• Title/Summary/Keyword: 공기와 공사비

Search Result 231, Processing Time 0.032 seconds

Case Study of Explosive Demolition for a Structure in Urban Area (Explosive Demolition of Former Sung-Nam City Hall to Construct Sung-Nam City Hospital) (도심지 구조물 발파해체 적용사례 (성남시 의료원 건립을 위한 구성남시청사 발파해체))

  • Jung, Min-Su;Song, Young-Suk;Heo, Eui-Haeng;Kim, Hyo-Jin
    • Explosives and Blasting
    • /
    • v.30 no.1
    • /
    • pp.17-28
    • /
    • 2012
  • Building demolitions at urban area make some inconvenience to neighborhood through generating noises, ground vibrations, and dusts. For this reason, various methods to control such environmental impacts have been being designed and practiced. Among the methods, the use of explosive demolition is rapidly increasing because it can minimize the inconveniency as well as decrease the working time and cost. In this respect, the old Sung-Nam city hall, which was a Rahmen structure comprised of beams, slabs and columns, was decided to be demolished by explosive demolition. This paper shows that explosive demolition can be the most suitable way of removing old buildings eco-friendly, safely, and economically by showing the observation results obtained from the actual demolition operation for the Sung-Nam city hall.

Guideline for Web 2.0 Cluster based Process and Performance Management System (Web 2.0 Cluster 기반의 공정 및 성과관리 시스템 구축에 따른 운영방안 제시)

  • Ong, Ho-Kyoung;Ahn, Jae-Gyu;Kim, Dae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.899-904
    • /
    • 2007
  • Process management techniques are highly important in the construction industry. However, indicators or details of assessment which will show process management and its performance are still very insufficient. In particular, it is true that local corporations or small and medium sized companies suffer more difficulties than ones in metropolitan areas. Therefore, it is necessary to prepare a flexible process management and performance assessment system suited to field situations. This study identified problems of local small and medium sized companies, implemented a process and performance management system using the Lean concept, and systemized a web-based system. Also, the study proposed operational strategies so that small and medium construction companies may access and use the system easily. This will ensure the competitiveness of local small and medium sized companies, will pursue visible outcomes such as construction period reduction and construction cost reduction, and will be utilized as data related to performance assessment both during construction progress and after construction.

  • PDF

A Study on the Establishment of Governance for Water-Saving in Agricultural Water (농업용수의 물절약을 위한 거버넌스 구축 연구)

  • Lee, Seul Gi;Choi, Kyung Sook
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.365-365
    • /
    • 2021
  • 기후변화로 인하여 발생하는 자연재해는 수많은 인명 및 재산 피해를 일으키며, 그 중에서도 가뭄은 물과 식량의 안보를 위협하고 있다. 이에 OECD(2015)는 미래의 세계 인구 40%가 2050년까지 물이 부족한 강 유역에서 살 것이라 예측하고 있으며, 물의 다층적 거버넌스를 개발하여 물을 효과적으로 사용하기 위한 상향식 의사결정, 통합물관리 체제의 개념을 제시하기도 하였다. 우리나라 역시 가뭄으로 인한 피해발생이 빈번하고, 그 강도나 범위가 점차 증가하는 추세이다. 하지만 2000년부터 한국농어촌공사(출범은 '농업기반공사')가 농업용수를 관리해오고 있으며, 농업용 수리시설의 증축, 관리 등이 공적인 관리쳬계로 변화해오면서 자연스럽게 농업인의 물관리는 배제되었다. 또한, 농업용수는 무상·무제한 공공재라는 인식과 농업인 평균 연령이 높아짐에 따라 농업인의 물꼬관리 및 수로 훼손, 무단취수 행위 등에 대한 제제가 불가능한 실정이다. 본 연구에서 최근 농식품부의 「2019년 정부가뭄종합대책」에 포함되어 있는 물절약 거버넌스 구축 및 운영 내용을 바탕으로 농업용수 관리 및 사용구조를 고려하여 두 개 지역의 농어촌공사(여주이천지사, 경주지사) 주도 하에 거버넌스를 간담회 형식으로 운영하였다. 농업용수 물절약 거번넌스 이해관계자들은 각 지역별 공기업, 공무원, 농업인, 언론인, 학계 전문가 등이 참가하였으며, 거버넌스 운영 2회 및 설문조사를 실시하였다. 그 결과 각 이해관계자들은 농업용수 절약을 위한 현재 문제점 및 해결방안 등에 대한 의견을 제시하였으며, 설문조사를 통하여 농어촌공사의 신뢰도 및 중요도가 가장 높고, 높은 중요도에 비하여 농업인 및 지자체 등은 신뢰도가 낮은 것을 확인 할 수 있었다. 이러한 결과는 농업인이 농업용수에 대한 주인의식을 가지고, 적극적이고 자발적인 참여가 필요하다는 것을 보여주고 있으며, 본 연구를 통하여 이루어진 간담회 형식의 거버넌스보다 운영효과 및 지속성을 유지할 수 있는 형태의 거버넌스가 연구되어야한다. 향후 농촌형물 거버넌스 모형이 개발되기 위하여 본 연구는 기초자료로 활용할 수 있다.

