• Title/Summary/Keyword: 건축공정

Search Result 444, Processing Time 0.026 seconds

Analysis of Construction Safety Management and Execution Tasks for Performance Improvement (건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구)

  • Kang, Sang-Hun;Kim, Dae Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

A Study on Modular System Efficiency using 5D BIM Tool (5D BIM Tool을 활용한 모듈러시스템의 효율성 연구)

  • Kim, Min-Woong;Hwang, In-Ho;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.208-209
    • /
    • 2013
  • Recently, there is a growing interest in BIM and modular method because of changing in users attitudes about quality of building and construction environment. however, In domestic, study on Modular method still have addressed primarily basic contents. This study check efficiency about this process through comparative analysis of Modular method and RC method used 5D BIM tool for real project and suggest a fitting schedule management method for modular method.

  • PDF

A Numerical Analysis of VOC Removal in Honeycomb Photocatalytic Reactor (벌집형 광촉매 반응기의 VOC 제거에 관한 수치해석적 연구)

  • 류무성;김창녕
    • Proceedings of the Korea Air Pollution Research Association Conference
    • /
    • 2003.05b
    • /
    • pp.385-386
    • /
    • 2003
  • 건축자재의 제작 및 도장공정, 합성수지 제조공정 등에서 많이 배출되는 휘발성 유기화합물(Volitile Organic Compounds, 이하 VOCs)은 이동성이 강하고 악취를 유발할 뿐만 아니라 마취성이 강하여 잠재적인 독성 및 발암성을 가진다. 이러한 VOCs의 제거방법 중 광촉매 제거법은 380 nm 이하의 자외선을 흡수하여 표면에서 생긴 전자와 정공으로 대부분의 유해물질을 제거하는 비교적 최근에 개발된 방법이다. 광촉매는 한번의 설치로 반영구적으로 사용할 수 있고 인체에 무해하며 유지비용이 적게 든다는 장점으로 인해 크게 부각되고 있다. (중략)

  • PDF

The case study of substitution construction body for grounding conductor at substation and power station (발변전소 건축구조체를 이용한 대용접지공법 적용사례 연구)

  • Choi, Hyeong-Cheol;Lee, Nam-Hyeong;Chang, Jung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.2180_2181
    • /
    • 2009
  • 발변전소 및 건축물의 접지설계 절차는 개발예정지에 대해 우선적으로 대지비저항을 측정하고, 측정자료를 기초로 하여 전용 해석프로그램의 모의과정을 거쳐 접지물량 및 지락전류 등을 산출하고 있다. 그러나 접지설계 및 시공에 있어서 건축구조물 건립공정 기초 단계인 토공사시 현장 여견의 변화로 설계조건을 만족하지 못하는 경우가 종종 발생되고 있다. 본 논문은 현장여견에 따라 건축구조체 등의 자연구성부재를 이용하여 일반적인 접지방식을 대용하는 공법에 대해 실증사례를 소개하고자 한다.

  • PDF

A study on the possibility of reconfigurations of architectural cultural assets spatial Information by BIM -The case of spatial configurations of Sungnyemun recovery process- (BIM기반 건축문화재 공간정보 구성방식의 보완 가능성 -숭례문 복구공정 3차원 정보구축 사례를 중심으로-)

  • Choi, Hyun-Sang
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.294-295
    • /
    • 2014
  • Recently, it is becoming necessary for architectural heritage to make spatial information structure by using BIM(Building Information Modeling). However, current BIM system can not be used because its information classification and structure is not suitable for architectural heritage. This is a basic study which focuses on upgrading spatial information structure of BIM so that it would be possible to use BIM in management of preservation of architectural heritage, too. This study analyzes Sungnyemun case and its spatial information structure.

  • PDF

Synthesis and Characteristics of Different Ratio of Stearic Acid with SiO2 Shell Through Sol-Gel Process (Sol-gel 공정을 통한 SiO2 쉘과의 상이한 스테아산 비율의 합성 및 특성)

  • Ishak, Shafiq;Lee, Han-Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.66-67
    • /
    • 2020
  • The synthesis of stearic acid composite phase change material (PCM) was investigated and the samples produced were characterized for use in latent heat storage, using a simple chemical sol-gel process. The PCM was encapsulated to tetraethyl orthosilicate by various preparation ratios of stearic acid (5, 10, 15, 20, 30 and 50%). Fourier transformation infrared spectroscope (FT-IR) and X-Ray diffraction (XRD) were performed to determine the chemical structure and crystalloid phase of the microencapsulated PCM. SATEOS1 (5%) shows the best proportion for the PCM. With the presence of stearic acid as core materials and SiO2 as the supporting materials, it does not show any chemical reaction between both of them. SATEOS1 shows promising potential for thermal energy storage as it shows a better encapsulation efficiency and good thermal stability.

