• Title/Summary/Keyword: 결정론적 설계

Search Result 436, Processing Time 0.03 seconds

Calibration of Load and Resistance Factors for Breakwater Foundation Design. Application on Different Types of Superstructures (방파제 기초설계를 위한 하중저항계수의 보정(다른 형식의 상부구조 적용))

  • Huh, Jungwon;Doan, Nhu Son;Mac, Van Ha;Dang, Van Phu;Kim, Dong Hyawn
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.33 no.6
    • /
    • pp.287-292
    • /
    • 2021
  • Load and resistance factor design is an efficient design approach that provides a system of consistent design solutions. This study aims to determine the load and resistance factors needed for the design of breakwater foundations within a probabilistic framework. In the study, four typical types of Korean breakwaters, namely, rubble mound breakwaters, vertical composite caisson breakwaters, perforated caisson breakwaters, and horizontal composite breakwaters, are investigated. The bearing capacity of breakwater foundations under wave loading conditions is thoroughly examined. Two levels of the target reliability index (RI) of 2.5 and 3.0 are selected to implement the load and resistance factors calibration using Monte Carlo simulations with 100,000 cycles. The normalized resistance factors are found to be lower for the higher target RI as expected. Their ranges are from 0.668 to 0.687 for the target RI of 2.5 and from 0.576 to 0.634 for the target RI of 3.0.

정보통신연구개발사업의 우선순위 설정과 적정자원 배분 - 다기준의사결정(MCDA) 방법의 적용사례 -

  • 황용수;장진규
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 1999.05a
    • /
    • pp.539-563
    • /
    • 1999
  • 이 논문은 정보통신정책 목표와의 연관성 속에서 정보통신연구개발사업의 우선순위를 설정함과 아울러 비용효과성에 바탕을 둔 적정 자원배분 도출하는데 주안점을 두고 있다. 복합적인 목표를 가진 연구개발사업에 대해 사업부문별 그리고 기술분야별로 객관적이면서도 설득력있는 자원배분지침을 마련하기 위하여 본 연구는 다기준의사결정(MCDA: Multi-criteria Decision Analysis) 방법을 채택하고 있다. 이 방법론에서는 사업의 목표와 우선순위 판단기준 및 사업대안이 계층적으로 연계된 분석구조를 설계하여 사업대안의 우선순위를 먼저 설정하고, 여기에 정수계획법(Integer Programming)을 결합하여 사업의 목표와 연계된 비용-편익 관계(Cost-benefit relationship)를 최적화하는 바탕 위에서 사업대안별 자원배분 시나리오를 제시하게 된다. 이러한 절차로 사업부문별 및 기술분야별로 각각 도출된 8개의 자원배분 시나리오는 자원배분 경향치의 안정성(Stability) 분석과 자금지원의 과부족에 대한 현실적 적합성(Relevance) 분석을 거쳐 최종적으로 하나의 적정 자원배분방안으로 수렴되도록 하였다. 우선순위 설정에 기초가 되는 사업대안의 편익에 대한 자료는 전문가의 정성적 판단을 통해 수집되었는데, 이를 위해 정보통신기술 부문에서 활동 중인 중견 이상의 총 58명의 산학연 전문가를 대상으로 한 조사를 실시하였다. 먼저, 기초기반ㆍ전략기술개발사업, 연구ㆍ기술인력양성사업, 산업응용기술개발사업, 기술기반조성사업 등 4대 사업부문에 대해서는 (ⅰ) 정보통신 기술능력의 축적, (ⅱ) 정보통신산업의 경쟁력 강화, (ⅲ) 정보통신기반의 기술고도화, (ⅳ) 정보화를 위한 기술역량의 제고 등 주요 사업의 편익을 나타내는 4개 기준으로 우선 순위를 판단하였고, 정보통신망기술, 전파 및 RF 기술, 정보처리기술, 반도체 소자/설계 기술 등 13개 기술분야에 대해서는 (ⅰ) 공공정책적 임무에 대한 기여, (ⅱ) 기술자립기반의 확충, (ⅲ) 기술발전성과 기술적 파급효과, (ⅳ) 기술적 산물의 시장잠재력 등 기술분야 연구개발을 통한 편익을 나타내는 4개 기준으로 우선순위를 판단하였다. 우선순위는 사업대안에 대한 가중치로 표시되었고, 적정 자원배분방안은 추정된 총예산 규모에 따라 지원수준에 대한 일정한 제약조건 하에서 비용-편익 관계에 따른 자원의 최적 할당량으로 제시되었다. 본 연구는 총예산 규모의 가변성, 사업 및 기술분야 대안의 분류체계에 대한 공감대 부족, 사업목표의 상호연관성과 우선순위 판단기준의 부분적 중첩성 등 여러 제약요인이 있어 도출된 구체적인 수치보다는 방향성에 더 큰 의미를 부여하는 것이 바람직하다. 그러나, 이러한 연구의 한계에도 불구하고 도출된 우선순위와 적정 자원배분방안은 문제해결의 실행타당성을 감안하여 비교적 객관적이고 균형있는 결과로 판단된다.