  • PDF

A Study on the Recycling of Agricultural Films by Air Washing (공기세척에 의한 농업용 폐필름의 재활용 연구)

  • Kim, R. K.;Kang, M.;Lee, J. M.;Yoon, T. H.
    • Resources Recycling
    • /
    • v.8 no.3
    • /
    • pp.3-8
    • /
    • 1999
  • An air-washer was developed in order to remove the soil on the films collected from agricultural use, The washed films were subjected to TGA analysis to measure the residual soil content and DSC analysis to evaluate composition as well as compositional ratro, Mechanical properties of washed films were measured via tensile test ,md the properties of washed films were compared with those of neat resin blend. Major component of air washed films was polyethylene, and compositional ratio was 10:6:3:1 (HDPE:LLDPE:LDPE:EVA). 30 min air-washed films showed 2.1 % of residual soil content, while the water washed films had 1.5%. Tensile properties of washed (air and water) films were almost same as those of neat resin mixture.

  • PDF

Hydration Heat Control of Marine Pier Foundation using Low-Heat Cement and Mesh Form (저발열 콘크리트와 Mesh형 거푸집을 이용한 교각기초의 수화열 저감 방안 연구)

  • Cho, Yong-Yeon;Lee, Won-Joon;Won, Jong-Hwa;Kim, Tae-Min;Kim, Moon-Kyum
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.315-318
    • /
    • 2009
  • 본 논문에서는 해상 기초 교각 매스 콘크리트의 수화열 저감 방안을 다루었다. 저발열 콘크리트, Mesh형 거푸집 공법 등에 대한 실험을 수행하여 각각의 수화열 저감효과를 평가하였다. 현장 실험은 사용 시멘트와 거푸집의 종류, 거푸집의 사용 면수에 따라 총 4 type으로 구성하였으며, 이에 대한 실험 결과와 유한 요소 해석 결과를 비교, 검증하여 최종적인 수화열 저감 성능을 도출하고자 하였다. 실험을 통해, 저발열 시멘트와 유로폼을 사용하는 것이 수화열 저감을 위해 효과적인 방법으로 판명되었으나 추가 공사비의 발생으로 효율성이 떨어질 것으로 판단된다. 또한 Mesh형 거푸집 적용 면 수와 온도 상승 저감 효과는 비례하는 것을 알 수 있었지만 내 외부 온도차가 다소 크게 나타나 수화열에 의한 균열 발생 확률면에서는 다소 불리하게 나타났다. 그러나 실험 단계에서 생략된 양생과 관리를 통하여 균열의 저감효과를 거둘 수 있을 것으로 판단되며, 추가적으로 거푸집 해체 단계를 생략함으로 공기단축 측면에서 유리할 것으로 판단된다.

