Building demolitions at urban area make some inconvenience to neighborhood through generating noises, ground vibrations, and dusts. For this reason, various methods to control such environmental impacts have been being designed and practiced. Among the methods, the use of explosive demolition is rapidly increasing because it can minimize the inconveniency as well as decrease the working time and cost. In this respect, the old Sung-Nam city hall, which was a Rahmen structure comprised of beams, slabs and columns, was decided to be demolished by explosive demolition. This paper shows that explosive demolition can be the most suitable way of removing old buildings eco-friendly, safely, and economically by showing the observation results obtained from the actual demolition operation for the Sung-Nam city hall.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.899-904
/
2007
Process management techniques are highly important in the construction industry. However, indicators or details of assessment which will show process management and its performance are still very insufficient. In particular, it is true that local corporations or small and medium sized companies suffer more difficulties than ones in metropolitan areas. Therefore, it is necessary to prepare a flexible process management and performance assessment system suited to field situations. This study identified problems of local small and medium sized companies, implemented a process and performance management system using the Lean concept, and systemized a web-based system. Also, the study proposed operational strategies so that small and medium construction companies may access and use the system easily. This will ensure the competitiveness of local small and medium sized companies, will pursue visible outcomes such as construction period reduction and construction cost reduction, and will be utilized as data related to performance assessment both during construction progress and after construction.
Proceedings of the Korea Water Resources Association Conference
/
2021.06a
/
pp.365-365
/
2021
기후변화로 인하여 발생하는 자연재해는 수많은 인명 및 재산 피해를 일으키며, 그 중에서도 가뭄은 물과 식량의 안보를 위협하고 있다. 이에 OECD(2015)는 미래의 세계 인구 40%가 2050년까지 물이 부족한 강 유역에서 살 것이라 예측하고 있으며, 물의 다층적 거버넌스를 개발하여 물을 효과적으로 사용하기 위한 상향식 의사결정, 통합물관리 체제의 개념을 제시하기도 하였다. 우리나라 역시 가뭄으로 인한 피해발생이 빈번하고, 그 강도나 범위가 점차 증가하는 추세이다. 하지만 2000년부터 한국농어촌공사(출범은 '농업기반공사')가 농업용수를 관리해오고 있으며, 농업용 수리시설의 증축, 관리 등이 공적인 관리쳬계로 변화해오면서 자연스럽게 농업인의 물관리는 배제되었다. 또한, 농업용수는 무상·무제한 공공재라는 인식과 농업인 평균 연령이 높아짐에 따라 농업인의 물꼬관리 및 수로 훼손, 무단취수 행위 등에 대한 제제가 불가능한 실정이다. 본 연구에서 최근 농식품부의 「2019년 정부가뭄종합대책」에 포함되어 있는 물절약 거버넌스 구축 및 운영 내용을 바탕으로 농업용수 관리 및 사용구조를 고려하여 두 개 지역의 농어촌공사(여주이천지사, 경주지사) 주도 하에 거버넌스를 간담회 형식으로 운영하였다. 농업용수 물절약 거번넌스 이해관계자들은 각 지역별 공기업, 공무원, 농업인, 언론인, 학계 전문가 등이 참가하였으며, 거버넌스 운영 2회 및 설문조사를 실시하였다. 그 결과 각 이해관계자들은 농업용수 절약을 위한 현재 문제점 및 해결방안 등에 대한 의견을 제시하였으며, 설문조사를 통하여 농어촌공사의 신뢰도 및 중요도가 가장 높고, 높은 중요도에 비하여 농업인 및 지자체 등은 신뢰도가 낮은 것을 확인 할 수 있었다. 이러한 결과는 농업인이 농업용수에 대한 주인의식을 가지고, 적극적이고 자발적인 참여가 필요하다는 것을 보여주고 있으며, 본 연구를 통하여 이루어진 간담회 형식의 거버넌스보다 운영효과 및 지속성을 유지할 수 있는 형태의 거버넌스가 연구되어야한다. 향후 농촌형물 거버넌스 모형이 개발되기 위하여 본 연구는 기초자료로 활용할 수 있다.
An air-washer was developed in order to remove the soil on the films collected from agricultural use, The washed films were subjected to TGA analysis to measure the residual soil content and DSC analysis to evaluate composition as well as compositional ratro, Mechanical properties of washed films were measured via tensile test ,md the properties of washed films were compared with those of neat resin blend. Major component of air washed films was polyethylene, and compositional ratio was 10:6:3:1 (HDPE:LLDPE:LDPE:EVA). 30 min air-washed films showed 2.1 % of residual soil content, while the water washed films had 1.5%. Tensile properties of washed (air and water) films were almost same as those of neat resin mixture.
Proceedings of the Computational Structural Engineering Institute Conference
/
2009.04a
/
pp.315-318
/
2009
본 논문에서는 해상 기초 교각 매스 콘크리트의 수화열 저감 방안을 다루었다. 저발열 콘크리트, Mesh형 거푸집 공법 등에 대한 실험을 수행하여 각각의 수화열 저감효과를 평가하였다. 현장 실험은 사용 시멘트와 거푸집의 종류, 거푸집의 사용 면수에 따라 총 4 type으로 구성하였으며, 이에 대한 실험 결과와 유한 요소 해석 결과를 비교, 검증하여 최종적인 수화열 저감 성능을 도출하고자 하였다. 실험을 통해, 저발열 시멘트와 유로폼을 사용하는 것이 수화열 저감을 위해 효과적인 방법으로 판명되었으나 추가 공사비의 발생으로 효율성이 떨어질 것으로 판단된다. 또한 Mesh형 거푸집 적용 면 수와 온도 상승 저감 효과는 비례하는 것을 알 수 있었지만 내 외부 온도차가 다소 크게 나타나 수화열에 의한 균열 발생 확률면에서는 다소 불리하게 나타났다. 그러나 실험 단계에서 생략된 양생과 관리를 통하여 균열의 저감효과를 거둘 수 있을 것으로 판단되며, 추가적으로 거푸집 해체 단계를 생략함으로 공기단축 측면에서 유리할 것으로 판단된다.