  • PDF

중소 금형제조업체의 주문최적화를 위한 전자상거래용 에이전트 개발

  • 최형림;김현수;박영재
    • Proceedings of the CALSEC Conference
    • /
    • 1999.11a
    • /
    • pp.529-534
    • /
    • 1999
  • 전자상거래는 구매자와 판매자 모두에게 많은 이점을 제공할 수 있어 최근 이에 관한 연구들이 많이 진행되고 있다. 특히 중소제조업체의 경우, 전자상거래라는 경영환경의 변화는 새로운 기회로 다가오고 있어, 상대적으로 기술력이 취약한 중소제조업체의 전자상거래를 지원하기 위한 요소 기술들의 개발 필요성이 점차 부각되고 있다. 이에 본 연구에서는 중소 금형제조업체의 판매과정을 사이버 공간에서 수행할 수 있는 전자상거래 기술을 개발하였다. 일반적으로 변화하는 경영환경에서는 생산과 관련된 계획과 통제가 보다 더 신속하고 정확하게 이루어져야 한다. 즉 전자상거래 환경에서의 제조업체는 구매자가 요구한 제품의 생산과 납기일을 맞추어 줄 수 있는지의 여부를 실시간으로 응답할 수 있어야 한다. 나아가서 인터넷을 통해 접수된 주문들은 해당 제조업체의 생산능력을 초과할 수 있는데 이 때에는 접수된 주문들 중에서 자사의 이익을 극대화할 수 있는 주문집합을 선별하여 접수여부를 결정해야 한다. 이와 같이 전자상거래 환경하에서의 제조업체는 생산과 관련된 정보를 신속하게 전달 받아 주문접수여부에 관한 의사결정을 올바르게 수행하는 것이 중요한데 본 연구에서는 중소 금형제조업체의 일정계획 및 주문처리를 위한 일정계획 기반의 선정 에이전트의 구조와 방법론을 제시하였다. 지금까지 일정계획에 관한 연구들은 대부분 납기일의 만족과 비용의 최소화 측면을 위주로 다루었다. 그러나 본 연구에서의 문제는 비용의 최소화보다는 납기일을 준수하면서 가장 많은 이익을 가져다 줄 수 있는 최적주문집합을 선정하는 문제를 다루고있다.자료를 수집하고, 통계분석 패키지를 이용하여 자료를 분석하였다. 방식을 결합한 하이브리드 형태이다.인터넷으로 주문처리하고, 신속 안전한 배달을 기대한다. 더불어 고객은 현재 자신의 물건이 배달되는 경로를 알고싶어 한다. 웹을 통해 물건을 주문한 고객이 자신이 물건의 배달 상황을 웹에서 모니터링 한다면 기업은 고객으로 공간적인 제약으로 인한 불신을 불식시키는 신뢰감을 주게 된다. 이러한 고객서비스 향상과 물류비용 절감은 사이버 쇼핑몰이 전국 어디서나 우리의 안방에서 자연스럽게 점할 수 있는 상황을 만들 것이다.SP가 도입되어, 설계업무를 지원하기위한 기본적인 시스템 구조를 구상하게 된다. 이와 함께 IT Model을 구성하게 되는데, 객체지향적 접근 방법으로 Model을 생성하고 UML(Unified Modeling Language)을 Tool로 사용한다. 단계 4)는 Software Engineering 관점으로 접근한다. 이는 최종산물이라고 볼 수 있는 설계업무 지원 시스템을 Design하는 과정으로, 시스템에 사용될 데이터를 Design하는 과정과, 데이터를 기반으로 한 기능을 Design하는 과정으로 나눈다. 이를 통해 생성된 Model에 따라 최종적으로 Coding을 통하여 실제 시스템을 구축하게 된다.the making. program and policy decision making, The objectives of the study are to develop the methodology of modeling the socioeconomic evaluation, and b

