• Title/Summary/Keyword: 건축물 정보관리의 모델

Search Result 63, Processing Time 0.03 seconds

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

Development of Biotope area ratio Estimation Model using GIS (GIS를 활용한 생태면적률 산정 모델 개발)

  • Lee, Ji-Soo;Lee, Seung-Wook;Lee, Seung-Yeob;Hong, Won-Hwa
    • Spatial Information Research
    • /
    • v.19 no.2
    • /
    • pp.9-18
    • /
    • 2011
  • The purpose of this research is to evaluate an accurate biotope area ratio model with efficiency and convenience of database management through promoting sustainable development to provide people amenities in a new town. In particular, the biotope area ratio is used not only in the environment impact assessment but Green building certification criteria. But now there is no any index map of biotope. So it is very hard to implement with data for supplement results. In this research, we suggest the model of integrated attributable information. The evaluation of biotope area ratio is to include a basic land use planning map and a building coverage area which is a wall of greening surface and roof. In case of non building coverage area, the evaluation of biotope area ratio is to include water space, artificial ground, natural ground and pervious gap-pave. A weighted value on the spatial information is combined into the information. And then the merged one is given a land use planning information in a block. In the weighted value on the space type information, it is possible to in its circumstances. Therefore, it can be substituted a correspondence of numerical change for various values elastically in this model.

A Study of Development of Architectural Design Tool Using Immersive Virtual Reality Simulation (몰입형 VR(Virtual Reality)을 활용한 건축 설계 도구 개발에 관한 연구)

  • Goh, Il-Du;Kim, Jin-Wook;Lee, Seong-Ryeong
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.141-144
    • /
    • 2010
  • 건설공사 프로젝트는 기획, 설계, 시공, 운영 및 유지관리 등 각 단계의 다양한 참여 주제에 의해 프로젝트가 진행되고 각 분야 간 원활한 의사소통을 통한 협업으로 일을 진행해 나간다. 그러나 각 단계별 커뮤니케이션이 원활히 이뤄지기가 힘들며, 이러한 단계별 분절의 가장 큰 이유 중 하나가 실제적 결과물은 3차원 기반인 것에 비해, 그 과정이 2차원 CAD 시스템에 의존하는 결과와 과정의 격차 때문이다. 그로 인해 각 관련 분야에서 발생되는 정보의 불확실성, 부정확성, 표현의 애매모함 등으로 인해 재작업 및 불필요한 작업이 빈번히 발생하여 전체적인 공정의 지연 및 비용의 문제, 결과물의 품질에 대한 문제가 발생하고 있다. 또한 도면에서의 한계점인 거리감, 공간감 등 실제 사람이 느끼는 Scale감을 알 수 없어 공간에 대한 이해도가 떨어지는 한계점을 극복하지 못하고 있으며 1인칭 작업운영 방식으로 인하여 협업 설계과정에서 원활한 팀워크를 유도 할 수 없다. 따라서 본 연구에서는 협업설계 과정에서 기본설계 단계를 지원하는 설계 도구로서 건축모델의 단순 시각화에서 벗어나 가상공간에서 몰입형 VR 시뮬레이션을 구현하기 위하여 프로토타입 응용을 개발 하였고, 이것을 "Digital Studio"에 구현하여 즉각적인 공간 시뮬레이션을 통하여 실제 시공 전에 문제점들을 검토 및 보완하고 전체적으로는 생산성 향상과 설계 과정 중 오류를 최소화하기 위한 VR시뮬레이션 시스템의 제안 및 Viewer 모듈을 개발 하였다.

  • PDF

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

Method of Earthquake Acceleration Estimation for Predicting Damage to Arbitrary Location Structures based on Artificial Intelligence (임의 위치 구조물의 손상예측을 위한 인공지능 기반 지진가속도 추정방법 )

  • Kyeong-Seok Lee;Young-Deuk Seo;Eun-Rim Baek
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.3
    • /
    • pp.71-79
    • /
    • 2023
  • It is not efficient to install a maintenance system that measures seismic acceleration and displacement on all bridges and buildings to evaluate the safety of structures after an earthquake occurs. In order to maintain this, an on-site investigation is conducted. Therefore, it takes a lot of time when the scope of the investigation is wide. As a result, secondary damage may occur, so it is necessary to predict the safety of individual structures quickly. The method of estimating earthquake damage of a structure includes a finite element analysis method using approved seismic information and a structural analysis model. Therefore, it is necessary to predict the seismic information generated at arbitrary location in order to quickly determine structure damage. In this study, methods to predict the ground response spectrum and acceleration time history at arbitrary location using linear estimation methods, and artificial neural network learning methods based on seismic observation data were proposed and their applicability was evaluated. In the case of the linear estimation method, the error was small when the locations of nearby observatories were gathered, but the error increased significantly when it was spread. In the case of the artificial neural network learning method, it could be estimated with a lower level of error under the same conditions.

