A Case Study on Minimizing Contract Amount Adjustments due to Design Changes in Defense and Military Facility Projects (국방·군사시설 사업의 설계변경 계약금액조정 최소화를 위한 사례연구)

  • Cho, Sung-joon;Lee, Kyoung-han;Lee, Myung-sik;Park, Bong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.34-44
    • /
    • 2024
  • In defense and military facility projects, adjustments to contract amounts due to design changes directly or indirectly affect factors such as increased construction costs and extended construction periods. Moreover, they can lead to differences of opinion and conflicts between the military and contracting parties. This case study analyzed the integrated management of defense and military facility projects by the Gyeonggi Southern Facilities Division, which oversees projects in Seoul and the southern Gyeonggi Province region for the Army, Navy, Marine Corps, and Air Force. Out of 388 completed projects, 103 cases with design changes were selected for analysis, aiming to ensure the reliability of data regarding the proportion of design changes in project completion. The study classified samples by the causes of design changes specified in the Ministry of Planning and Finance's contract regulations, assigning rankings based on the occurrence rates of each cause. Furthermore, it analyzed detailed factors for each cause of design change and derived implications to propose improvement measures. Considering the limited access to military primary data, this case study is expected to contribute to minimizing design changes in defense and military facility projects. Additionally, it is anticipated to be practically useful for subsequent research on contract amount adjustments resulting from design changes.

Improvement contract sum adjustment method caused by price fluctuation (물가변동에 의한 계약금액 조정방안 개선 기초연구)

  • Cho Hun-Hee;Seo Jang-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.83-86
    • /
    • 2004
  • Index adjusted ration method has been widely utilized in public construction secter for contract sum adjustment by price fluctuation. In this method. the Production Price Index are used for calculating the base ratio. but the PPI can't reflect the property of construction project in respect of the selected item and weight structure. In this research we prove the problem of using the index adjusted ration method in contract sum adjustment by price fluctuation. and improve it by using the construction cost index. which has the property of construction project. And the result. we figure out the difference between the PPI and CCI by $6.7\%$ in maximum value.

  • PDF

Valuation of highway O&M contract using real option (실물옵션을 활용한 고속 도로 유지관리 계약의 가치산정)

  • Park, Taeil;Shin, Eun-Young;Lee, Yoo-Sub
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.14 no.11
    • /
    • pp.5964-5970
    • /
    • 2013
  • The recent budget planning for highway infrastructure implied that the investments for Operation & Maintenance(O&M) became greater than that for new construction. This circumstance made many stakeholders pay attention to the O&M of road infrastructure and adopt other countries' policies and system for effective management. In other countries, most O&M for road infrastructure have been done by private entities using long-term contract and Korea is about to shift from one year contract to long-term contract. The most important parts for the expansion of the long-term O&M contract for road infrastructure are valuation of the O&M contract based on accurate prediction of O&M costs and instrument for proper risk sharing between contracting parties. Thus, this study provides a methodology to estimate a reasonable O&M contract price and a framework to share contract risk between contracting parties using real option. The analysis results showed that the contract price and ceiling and floor conditions for the 20 year-contract of 20 km-highway project were 45.7, 60 and 42.3 billion won, respectively.

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Determinants of Insurance Products Cross-selling Performance : Focusing on Career Experience (직업경험을 중심으로 한 보험상품 교차판매 성과의 결정요인 분석)

  • Son, WooCheol;Kang, ShinAe
    • Journal of Service Research and Studies
    • /
    • v.9 no.3
    • /
    • pp.39-60
    • /
    • 2019
  • The purpose of this study is to analyze the determinants of insurance product cross selling performance. For the study, 11 insurance managers and 2 sales managers belonging to A insurance agency were selected and in-depth interviews were conducted. The analysis of the research data was done by the open coding method suggested by Strauss & Corbin(2001). As a result, 84 concepts, 28 subcategories and 10 categories were derived. The ten categories that were determinants of insurance product cross-selling performance were personal characteristics, consultation method, cross-selling ratio, sales culture, education, customer change, customer DB provision, satisfaction, business support system, and customer service. In order to verify the qualitative results, quantitative analysis was emplyed to the actual performance data of insurance planners belonging to A insurance agency during April 2016~March 2019. As a result of the analysis, the age, position, and the number of months worked in the insurance company had a statistically significant effect on the number of life insurance contracts in total insurance contracts and life insurance contracts in total insurance contracts. In addition, the age, position, and the number of months worked in the insurance company had a statistically significant negative impact on the number of non-life insurance contracts in the total number of insurance contracts and the total amount of insurance contracts in total insurance contracts. The result of this study can be an important basic data for the development of educational programs and job support systems for the training of insurance planners. Insurance companies should refer to ten categories derived from qualitative research in order to increase the performance of insurance planners and to promote long-term service. Especially, it is necessary to develop specialized education programs and job support systems so that cross sales that increase the proportion of life insurance sales increase.

법령과고시 - 지방계약법 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.276
    • /
    • pp.53-55
    • /
    • 2013
  • 안전행정부가 지방 중소기업의 입찰참가 기회를 확대와 하도급업체 보호 강화를 주요내용으로 하는 "지방자치단체 입찰시 낙찰자 결정기준"과 "지방자치단체 입찰 및 계약집행기준" 예규를 개정하고 7월 1일부터 시행에 들어갔다. 개정된 예규에 따르면 중소기업 지원과 입찰 참여 확대를 위해 5억원 미만 주계약자공동도급 공사에 접근성 평가를 도입해 지역 중소업체의 입찰 참가를 확대하도록 했으며, 하도급업체 보호를 위한 방안으로 원도급자가 하도급계약을 체결하면서 지나치게 하도급금액을 낮추거나 하도급 표준계약서를 사용하지 않거나 하도급 내용을 부당하게 변경하는 등의 사례를 방지하기 위해 공사 적격심사기준을 강화했다.

  • PDF

Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.