  • PDF

Crack Propagation Analysis for IMO Type-B Independent Tank with Liquefied Natural Gas Carrier (LNG 운반선에 적용된 독립형 탱크의 균열 진전 해석에 관한 연구)

  • Kim, Beom-il;Shafiqul, Islam MD
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.4
    • /
    • pp.529-537
    • /
    • 2021
  • Membrane-type hull and cargo holds have been designed and built for large ship. However, there is a growing interest in applying the same technology to small and medium-sized Liquefied natural gas(LNG) carriers to meet the recent increase in demand for LNG as an ecofriendly fuel and for expanding LNG bunkering infrastructure. The purpose of this study is to apply the IMO Type-B tank to small and medium-sized LNG carriers and verify the safety and suitability of the design. Fatigue crack propagation analysis was performed to install a partial second drip tray installed at the lower part of the LNG cargo tank by calculating the amount of leaked gas in the support structure supporting the cargo tank. First, a program for fatigue crack propagation analysis was developed, in which Paris' law and British Standard 7910 (BS 79110) were applied based on the International Code for the Construction of Equipment and Ships Carrying Liquefied Gases in Bulk, an international standard for LNG carriers. In addition, a surface crack propagation analysis was performed. Next, a methodology for assuming the initial through-crack size was developed to determine the size of the partial second barrier. The analysis was performed for 15 days, which is a possible return time after cracks are detected. Finally, the safety and suitability of the IMO Type-B for LNG cargo tanks required by international regulations were verified. For the accurate analysis of fatigue crack propagation, it is necessary to develop and verify the analysis procedure based on direct analysis and international regulations.

Estimation of Variability of Soil Properties and Its Application to Geotechnical Engineering Design (지반정수의 변동성 추정 및 결과의 활용)

  • Kim, Dong-Hee;Kim, Min-Tae;Lee, Chang-Ho;Lee, Woo-Jin
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.12
    • /
    • pp.71-79
    • /
    • 2010
  • The reliable evaluation of the coefficient of variation (COV) of soil properties is required for the determination of adequate design values and the application of a probabilistic method for the design of geotechnical structures. In this paper, the applicability of methods for estimating the standard deviation, such as the. Three-Sigma Rule and a statistical method, is evaluated by using site investigation data of the Songdo area. It is found that the Three-Sigma Rule provides similar results to those of a statistical method when using $N_{\sigma}$=6 for the property with small variability and $N_{\sigma}$=4.2~5.3 for the property with large variability. It is also observed that, for the undrained shear strength that has an increasing trend with depth, a $N_{\sigma}$ value of 4 is adequate for the evaluation of the variability by the Three-Sigma Rule. The COVs of soil properties determined in this paper could be used in the estimation of the confidence interval and characteristic values of soil properties.