3D Track Models Generation and Applications Based on LiDAR Data for Railway Route Management (철도노선관리에서의 LIDAR 데이터 기반의 3차원 궤적 모델 생성 및 적용)

  • Yeon, Sang-Ho;Lee, Young-Dae
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1099-1104
    • /
    • 2007
  • The visual implementation of 3-dimensional national environment is focused by the requirement and importance in the fields such as, national development plan, telecommunication facility deployment plan, railway construction, construction engineering, spatial city development, safety and disaster prevention engineering. The currently used DEM system using contour lines, which embodies national geographic information based on the 2-D digital maps and facility information has limitation in implementation in reproducing the 3-D spatial city. Moreover, this method often neglects the altitude of the rail way infrastructure which has narrow width and long length. There it is needed to apply laser measurement technique in the spatial target object to obtain accuracy. Currently, the LiDAR data which combines the laser measurement skill and GPS has been introduced to obtain high resolution accuracy in the altitude measurement. In this paper, we first investigate the LiDAR based researches in advanced foreign countries, then we propose data a generation scheme and an algorithm for the optimal manage and synthesis of railway facility system in our 3-D spatial terrain information. For this object, LiDAR based height data transformed to DEM, and the realtime unification of the vector via digital image mapping and raster via exactness evaluation is transformed to make it possible to trace the model of generated 3-dimensional railway model with long distance for 3D tract model generation.

  • PDF

A Study on the Development of a BIM-based Spatial Planning Simulation System for Architectural Planning Stage Support (건축기획단계 지원을 위한 BIM 기반 공간계획 시뮬레이션 시스템 개발에 관한 연구)

  • Choi, Sun-Young;Choi, Ju-Won;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.1 no.2
    • /
    • pp.19-23
    • /
    • 2011
  • The planning stage of an architectural project has much more significant effects on the cost or outcome of the project than other stages of the project. In addition, the importance of architectural planning has been further increasing according to the recent trend of construction projects becoming larger in scale and more complex. In spite of this, the current situation is that the planning stage work is not being systematically managed. Accordingly, the purpose of this study was to develop a BIM-based simulation system for providing support during architectural planning stage such as spatial planning & review, cost review, project owner requirements management, etc. It is easy to review various alternatives using this system that allows not only the modeling of space object modeling but also the instantaneous review of spatial area & layout, cost, etc. based on object information. In addition, it can be used as a communication tool with the project owner as it provides the visualized information and quantitative data of the building model, and the information created through this system can be delivered to the following stage for usage. It is thought that using this system, the entire project work including the architectural planning stage can be supported and even contributing to the advancement of architectural process.

A Study on Landscape Management Techniques of Cultural Heritage Designated Area Using 3D Mapping Method (3D맵핑을 이용한 문화재 지정구역 경관관리기법 연구)

  • Kim, Jae-Ung;Lee, Won-Ho;Shin, Hyun-Sil
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.36 no.1
    • /
    • pp.97-108
    • /
    • 2018
  • The purpose of this study is to propose the construction of a visibility analysis model, which is the basis of the analysis for landscape management on the heritage sites such as historic villages and scenic sites. Results of the visibility analysis using DEM and the visibility analysis of DSM based on 3D mapping data are compared as follows: Precision level of the extracted data was confirmed to be less than 6.5cm, based on RTK survey results produced by constructing orthoimage data and DSM from the digital data of 2cm-class GSD(Ground Sample Distance) obtained by using a small UAV(Unmanned Aerial Vehicle). As a result of comparing the visibility analysis data of Digital Surface Model (DSM) using a small UAV with Digital Elevation Model(DEM) applying the height of the building to the Digital Topographic Map, it was confirmed that more realistic visibility analysis can be accomplished by applying DSM, as the structures such as fences, trees, and houses are reflected in the topographic data. The visibility analysis model using the 3D mapping technique can efficiently obtain the constantly changing topographic information when needed, by immediately constructing the data by utilizing a small UAV. It seems to be possible to propose a reasonable analysis result for preservation management such as landscape evaluation of cultural property.

IFC-based Data Structure Design for Web Visualization (IFC 기반 웹 가시화를 위한 데이터 구조 설계)

  • Lee, Daejin;Choi, Wonik
    • Journal of KIISE
    • /
    • v.44 no.3
    • /
    • pp.332-337
    • /
    • 2017
  • When using IFC data consisting of STEP schema based on the EXPRESS language, it is not easy for collaborating project stakeholders to share BIM modeling shape information. The IFC viewer application must be installed on the desktop PC to review the BIM modeling shape information defined within the IFC, because the IFC viewer application not only parse STEP structure information model but also process the 3D feature construction for a 3D visualization. Therefore, we propose a lightweight data structure design for web visualization by parsing IFC data and constructing 3D modeling data. Our experimental results show the weight reduction of IFC data is about 40% of original file size and the web visualization is able to see the same quality with all web browsers which support WebGL on PCs and smartphones. If applied research is conducted about the web visualization based on IFC data of the last construction phase, it could be utilized in various fields ranging from the facility maintenance to indoor location-based services.

Development of Optimum Construction Lift Operation System using Sensing Information for High-rise Building (센싱정보를 활용한 초고층 건설용 리프트 최적화 운행 시스템 개발)

  • Shin, Joong-Hwan;Kwon, Soon-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.5
    • /
    • pp.153-163
    • /
    • 2013
  • As recent buildings have been more higher and larger, construction vertical lifting planning and operation is a key factor for successful project in tall building. Although many studies have been trying to set up a construction lifting planning system at early stage, there's not existing a control real-time lift operation control system with respect to during construction stage. Therefore, In this study, we use the sensor device to collect the lift operating data for improvement of lift operation efficiency and develope optimum lift operating system which can perform real-time analysis. Finally, we verify the efficiency of proposed system through comparison between realtime operating data and simulated data using proposing system. In this paper, the proposed system show more efficient moving line compared with previous system. This can contribute to development of unmanned lift system.