• Title/Summary/Keyword: 건설 정보 모델링

Search Result 232, Processing Time 0.023 seconds

A Basic Model of the Procurement Planning of Resources by Activity in Construction Projects (건축공사 액티비티별 소요자원 조달계획의 기초모델링)

  • Kim, Ji-Hyun;Nam, Gi-Yung;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.340-346
    • /
    • 2012
  • Recently, the construction industry has been pursuing the rationalization of its various systems through informatization. Procurement is a highly important element of the construction process, as it is directly related to the cost and quality of a construction project. In addition, procurement management of resources is in an indivisible relation, so that it is significant to link each other effectively. This study proposed construction activity and basic data connected to cost summary work for the categorization and utilization of resources. This study connected that activity to detailed items of material and labor cost, and proposed a procurement planning model of resources by activity that can utilize all resources and information. In addition, this model can classify resources and information by various forms. We found that the utilization of this procurement planning model will be higher because it can grasp various problems that occur in the passive procurement and provide additional functions that can be modified.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

Orthophoto Application for Geo-spatial Information Acquisiton of Construction Area(DAM) (공사지역(댐)의 지형정보구축을 위한 정사영상의 활용)

  • 한승희;이형석;이성순
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.18 no.4
    • /
    • pp.395-403
    • /
    • 2000
  • It is so sensitive that the matter of compensation for private possessions caused in the course of public construction planning is very important. Especially, more logical planning is necessary when the dam be constructed, because it is mainly controlled by the surface of water, and if that planning is made public, artificial change is occurred in land use in that area for the purpose of rising the compensation. In this study, the plan for the application of aerial photo based ortho image was drew up for solving these problems and for the rational, rapid compensation. Ortho image was made by aerial photo, used as reading material for the change in land use. The modeling of drainage basin, came under the planning surface of water, and the 3D simulation were performed for the scene analysis, the change understanding in land use for a lot number in a certain period by overlapping the digital image, the digital land registration map, and the digital topography map as well as the analysis of the admitted land followed by the height of reservoir water.

  • PDF

Effectiveness of BIM-based Human Behavior Simulation on Architectural Design Education -Focused on Exploration and Evaluation of Barrier-Free and Fire Evacuation Performances- (BIM 기반의 인간행동 시뮬레이션이 건축설계교육에 미치는 효과에 관한 연구 -무장애와 안전 및 피난설계의 성능탐구와 평가를 중심으로-)

  • Hong, Seung-Wan;Park, Ji-Young
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.1-10
    • /
    • 2020
  • While the importance of barrier-free and fire evacuation design is highlighted in architectural design education, systemic analysis, and examination on such performances are still challenging due to methodological lacks. The present study investigates the effectiveness of BIM-based human behavior simulation for architecture major students' analytical examinations to promote barrier-free and fire evacuation performances. To achieve such an aim, quasi-experiments were conducted, which compare 50 students' analysis and examination scores according to the use and non-use of the simulation, and the data were collected via participants' survey and interview. As a result, T-Test and MANOVA analyses indicate that, compared with its non-use counterpart, the use of human behavior simulation better facilitates the students' (1) examination of the physical properties and dimensions for the disabled's accessibility and evacuation, (2) understanding of the bodily capacity and handicap of the disabled, (3) examination on the spatial layouts and locations of exits, (4) understanding on evacuees' urgent behaviors, and (5) responsibility as an architect. Based on previous studies, the reasons of statistical results are interpreted as the explicit observation and analytical measures of multiple numbers of virtual-evacuees and direct-experience from body range of the disabled responding to the populated occupants as what they face in authentic reality.

BIM-based Efficiency Review of Barrier Free Certification Items (장애물 없는 생활환경(BF)인증 항목의 BIM기반 효율성 검토)

  • Kang, Kyung-Ha;Son, Byeung-Hun;So, Seung-Young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.2
    • /
    • pp.183-194
    • /
    • 2022
  • This study conducted a survey for BIM experts as a basic study to improve the efficiency of a BIM-based review of the BF certification evaluation method. By limiting the buildings to elementary schools, the first survey was conducted to extract the mandatory facilities from the BF certification evaluation items according to the evaluation criteria, and 63 out of a total of 94 evaluation items were extracted. The extracted facilities were intermediary facilities, internal facilities, and sanitary facilities. The second survey provided detailed calculation criteria for BF certification evaluation items, and through investigating the possibility of BIM-based review, 31 items were derived. In the 3rd and final survey, when asked about the effectiveness of the current CAD-based and BIM-based evaluation methods, the BIM-based evaluation method showed 96.8% effectiveness and the CAD-based evaluation method showed 3.2% effectiveness.

Earthquake Response Analysis of a RC Bridge Including the Effect of Repair/retrofitting (보수/보강 효과를 고려한 철근콘크리트교량의 내진응답해석)

  • Lee, Do Hyung;Cho, Kyu Sang;Jeon, Jeong Moon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.611-622
    • /
    • 2008
  • Nonlinear analyses have been carried out for both bridge piers and a bridge structure being repaired using a repair element in order to assess the post-repair seismic response of such structures. For this purpose, a simplified CFRP stress-strain model has been proposed. The analytical predictions incorporating the current developments correlate reasonably well with experimental results in terms of strength and stiffness. In addition, nonlinear dynamaic analyses have also been conducted for a bridge structure in terms of the created multiple earthquake sets to evaluate the effect of pier repair on the response of a whole bridge structure. In these analyses, potential plastic hinge zones of piers are virtually repaired by CFRP and steel jacketing. Comparative results prove the virtual necessity of performing nonlinear post-repair analyses under multiple earthquakes, particularly when the post-repair response features are required. In all, the present approaches are expected to provide salient information regarding a healthy seismic repair intervention of a damaged strcuture.