Optimization of Single-stage Mixed Refrigerant LNG Process Considering Inherent Explosion Risks (잠재적 폭발 위험성을 고려한 단단 혼합냉매 LNG 공정의 설계 변수 최적화)

  • Kim, Ik Hyun;Dan, Seungkyu;Cho, Seonghyun;Lee, Gibaek;Yoon, En Sup
    • Korean Chemical Engineering Research
    • /
    • v.52 no.4
    • /
    • pp.467-474
    • /
    • 2014
  • Preliminary design in chemical process furnishes economic feasibility through calculation of both mass balance and energy balance and makes it possible to produce a desired product under the given conditions. Through this design stage, the process possesses unchangeable characteristics, since the materials, reactions, unit configuration, and operating conditions were determined. Unique characteristics could be very economic, but it also implies various potential risk factors as well. Therefore, it becomes extremely important to design process considering both economics and safety by integrating process simulation and quantitative risk analysis during preliminary design stage. The target of this study is LNG liquefaction process. By the simulation using Aspen HYSYS and quantitative risk analysis, the design variables of the process were determined in the way to minimize the inherent explosion risks and operating cost. Instead of the optimization tool of Aspen HYSYS, the optimization was performed by using stochastic optimization algorithm (Covariance Matrix Adaptation-Evolution Strategy, CMA-ES) which was implemented through automation between Aspen HYSYS and Matlab. The research obtained that the important variable to enhance inherent safety was the operation pressure of mixed refrigerant. The inherent risk was able to be reduced about 4~18% by increasing the operating cost about 0.5~10%. As the operating cost increases, the absolute value of risk was decreased as expected, but cost-effectiveness of risk reduction had decreased. Integration of process simulation and quantitative risk analysis made it possible to design inherently safe process, and it is expected to be useful in designing the less risky process since risk factors in the process can be numerically monitored during preliminary process design stage.

A Study on developing procedures of an archival contents for education (교육용 기록정보콘텐츠 개발 절차에 관한 연구)

  • Lee, Eun-Yeong
    • The Korean Journal of Archival Studies
    • /
    • no.29
    • /
    • pp.129-173
    • /
    • 2011
  • Standards-curriculum based archival contents for education is the best effective teaching and learning units for historical thinking abilities. This paper purposes a developing procedures of an archival contents for education that is theoretical instructions of developing an archival contents for education by the National Archives of Korea. This paper can be used of the theoretical bases for the National Archives of Korea by proposing the methodology of development of an archival contents for education. The developing procedures of an archival contents for education is the same with the procedures of developing an e-learning contents that has planning, analyzing, designing, developing and assessing steps but it is characterized by an archival contents for education that is curriculum standards analysis, collection analysis, and detailed design for structured formats in effective-accomplishments for teaching-learning objectives. I propose the procedures for determining teaching-learning subjects that enable the development of an archival contents for education by curriculum standards analysis. I also propose the procedures for deriving the key words from the teaching-learning subjects. Collection analysis methods analyze key records that correspond to the learning subjects according to the selection criteria of primary sources. In the steps of designing, titles of contents and contents structures have to be determined and storyboards based on flowchart of learning have to be made of according to the results of analyses. In the steps of developing contents, making a copy of primary sources like a original is the key points. And also in the steps of assessment, products of teaching-learning contents to effectively achieve the teaching-learning objectives have to be estimated by the appraisal board. Finally I propose that user's survey research after the services have to be reflected on contents updates and new developments of contents.

