• Title/Summary/Keyword: 건설정보구조

Search Result 506, Processing Time 0.035 seconds

Automatic Building Extraction Using SpaceNet Building Dataset and Context-based ResU-Net (SpaceNet 건물 데이터셋과 Context-based ResU-Net을 이용한 건물 자동 추출)

  • Yoo, Suhong;Kim, Cheol Hwan;Kwon, Youngmok;Choi, Wonjun;Sohn, Hong-Gyoo
    • Korean Journal of Remote Sensing
    • /
    • v.38 no.5_2
    • /
    • pp.685-694
    • /
    • 2022
  • Building information is essential for various urban spatial analyses. For this reason, continuous building monitoring is required, but it is a subject with many practical difficulties. To this end, research is being conducted to extract buildings from satellite images that can be continuously observed over a wide area. Recently, deep learning-based semantic segmentation techniques have been used. In this study, a part of the structure of the context-based ResU-Net was modified, and training was conducted to automatically extract a building from a 30 cm Worldview-3 RGB image using SpaceNet's building v2 free open data. As a result of the classification accuracy evaluation, the f1-score, which was higher than the classification accuracy of the 2nd SpaceNet competition winners. Therefore, if Worldview-3 satellite imagery can be continuously provided, it will be possible to use the building extraction results of this study to generate an automatic model of building around the world.

BIM based Integration Method of Cost and Schedule Information (BIM기반 비용.일정 통합관리 방안에 관한 연구)

  • Jung, Do-Young;Baek, Yuong-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.321-325
    • /
    • 2008
  • 3D and BIM technology are presumed to be used more and more in the construction industry. The scope of this paper arose from a general wondering of how the constructor in general can benefit from the use of 3D models. Presented herewith is the first application of BIM in Korea to a actual bridge construction site located in Cheongpoong in Chooncheongbook-Do. This paper tries to integrate design, cost and schedule under location-based conditions with industry-specific solution for 3D modeling. 292 activities constitute the cable-stayed bridge of 442m long with a main span of 327m long. Integration of 3D model, cost and schedule is shown by comparing the measurements of works at a specific time by use of 2 different construction sequencing scenarios and cost breakdown structures.

  • PDF

A study of relevant model of information management system based on business process for embodying BPM on construction company (건설기업 BPM 구현을 위한 업무 프로세스 기반의 업무지원 시스템 연계모델에 관한 연구 -공정관리 업무 프로세스를 중심으로-)

  • Lee, Jung-Woo;Song, Young-Woong;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.13-27
    • /
    • 2009
  • Construction companies are trying to apply process management to their business to improve efficiency in business circumstance of high competition and globalization. Since 1990s, construction firms adopted process management to improve internal and external business structure based on process. It however has a few improvement functions. In addition, business support systems for business process efficiency improvement were developed, but separation between business process and IT system occurred because it focused on function-based individual construction and data input/output. To solve this problem, this study proposed business process and IT integration model for supporting user to use business information and system based on visualized business process and improving use of previous business support system. Business efficiency is expected to be improved with this model which based on integration required business condition(stakeholder, business data, functions of business supporting system). This study developved process model, architecture, and BPA of whole construction management business. According to BPA, it analyzed business process stakeholder, detail activities, and input-output data. And also it examined 12 main business supporting system of Korean construction firms. Based on analyzed data, this study developed business process supporting integration model based on business process through PDCA and CRUD analysis.

Flood forecasting and warning technology development for The Construction site - Korea Gas Corporation Tongyeong Headquarters field demonstration (건설 현장 침수 예경보 기술 개발 - 가스공사 통영 기지본부 현장 실증 중심 )

  • Taekmun Jeong;Yeoeun Lee;Dongyeop Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.255-255
    • /
    • 2023
  • 우리나라의 경우 집중호우와 돌발홍수로 인한 침수 발생에 대응하기 위해 유역 및 하천관리 사업, 각종 풍수해 예방사업 등을 추진하고 있으며, 관련 분야의 스마트기술 도입을 적극 추진하고 있다. 그러나, 2013년 노량진 상수도관 공사 현장 사고, 2019년 신월 빗물저류 배수시설 현장 사고 등과 같은 건설현장 침수 피해 사고가 지속적으로 발생하고 있다. 또한, 건설현장의 다양한 조건 및 시시각각 변화하는 상황에 따라 구조적 대책 및 대응방안을 수립하는 데 한계가 있으며 지금까지는 법, 제도에 기초한 대응 매뉴얼을 제작·배포하여 현장 근로자 교육을 실시하는 수준에서 진행되어 왔다. 본 연구에서는 건설현장의 자연재해, 특히 수재해에 대응하기 위해 보다 과학적인 방법을 통한 현장 침수 예경보 체계를 수립하였으며, 강우예측-침수예측-침수예경보 생산-현장 상황전파에 이르는 일련의 시스템을 개발하여 공사별, 규모별, 공정별 침수 대응 솔루션을 제공하고자 한다. 건설현장 침수예경보 시스템 개발의 주요 내용은 요소기술 개발이며, 간략하게 정리하면 다음과 같다. ① 강우 예측정보 생산: 현장에서 발생하는 집중호우를 고려하는 실시간 강우측정 자료와 연계한 초단기 강우예측 기술 개발, ② 침수 예측모델 개발: 현장의 시공간적 특성, 수재해 피해의 유형 등을 반영할 수 있는 침수피해 예측 모델 개발, ③ 침수예경보 의사결정 방법론 개발: 침수 피해 예경보를 위한 침수 위험단계 세분화 및 노모그래프 개발과 모델 적용(예측정확도 85% 이상), 이를 통합하여 건설현장 침수예경보 시스템 개발을 수행하게 된다. 연구에서 개발된 침수 예경보 통합 시스템은 향후 수재해로 인한 건설현장의 인명, 재산 피해 최소화에 기여할 것으로 기대된다.