  • PDF

A Study on the Development Direction of a BIM Performance Assessment Tool (BIM 수행성과 평가도구의 개발방향에 대한 연구)

  • Kang, Tae Wook;Won, Jongsung;Lee, Ghang
    • Spatial Information Research
    • /
    • v.21 no.1
    • /
    • pp.53-62
    • /
    • 2013
  • The purpose of this study is to suggest the development direction of a BIM performance assessment tool. To do this, a series of focused group interviews were conducted with BIM experts in South Korea regarding the objective, characteristic, potential problems of a BIM performance assessment tool. A survey questionnaire was developed based on the focused group interviews and distributed to practitioners through four different occasions. The survey results showed that there were the significant differences between practitioners by their field and years of experience about the objective, characteristic, potential problems of a BIM performance assessment tool. Based on the survey results, the consideration factors for developing a BIM performance assessment tool was suggested.

Study on numerical analysis for capability improvement of long span bridge with orthotropic steel deck (장지간 교량의 강바닥판 성능 강화를 위한 수치해석 연구)

  • Kong, Byung-Sueng;Kim, Jae-Gon
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.669-672
    • /
    • 2011
  • 본 논문은 사하중 절감이 중요한 장지간 교량에 있어서 유리한 구조를 가지는 강바닥판의 성능 강화를 위한 수치해석 연구를 실시하였다. 이미 국내외에서는 다수의 강바닥판을 이용한 교량의 시공 사례가 많으며, 앞으로도 시공 또는 계획될 해상 장지간 교량에서도 강바닥판 교량의 사례가 많을 것으로 판단된다. 강바닥판 교량은 공기를 단축할 수 있으며, 들보의 높이가 작아서 날씬한 형상으로 할 수 있기 때문에 미관을 향상 시킬 수 있을 뿐만 아니라 가설 공사비를 절감시킬 수 있는 등 많은 장점을 갖고 있다. 하지만 강바닥판은 이상과 같이 장점을 갖는 구조이지만 비교적 얇은 강판을 복잡한 형상으로 용접하여 조립함에 용접 결함, 잔류응력, 면내 및 면외 변형의 발생 등의 문제점이 지적되고 있다. 따라서 외국에서는 강바닥판의 피로 손상에 대한 실험 및 연구로 많은 자료를 확보하고 있으며, 국내에서도 국내 현실에 맞는 강바닥판의 피로거동 및 피로강도 향상방안에 관한 연구가 더욱더 필요하다. 본 연구에서는 국내교량에 적용되고 있는 구조상세 및 구조해석을 실시하여 강바닥판의 피로거동과 응력 특성을 파악하고, 피로강도를 향상하는 방법으로 Bulkhead Plate와 수직리브 형상 및 부착에 따른 거동을 분석하고, 최적상세를 도출하여 강바닥판의 적극적인 활용화에 그 목적이 있다.

  • PDF

A Study on the Correlation Analysis of Construction Period and Defect Repair Costs of Apartment Housing (공동주택 공사기간 및 하자보수비용의 상관관계 분석 연구)

  • Lee, Young-Jae;Cho, Dong-Hyun;Lee, Mi-Young;Park, Sang-Hun;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.48-49
    • /
    • 2019
  • The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.

  • PDF

A Case Study of the Construction Management Applied to I-Project (I-프로젝트의 건설사업 관리(Construction Management) 적용사례)

  • Kim Jong-Hoon;Seo Bong-Whan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.102-112
    • /
    • 2001
  • It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.

  • PDF

Probabilistic Earlier GMP Calculation Method for Apartment Using CM at Risk (CM at Risk를 적용한 공동주택의 확률론적 초기 GMP 산정방안)

  • Hyun, Chang-Taek;Go, Gun-Ho;Jin, Zhengxun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.3
    • /
    • pp.295-303
    • /
    • 2018
  • In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.