DYNAMIC MODEL DEVELOPMENT FOR INTERPLANETARY NAVIGATION (행성탐사 항행해 결정을 위한 동역학 모델 개발)

  • Park, Eun-Seo;Song, Young-Joo;Yoo, Sung-Moon;Park, Sang-Young;Choi, Kyu-Hong;Yoon, Jae-Cheol;Yim, Jo-Ryeong;Choi, Joon-Min;Kim, Byung-Kyo
    • Journal of Astronomy and Space Sciences
    • /
    • v.22 no.4
    • /
    • pp.463-472
    • /
    • 2005
  • In this paper, the dynamic model development for interplanetary navigation has been discussed. The Cowell method for special perturbation theories was employed to develop an interplanetary trajectory propagator including the perturbations due to geopotential, the Earth's dynamic polar motion, the gravity of the Sun, the Moon and the other planets in the solar system, the relativistic effect of the Sun, solar radiation pressure, and atmospheric drag. The equations of motion in dynamic model were numerically integrated using Adams-Cowell 11th order predictor-corrector method. To compare the influences of each perturbation, trajectory propagation was performed using initial transfer orbit elements of the Mars Express mission launched in 2003, because it can be the criterion to choose proper perturbation models for navigation upon required accuracy. To investigate the performance of dynamic model developed, it was tested whether the spacecraft can reach the Mars. The interplanetary navigation tool developed in this study demonstrated the spacecraft entering the Mars SOI(Sphere of Influence) and its velocity .elative to the Mars was less than the escape velocity of the Mars, hence, the spacecraft can arrive at the target planet. The obtained results were also verified by using the AGI Satellite Tool Kit. It is concluded that the developed program is suitable for supporting interplanetary spacecraft mission for a future Korean Mars mission.

Analysis of Foundation Procedure for Chosun Dynasty Based on Network (네트워크 기반 조선왕조 건국과정 분석)

  • Kim, Hak Yong
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.5
    • /
    • pp.582-591
    • /
    • 2015
  • Late-Koryeo people networks were constructed from four different history books that were written by various historic aspects in the period from king Kongmin to the final king of the Koryeo, Kongyang. All networks constructed in this study show scale free network properties as if most social networks do. Tajo-sillok preface is one of subjectively written history book that described personal history of the Lee Seong-gye and his ancestors. It is confirmed that the book is one of the most biased-written history books through network study. Jeong Do-jeon known as a Chosun dynasty projector is not greatly contributed for founding of a Chosun dynasty in network study and various historical documents as well. In this network study, we provide objective historical information in the historical situations of the late-Koryeo and during establishment procedure of Chosun dynasty. Hub nodes in network is denoted highly linked nodes, called degree. Stress centrality is a unit to measure positional importancy in the network. If we employ two factors, degree and stress centrality to determine hub node, it represents high connectivity and importancy as well. As comparing values of the degree and stress centrality, we elucidate more objective historical facts from late-Koryeo situations in this study. If we further develop and employ a new algorithm that is considered both degree and stress centrality, it is a very useful tool for determining hub node.

An analysis of excavation cycle time for Korean tunnels and the comparison with the Standard of Construction Estimate (국내터널 굴착 사이클타임에 대한 분석결과와 표준품셈과의 비교)

  • Kim, Yangkyun;Kim, Hyung-Mok;Lee, Sean S.
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.1
    • /
    • pp.137-153
    • /
    • 2019
  • Estimating tunnel construction time and costs are the most fundamental part of a tunnel project planning, which has been generally assessed on a deterministic basis until now. In this paper, excavation cycle time was investigated for two road tunnels and one subway tunnel, and the results were compared with the Standard of Construction Estimate (SE), which is made for the estimation of construction time and cost in a design stage. The results show that the difference in cycle time between SE and actual cycle time is 50%, 7% and 31% respectively for the three tunnels, which means that SE does not reflect practical operation time. The major reasons of the difference are skilled level of tunneling workers, the change of operation sequences for more effective operations, much more complicated working atmosphere in a tunnel than the assumption of SE etc. Finally, even though the results can not be generalized since investigated tunnels are only 3, but it is thought that SE needs to be upgraded into the model able to consider quite common situations through additional tunnel investigation and studies in the future.