  • PDF

Implementation of Property Input Automation Program for Building Information Modeling (BIM) Property Set (BIM 속성분류체계 구축을 위한 속성입력 자동화 프로그램 구현)

  • Nam, Jeong-Yong;Joo, Jae-Ha;Kim, Tae-Hyung
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.2
    • /
    • pp.73-79
    • /
    • 2020
  • Building Information Modeling (BIM) tools have not only increased the use of technology in the design process, but also increased the need for more information standard systems. The object classification system consists of 327 types of construction results obtained from 25 kinds of facilities, 174 types of parts, and 207 types of construction parts. In the previous study, the property classification system was developed into 4 major classifications, 13 middle classifications, 58 small classifications (category), and 333 attribution information of roads and rivers. It is extremely difficult to input the property information according to such extensive object classification. In addition, the development of external applications such as Revit plug-ins has created a need to automate specific and repetitive tasks. Therefore, following the BIM property classification system, an attribute input program was implemented for the system to enhance the productivity and convenience of the BIM users.

Design Information Management System Core Development Using Industry Foundation Classes (IFC를 이용한 설계정보관리시스템 핵심부 구축)

  • Lee Keun-hyung;Chin Sang-yoon;Kim Jae-jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.98-107
    • /
    • 2000
  • Increased use of computers in AEC (Architecture, Engineering and Construction) has expanded the amount of information gained from CAD (Computer Aided Design), PMIS (Project Management Information System), Structural Analysis Program, and Scheduling Program as well as making it more complex. And the productivity of AEC industry is largely dependent on well management and efficient reuse of this information. Accordingly, such trend incited much research and development on ITC (Information Technology in Construction) and CIC (Computer Integrated Construction) to be conducted. In exemplifying such effort, many researchers studied and researched on IFC (Industry Foundation Classes) since its development by IAI (International Alliance for Interoperability) for the product based information sharing. However, in spite of some valuable outputs, these researches are yet in the preliminary stage and deal mainly with conceptual ideas and trial implementations. Research on unveiling the process of the IFC application development, the core of the Design Information management system, and its applicable plan still need be done. Thus, the purpose of this paper is to determine the technologies needed for Design Information management system using IFC, and to present the key roles and the process of the IFC application development and its applicable plan. This system play a role to integrate the architectural information and the structural information into the product model and to group many each product items with various levels and aspects. To make the process model, we defined two activities, 'Product Modeling', 'Application Development', at the initial level. Then we decomposed the Application Development activity into five activities, 'IFC Schema Compile', 'Class Compile', 'Make Project Database Schema', 'Development of Product Frameworker', 'Make Project Database'. These activities are carried out by C++ Compiler, CAD, ObjectStore, ST-Developer, and ST-ObjectStore. Finally, we proposed the applicable process with six stages, '3D Modeling', 'Creation of Product Information', 'Creation and Update of Database', 'Reformation of Model's Structure with Multiple Hierarchies', 'Integration of Drawings and Specifications', and 'Creation of Quantity Information'. The IFCs, including the other classes which are going to be updated and developed newly on the construction, civil/structure, and facility management, will be used by the experts through the internet distribution technologies including CORBA and DCOM.

  • PDF

Development of Rainfall Ensemble Prediction Model based on Radar Rainfall (레이더 강우량 기반 강우앙상블 예측모형 개발)

