• Title/Summary/Keyword: 건축물 정보모델

Search Result 135, Processing Time 0.033 seconds

A study on Integrating Strategy of Low-carbon Urban Planning System (탄소저감 도시계획 시스템의 통합화 방안 도출 연구)

  • Park, Chan Ho;Kim, Bum Seok
    • Spatial Information Research
    • /
    • v.21 no.2
    • /
    • pp.99-106
    • /
    • 2013
  • Through the rapid economic growth, modern society have achieved the industrialization but needed to respond to climate change and low-carbon green growth on a scale of urban area. Many studies about the low-carbon city and the green city are on going, but most of them are not integrated but go along in each area(construction, transportation, energy, etc) In this paper, we surveyed the current status of researches about information system to design low-carbon city or green city, and define the method to integrate the outcomes from the each area. As a result integrated model of 'Low-carbon Urban Planning integrated System' in the paper, Individual system is developed by way of C/S form because web system raised problems for data load in analysis. The integrated system was decided to develop by way of Web form, and integrated system was developed by can use the analysed DB in the individual system. We expect this study can help future researches to develop more economical and efficient integrated information system model to design the low-carbon city and the green city.

Analysis of BIM Impact on Preventing Rework in Construction Phase (시공단계 BIM 적용에 의한 재시공 방지 효과분석)

  • Lee, Myung-Do;Cha, Min-Su;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.169-176
    • /
    • 2018
  • The purpose of this study is to analyze the effects of applying BIM to the construction phase on preventing rework. Previous studies have presented the contribution of BIM in various ways, but a more practical and reliable analysis methodology are required. In this study, a BIM effect analysis methodology was proposed after collecting requirements on BIM effect analysis from field professionals. In the case study, the rework prevention effect was analyzed based on the proposed methodology. As a result, it was found that BIM application produced the rework prevention effect of approximately KRW 370,519,593. In addition, a consultation with field professionals on the suitability of the proposed methodology and effect analysis results were revealed that the results were sufficiently reliable. The results of this study can be used as efficient basic materials for research on BIM performance measurement in the future.

Extraction of Road Structure Elements for Developing IFC(Industry Foundation Classes) Model for Road (도로분야 IFC 확장을 위한 도로시설의 구성요소 도출)

  • Moon, Hyoun-Seok;Choi, Won-Sik;Kang, Leen-Seok;Nah, Hei-Sook
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.2
    • /
    • pp.1195-1203
    • /
    • 2014
  • Since IFC (Industry Foundation Classes) 4 is based on the representation of 3D elements for an architecture project, and does not define standardized shapes for civil projects such as roads, bridges, and tunnels etc, it has limitations in securing interoperability for exchanging a shape information model for the civil projects. Besides, since road facilities have a linear reference, which is modeled along the center alignment, it is difficult the designers to create a standardized 3D road model. The aim of this study is to configure structure elements and their attribute for a road in the perspective of 3D design for developing a shape information model for the road. To solve these issues, this study analyzes the design documents, which consist of a road design handbook, guide, specifications and standards, and then extract shape elements and their attributes of road structures. Such shape elements are defined as an entity item and we review a hierarchical structure of a road shape defined by a virtual road model. The detailed elements and their attributes can be utilized as a 3D shape information model for constructing BIM (Building Information Modeling) environment for Infrastructures. Besides, it is expected that the suggested items will be utilized as a base data for extending to IFC for a road subdividing the detailed shapes, types and attributes for road projects.

Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building (센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발)

  • Shin, Joong-Hwan;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.153-163
    • /
    • 2013
  • As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.

Improvement of Open BIM-based Building Permission Process Using EPI(Energy Performance Index) (에너지성능지표(EPI)를 대상으로 한 개방형BIM기반 건축인허가 개선방향 제시)

  • Kim, Inhan;Kim, Minchan;Choi, Jungsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.124-135
    • /
    • 2015
  • As many countries have been raising awareness of environmental issues, greater efforts for eco-friendly construction have been made in both governmental and private sectors. However, assessment circumstances for building energy performance and green building standard of legislation are still based on two dimension and handwork. This takes time, cost and labor, and makes assessment inaccurate and inefficient. Therefore, this study suggests methods to improve eco-friendly construction permission process and to automatize open BIM-based assessment of Energy Performance Index (EPI) among several eco-friendly construction certification standards. First, it analyzes the relations between assessment criteria and IFC data, and provides solutions to problems and limitations. Second, it applies the solutions to assessment program in order to automatize open BIM-based assessment for EPI. The eco-friendly construction permission process with these solutions applied will reduce time, cost, and labor by simplifying and automatizing the tasks. Also, the simplified process of design revision will improve not only productivity and efficiency but also accuracy and reliability.

3D Architecture Modeling and Quantity Estimation using SketchUp (스케치업을 활용한 3D 건축모델링 및 물량산출)

  • Kim, Min Gyu;Um, Dae Yong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.701-708
    • /
    • 2017
  • The construction cost is estimated based on the drawings at the design stage and constructor will find efficient construction methods for budgeting and budgeting appropriate to the budget. Accurate quantity estimation and budgeting are critical to determining whether the project is profitable or not. However, since this process is mostly performed depending on manpower or 2D drawings, errors are likely to occur and The BIM(Build Information Modeling) program, which can be automated, is very expensive and difficult to apply in the field. In this study, 3D architectural modeling was performed using SketchUp which is a 3D modeling software and suggest a methodology for Quantity Estimation. As a result, 3D modeling was performed effectively using 2D drawings of buildings. Based on the modeling results, it was possible to calculate the difference of the quantity estimation by 2D drawing and 3D modeling. The research suggests that the 3D modeling using the SketchUp and the calculation of the quantity can prevent the error of the conventional 2D calculation method. If the applicability of the research method is verified through continuous research, it will contribute to increase the efficiency of architectural modeling and quantity Estimation work.

