basis in the construction dispute. Finally, the Computer based system design for this process should continue in the future.

Development of SVM-based Construction Project Document Classification Model to Derive Construction Risk (건설 리스크 도출을 위한 SVM 기반의 건설프로젝트 문서 분류 모델 개발)

  • Kang, Donguk;Cho, Mingeon;Cha, Gichun;Park, Seunghee
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.841-849
    • /
    • 2023
  • Construction projects have risks due to various factors such as construction delays and construction accidents. Based on these construction risks, the method of calculating the construction period of the construction project is mainly made by subjective judgment that relies on supervisor experience. In addition, unreasonable shortening construction to meet construction project schedules delayed by construction delays and construction disasters causes negative consequences such as poor construction, and economic losses are caused by the absence of infrastructure due to delayed schedules. Data-based scientific approaches and statistical analysis are needed to solve the risks of such construction projects. Data collected in actual construction projects is stored in unstructured text, so to apply data-based risks, data pre-processing involves a lot of manpower and cost, so basic data through a data classification model using text mining is required. Therefore, in this study, a document-based data generation classification model for risk management was developed through a data classification model based on SVM (Support Vector Machine) by collecting construction project documents and utilizing text mining. Through quantitative analysis through future research results, it is expected that risk management will be possible by being used as efficient and objective basic data for construction project process management.