Development of Simulation Technology Based on 3D Indoor Map for Analyzing Pedestrian Convenience (보행 편의성 분석을 위한 3차원 실내지도 기반의 시뮬레이션 기술 개발)

  • KIM, Byung-Ju;KANG, Byoung-Ju;YOU, So-Young;KWON, Jay-Hyoun
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.20 no.3
    • /
    • pp.67-79
    • /
    • 2017
  • Increasing transportation dependence on the metro system has lead to the convenience of passengers becoming as important as the transportation capacity. In this study, a pedestrian simulator has been developed that can quantitatively assess the pedestrian environment in terms of attributes such as speed and distance. The simulator consists of modules designed for 3D indoor map authoring and algorithmic pedestrian modeling. Module functions for 3D indoor map authoring include 3D spatial modeling, network generation, and evaluation of obtained results. The pedestrian modeling algorithm executes functions such as conducting a path search, allocation of users, and evaluation of level of service (LOS). The primary objective behind developing the said functions is to apply and analyze various scenarios repeatedly, such as before and after the improvement of the pedestrian environment, and to integrate the spatial information database with the dynamic information database. Furthermore, to demonstrate the practical applicability of the proposed simulator in the future, a test-bed was constructed for a currently operational metro station and the quantitative index of the proposed improvement effect was calculated by analyzing the walking speed of pedestrians before and after the improvement of the passage. The possibility of database extension for further analysis has also been discussed in this study.

Automatic Registration of Point Cloud Data between MMS and UAV using ICP Method (ICP 기법을 이용한 MSS 및 UAV 간 점군 데이터 자동정합)

  • KIM, Jae-Hak;LEE, Chang-Min;KIM, Hyeong-Joon;LEE, Dong-Ha
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.4
    • /
    • pp.229-240
    • /
    • 2019
  • 3D geo-spatial model have been widely used in the field of Civil Engineering, Medical, Computer Graphics, Urban Management and many other. Especially, the demand for high quality 3D spatial information such as precise road map construction has explosively increased, MMS and UAV techniques have been actively used to acquire them more easily and conveniently in surveying and geo-spatial field. However, in order to perform 3D modeling by integrating the two data set from MMS and UAV, its so needed an proper registration method is required to efficiently correct the difference between the raw data acquisition sensor, the point cloud data generation method, and the observation accuracy occurred when the two techniques are applied. In this study, we obtained UAV point colud data in Yeouido area as the study area in order to determine the automatic registration performance between MMS and UAV point cloud data using ICP(Iterative Closet Point) method. MMS observations was then performed in the study area by dividing 4 zones according to the level of overlap ratio and observation noise with based on UAV data. After we manually registered the MMS data to the UAV data, then compared the results which automatic registered using ICP method. In conclusion, the higher the overlap ratio and the lower the noise level, can bring the more accurate results in the automatic registration using ICP method.

A Development of lidar data Filtering for Contour Generation (등고선 제작을 위한 라이다 데이터의 필터링 알고리즘 개발 및 적용)

  • Wie, Gwang-Jae;Kim, Eun-Young;Kang, In-Gu;Kim, Chang-Woo
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.27 no.4
    • /
    • pp.469-476
    • /
    • 2009
  • The new laser scanning technology allows to attain 3D information faster with higher accuracy on surface ground, vegetation and buildings of the earth surface. This acquired information can be used in many areas after modifying them appropriately by users. The contour production for accurate landform is an advanced technology that can reveal the mountain area landscapes hidden by the trees in detail. However, if extremely precise LiDAR data is used in constructing the contour, massive-sized data intricates the contour diagram and could amplify the data size inefficiently. This study illustrates the algorithm producing contour that is filtered in stages for more efficient utilization using the LiDAR contour produced by the detailed landscape data. This filtering stages allow to preserve the original landscape shape and to keep the data size small. Point Filtering determines the produced contour diagram shape and could minimize data size. Thus, in this study we compared experimentally filtered contour with the current digital map(1:5,000).

An analysis of effects of seasonal weather forecasting on dam reservoir inflow prediction (장기 기상전망이 댐 저수지 유입량 전망에 미치는 영향 분석)

  • Kim, Seon-Ho;Nam, Woo-Sung;Bae, Deg-Hyo
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.7
    • /
    • pp.451-461
    • /
    • 2019
  • The dam reservoir inflow prediction is utilized to ensure for water supply and prevent future droughts. In this study, we predicted the dam reservoir inflow and analyzed how seasonal weather forecasting affected the accuracy of the inflow for even multi-purpose dams. The hindcast and forecast of GloSea5 from KMA were used as input for rainfall-runoff models. TANK, ABCD, K-DRUM and PRMS models which have individual characteristics were applied to simulate inflow prediction. The dam reservoir inflow prediction was assessed for the periods of 1996~2009 and 2015~2016 for the hindcast and forecast respectively. The results of assessment showed that the inflow prediction was underestimated by comparing with the observed inflow. If rainfall-runoff models were calibrated appropriately, the characteristics of the models were not vital for accuracy of the inflow prediction. However the accuracy of seasonal weather forecasting, especially precipitation data is highly connected to the accuracy of the dam inflow prediction. It is recommended to consider underestimation of the inflow prediction when it is used for operations. Futhermore, for accuracy enhancement of the predicted dam inflow, it is more effective to focus on improving a seasonal weather forecasting rather than a rainfall-runoff model.