A Linkage between IndoorGML and CityGML using External Reference (외부참조를 통한 IndoorGML과 CityGML의 결합)

  • Kim, Joon-Seok;Yoo, Sung-Jae;Li, Ki-Joune
    • Spatial Information Research
    • /
    • v.22 no.1
    • /
    • pp.65-73
    • /
    • 2014
  • Recently indoor navigation with indoor map such as Indoor Google Maps is served. For the services, constructing indoor data are required. CityGML and IFC are widely used as standards for representing indoor data. The data models contains spatial information for the indoor visualization and analysis, but indoor navigation requires semantic and topological information like graph as well as geometry. For this reason, IndoorGML, which is a GML3 application schema and data model for representation, storage and exchange of indoor geoinformation, is under standardization of OGC. IndoorGML can directly describe geometric property and refer elements in external documents. Because a lot of data in CityGML or IFC have been constructed, a huge amount of construction time and cost for IndoorGML data will be reduced if CityGML can help generate data in IndoorGML. Thus, this paper suggest practical use of CityGML including deriving from and link to CityGML. We analyze relationships between IndoorGML and CityGML. In this paper, issues and solutions for linkage of IndoorGML and CityGML are addressed.

Estimation of the Topographic Factor of Wind Speed Using GIS Information (GIS 정보를 이용한 풍속지형계수 산정)

  • Seong, Min-Ho;Choi, Se-Hyu
    • Spatial Information Research
    • /
    • v.19 no.5
    • /
    • pp.47-52
    • /
    • 2011
  • Recently damage scale by local winds and typhoon has dramatically increased. Korea has the terrain over 70% of the land and the planning of the wind load is necessary to estimate reflecting appropriately the change of the wind-speed according to the characteristic of the terrain and in the Korean Building Code(2009), this is stated and it reflects to the design process. However, in order to estimate the topographic factor of the wind speed considering the topographic characteristics in the structure design actually, it has many difficult points including the local topographic survey, etc. In this paper, the Digital Elevation Model(DEM) is created using TIN interpolation method in the form of the digital map and then the interface was designed and implemented which can automatically estimate the topographic factor of wind speed by using ESRI(R)ArcObjectTM and the Visual Basic programing language. By applying it to the terrain which positioned in the downtown area, the practicality of the topographic factor of wind speed estimation interface was checked.

A Study on Distance Estimation in Virtual Space According to Change of Resolution of Static and Dynamic Image (가상현실공간에서 정적 및 동적 이미지의 해상도 변화에 따른 거리추정에 관한 연구)

  • Ryu, Jae-Ho
    • Journal of the Korea Society of Computer and Information
    • /
    • v.16 no.3
    • /
    • pp.109-119
    • /
    • 2011
  • The virtual reality (VR) technology has been used as the application of architectural presentation or simulation tool in the field of industry. The high immersion and intuitive visual information are the great merits of design evaluation or environmental simulation when we are using the virtual environments. But the distortion of distance perception in VR is still a big problem when the accuracy of distance presentation is strictly required. For example, distance estimation is especially important when the virtual environments are applied to the presentational tool for evaluation the space design or planning in the field of architecture. If there are some perception error between the built space in real and represented space in virtual, the accurate design evaluation or modification of design is hard to be carried out during the design development stage. In this paper, we have carried out some experiments about distance estimation in the immersive virtual environments to verify the factors and their influence. We made a hypothesis that the lack of the information for the user in VR causes the different distance estimation from the real world because users are usually comfortable with moving fast and long distance in VR environments compared with moving slow and short distance in real space. So, we carried out basic experiment to prove our hypothesis that the lack of information makes subjects estimate the distance of walking in VR shorter compared with the same distance in real. Also, among the factors that probably affect the distance estimation in VR, we have verified the influence of the image resolution. The influence of resolution degradation of image on the distance estimation was verified with the condition of static and dynamic images. The results showed that the resolution has deep relation with the distance estimation. For example, the subject underestimated the distance at the lower resolution condition. We also found the methods of the making the lower resolution image could affect on the visual perception of subjects.

Risk Analysis using Construction Insurance Claim Payouts (건설공사보험 피해 보상금 지급액을 활용한 리스크 분석)

  • Yu, Yeong-Jin;Son, Kiyoung;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.349-357
    • /
    • 2016
  • Recently, the quantity of risk in construction project has been inflated due to the fact that current construction projects have been large and complicated. Therefore, a study on the risk management methods is necessary that can predict and respond to the need in complicated modern construction projects. In this study, the objective is to analyze the cause of accident in actual construction sites and develop a risk assessment model based on insurance claims records. To reach the goal of this study, first, the frequency and severity of accidents are analyzed the causes of accidents based on the classification; progress rate, season, and total construction costs. Second, a risk assessment model is developed by utilizing a multiple regression analysis. The dependent variable is loss ratio of material damage and three categories; natural hazards, geographic information, and construction method & ability, are used as the independent variables. The model's adjusted R-square is 0.455. The contributions of this study will be used as a material for a quantitative risk analysis model development and review of the construction risk factors for future study.