The purpose of this study is to suggest the development direction of a BIM performance assessment tool. To do this, a series of focused group interviews were conducted with BIM experts in South Korea regarding the objective, characteristic, potential problems of a BIM performance assessment tool. A survey questionnaire was developed based on the focused group interviews and distributed to practitioners through four different occasions. The survey results showed that there were the significant differences between practitioners by their field and years of experience about the objective, characteristic, potential problems of a BIM performance assessment tool. Based on the survey results, the consideration factors for developing a BIM performance assessment tool was suggested.
Proceedings of the Computational Structural Engineering Institute Conference
/
2011.04a
/
pp.669-672
/
2011
본 논문은 사하중 절감이 중요한 장지간 교량에 있어서 유리한 구조를 가지는 강바닥판의 성능 강화를 위한 수치해석 연구를 실시하였다. 이미 국내외에서는 다수의 강바닥판을 이용한 교량의 시공 사례가 많으며, 앞으로도 시공 또는 계획될 해상 장지간 교량에서도 강바닥판 교량의 사례가 많을 것으로 판단된다. 강바닥판 교량은 공기를 단축할 수 있으며, 들보의 높이가 작아서 날씬한 형상으로 할 수 있기 때문에 미관을 향상 시킬 수 있을 뿐만 아니라 가설 공사비를 절감시킬 수 있는 등 많은 장점을 갖고 있다. 하지만 강바닥판은 이상과 같이 장점을 갖는 구조이지만 비교적 얇은 강판을 복잡한 형상으로 용접하여 조립함에 용접 결함, 잔류응력, 면내 및 면외 변형의 발생 등의 문제점이 지적되고 있다. 따라서 외국에서는 강바닥판의 피로 손상에 대한 실험 및 연구로 많은 자료를 확보하고 있으며, 국내에서도 국내 현실에 맞는 강바닥판의 피로거동 및 피로강도 향상방안에 관한 연구가 더욱더 필요하다. 본 연구에서는 국내교량에 적용되고 있는 구조상세 및 구조해석을 실시하여 강바닥판의 피로거동과 응력 특성을 파악하고, 피로강도를 향상하는 방법으로 Bulkhead Plate와 수직리브 형상 및 부착에 따른 거동을 분석하고, 최적상세를 도출하여 강바닥판의 적극적인 활용화에 그 목적이 있다.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.11a
/
pp.48-49
/
2019
The number of disputes over defects after completion of construction work in apartment buildings is increasing every year. In this situation, the prediction of reasonable defect repair costs is very important. In this paper, we are going to collect basic data for predicting defect repair costs through the correlation analysis of the construction period and defect repair cost of apartment houses. For this purpose, first of all, the construction period and defect repair cost of apartment houses were analyzed to analyze the construction period for each type of work, the construction period for each project type, and the construction period for each standard calculation. Next, the correlation between defect repair cost and the independent variables of the candidate was conducted. According to the analysis, the ratio of framing air, the ratio of finishing air, and the number of delay days showed strong correlation.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.102-112
/
2001
It has been passed $5\~6$ years since Construction Management introduced in Korea, but a few government projects have been presented as CM instances. We performed CM service, on behalf of the foreign Client, in the Insa-dong construction, I-Project. Even though there were many limits in cost, time and other aspects, we have attained satisfaction of the Client and successful businesses of all the construction parties as adopting the advanced management methods. Many advanced construction methods have been applied for the purpose of time reduce, cost save and quality assurance as well as to the webbased project management has been imported to overcome the limits of time and place. They have actualized to increase the productivity of the project by managing the floor to floor cycle and quality systemically pursuant to ISO 9002, and by adopting Real-name construction and completion system (or individual activity. While carrying out this project, it is possible to establish mutual reliability and understanding enable to resolve the issues occurring in the early stage due to insufficient understanding of CM, lack of communications and team work, indistinct work scope through continuos training and conferences. Additionally, we became to share business targets among the parties and promoted the project in confidence. We wish that the success of I- project to be rated as a standard model of CM in Korea.
Journal of the Korea Institute of Building Construction
/
v.18
no.3
/
pp.295-303
/
2018
In the DBB delivery system, the design stage and the construction stage are separated. Because of this, design changes frequently occur, and problems such as construction cost overrun, schedule delay, and quality deterioration happen as well. Recently, in the construction industry CM at Risk(CM@R) delivery system, which can systematically solve the above-mentioned problems of DBB delivery system, meet various demands of clients, and overcome the limited cost and period. In the CM@R delivery system, the contractor negotiates for a maximum guaranteed price(GMP) with the client at the design stage, and the CM performer carries out the construction within the GMP. However, uncertainties are inherent in the GMP calculation because the calculation is based on unfinished drawings and documents. In this study, a Probabilistic Earlier GMP Calculation Method by combining a probabilistic tool of Monte Carlo simulation with a case based reasoning is proposed so that the uncertainty in GMP calculation is reflected. After the earlier GMP is calculated, a process to calculate the $2^{nd}$ GMP at the time of around 80 % of detailed deign and to negotiate with the client to fix the final GMP is proposed. The Probabilistic Earlier GMP Calculation Method is verified through the case study. In this study, researchers set the range of GMP through the proposed probabilistic GMP calculation and tried to reduce the risk through negotiation between the client and the CM performer. The proposed method and process would contribute to the successful introduction of CM@R in Korea.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.