  • Kim, Ho-Jun;Uranchimeg, Sumiya;Ryou, Minsuk;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.276-276
    • /
    • 2021
  • 최근 댐과 같은 수공구조물의 건설로 대규모 홍수피해는 급격히 줄어들었지만, 돌발홍수(flash flood)로 인한 저지대 침수 등의 도시홍수 발생빈도가 급증하고 있다. 2020년에는 최장의 장마가 관측되었으며, 전국적으로 홍수로 인한 침수피해가 발생하였다. 홍수에 선제적으로 대응하기 위해서 신뢰성 있는 홍수예·경보가 필요하며, 이를 위해서는 신속하고 정확성있는 강우예측이 선행되어야 한다. 이에 본 연구에서는 초단기 강우예측을 목적으로 둔 레이더 기반의 강우앙상블 예측모형을 개발하였다. 라그랑지안 지속성(Lagrangian persistence)을 기반으로 개발하였으며, 강우장의 이동 패턴은 이류특성을 활용해 추정하였다. 즉, 강우장의 예측정확도를 향상시키기 위해 공간적 규모별 캐스캐이드(cascade) 방법으로 분리해 이동 경로를 추정하였다. 예측시간에 따른 강우량은 각 캐스캐이드에 자기회귀모형을 적용하였다. 레이더 강우량은 2016-2020년 사이에 발생한 강우사상에 대한 환경부 홍수통제소에서 제공한 레이더 합성장을 이용하였다. 예측강우량에 대한 평가는 RMSE, Pearson's Correlation, FSS 등 통계치를 통해 수행하였다. 본 연구에서 소개된 강우예측 모형은 초단기 홍수예측에 정확도 높은 강우 정보를 제공할 수 있으며, 이에 따라 홍수피해를 저감하는데 도움이 될 것으로 판단된다.

  • PDF

A Study on Radar Rainfall Prediction Method based on Deep Learning (딥러닝 기반의 레이더 강우예측 기법에 관한 연구)

  • Heo, Jae-Yeong;Yoon, Seong Sim;Lim, Ye Jin;Bae, Deg-Hyo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.128-128
    • /
    • 2022
  • 최근 호우의 빈도와 규모는 증가하는 추세이며 이에 따른 홍수 피해는 많은 피해를 야기하고 있다. 이러한 관점에서 홍수 피해에 대한 선제적 대응을 위한 요소로써 초단시간 강우예측 정보의 중요성은 매우 높다. 특히, 레이더 자료 기반의 강우예측은 수치예보모델과 비교하여 3시간 이내의 짧은 선행시간 이내의 높은 정확도를 갖고 있어 홍수예보에 다수 활용되고 있다. 최근에는 강우자료의 복잡한 관계와 특징을 고려하기 위해 딥러닝 기반의 강우예측 활용 사례가 증가하고 있으나 국내 적용 사례는 적어 관련 연구가 요구되는 실정이다. 본 연구에서는 레이더 강우를 활용한 딥러닝 기반의 강우예측 기법을 제안하고 이에 대한 적용성을 평가하고자 한다. 2차원 레이더 강우자료의 특징과 시계열 특성을 고려하기 위한 심층신경망 구조를 제안하였으며 기존 딥러닝 모형과의 비교를 통해 활용 가능성을 제시하고자 하였다. 적용 대상지역은 한강 유역으로 선정하였다. 정성적 평가를 위해 임계성공지수(CSI)를 활용하여 예측 강우에 대한 정확도를 평가하였으며 정량적 평가를 위해 예측 강우와 관측 강우의 상관관계를 분석하였다. 평가 결과, 제안하는 방법이 기존 모형과 비교하여 예측오차의 범위가 적고 강우의 위치 변화를 잘 반영하는 것으로 나타났다. 본 연구결과는 초단기간 강우예측 자료를 활용하는 홍수예보의 정확도 향상에 기여할 것으로 기대된다.

  • PDF

A Study on the Modeling of Three-Dimensional Work Structure Using Web 3D in Cyberspace (Cyberspace에서 Web 3D를 이용한 3차원 공사 구조물 모델링의 활용성 제언)

  • Lee Hui-Chul;Lee Tai-Sik;Kim Young-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.531-534
    • /
    • 2002
  • Complexity in construction projects has increased over the years, which has led to an increase in the number of organizations involved in those projects. In today's environment, these organizations operate in different parts of the world requiring their personnel to be geographically distributed. So, these organizations construct and utilize the information systems. However, looking into this systems' content, those use two-dimensional planes such as pictures and drawings to check the scheduling etc., which cause the defect of communication and problems such as change order. Accordingly, this study introduces the Web 3Ds and 3D Libraries, intends to present the effect on modeling of three-dimensional work structure using Web 3D in cyberspace.

  • PDF

Development of Virtual Reality Multi Screen Simulation System based on BIM (BIM 기반의 가상현실 다면투사 시뮬레이션 시스템 구축)

  • Seo, Myoung-Bae;Park, Hyung-Jin
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.231-238
    • /
    • 2017
  • Using 3D based BIM(Building Information Modeling) enables a variety of construction simulations. The is no case to simulate BIM demonstration experiment on deeply immersed virtual reality environment in korea. This paper develops a multi screen based simulation system to enable 3D based immersed environment to diverse decision making and virtual construction simulation. In a developed simulation laboratory, we can carry out BIM drawing review, disaster evacuation simulation, constructability review on wild land and design urban planning using haptic device on 3-side space with 4K resolution . Also, It can review large amount of drawings without data conversion because of compatibility with BIM software.