  • PDF

Expansion of Water Reuse Facility for Building Unit to Solve Water Shortage Problem (물 부족 문제의 해결을 위한 건축물 단위의 물재이용 시설 확대 방안)

  • Park, Yong-hwa;Shim, In-tae;Kim, Hyun-jin;Jang, Am
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.7
    • /
    • pp.377-384
    • /
    • 2017
  • This study examined the possibility of solving the water shortage problem through the water reuse of buildings through the Suwon water reuse (greywater) facility installation project conducted as a pilot project of Ministry of Environment. Water reuse of individual building units can reduce city water demand by up to 25%. This is a level that can solve the water shortage problem in Korea. However, in order to revitalize the water reuse facilities of individual buildings, it is necessary to solve the problem of the user's rejection of the greywater and the economical problems. The resolution of the user's rejection can be solved by linking the MBR process with the AOP process. When the MBR process and the AOP process are operated in conjunction with each other, it is found that the users do not feel the water quality difference with the tap water. Economical problems can be solved at the water rate levels when the facility capacity is over 100 ton/day considering the construction cost and the operation cost, and when the operation cost alone is over 15 ton/day. Furthermore, when considering the social benefit cost, it is found that profit is generated from 150 ton/day.

Alternative Evaluation Model for Tower Crane Operation Plan in Modular Construction - Focusing on Modular Unit Installation and Finishing works - (모듈러 건축 타워크레인 운용 계획의 대안 평가 모델 - 유닛 설치 및 마감공사를 중심으로 -)

  • Kim, Joo Ho;Park, Moonseo;Lee, Hyun-Soo;Hyun, Hosang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.2
    • /
    • pp.50-60
    • /
    • 2018
  • Recently, modular construction method has been widely applied to projects with repetitive processes including dormitory, the residential facility, and the hotel construction due to reduced labor input and shortened construction schedule. Generally, about 40% of total on-site construction cost excluding unit installation cost, is put on exterior finishing work, and thus management of finishing work is deemed important in maintaining the targeted schedule and cost. Since limited equipment is shared so that subsequent activities are not affected while carrying out on-site installation and finishing work, lifting plan becomes more important for modular projects with greater portion of finishing work load. In this regard, tower crane operation plan may take the form of a single cycle or multiple cycles in which equipment efficiency can be affected. However, difficulties exist in evaluating alternatives to tower crane operation plans supporting unit installation and finishing work. Therefore, this study aims to evaluate the alternative of tower crane operation method according to the cyclic period setting in modular building site to determine the effect on T/C uptime and process by parameterizing lifting time for unit and exterior finishing material, lift cycle for unit and exterior finishing material and time required for finishing work. Accordingly, this study develops a simulation model that can increase the tower crane efficiency by controlling the work speed. An academic contribution of this study is to suggest a resource leveling method applying the concept of lifting cycle, and further is expected to be managerially used as a basis for an alternative evaluation of equipment plan.

Knowledge Acquisition and Application for Scheduling Expert System of Highrise Buildings (HRB Expert 구축을 위한 지식의 획득과 활용)

  • Hong Young-Tak;Yu Jung-Ho;Lim Gyeong-Ho;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.92-101
    • /
    • 2005
  • The duration of highrise building projects is more shorter than its increasing of the numbers of floors. The project is liable to overrun of the time in which the project must be complete. AS highrise buildings are increased, time management has been reorganized as critical success factor. To improve time management, time management softwares are introduced and the software's education is made lively in construction company. However a large amount of time management works still have been based on not the software but scheduler's experience. We often can find the time overrun risk of highrise building because of the shortage of scheduler's experience. To diminish the mistake of the scheduler who does not have much experience, we suggested HRB Expert which uses expert's knowledge to make the time plan of highrise building. We made an example of knowledge acquiring and knowledge usage which cased on reinforced concrete work of highrise building by literature review and interview with scheduling expert. The precision of time plan will be enhanced and time overrun will be prevented on condition that HRB Expert is constructed and used

Introduction of BIM Quality Standard for Quantity Take-off (건축 물량산출 활용을 위한 BIM품질기준 도입 방안)

  • Kwon, O-Cheol;Jo, Chan-Won;Cho, Joo-Won
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.171-180
    • /
    • 2011
  • As high-rise and irregularly shaped building structures have become a trend at home and abroad, BIM technology is now being developed and accepted widely. However, the BIM data and information generated in the design phase cannot be actively reutilized in the construction stage. This is because the major interests of construction companies include working process and cost estimation, while there is not usually enough BIM data created to support these activities. In order to resolve this issue, we need to set up BIM modeling guides that make it possible to extract correct quantity take-off from BIM data. Quality checks are also necessary to ensure that the resulting BIM data is correct. This study suggests ways of securing BIM quality for correct quantity take-off, which is critical for BIM technology applied to the building construction process and its cost estimation.