• Title/Summary/Keyword: 건설인력

Search Result 557, Processing Time 0.025 seconds

Hydraulic Investigation of Pyokkolche Reservoir (벽골제의 수공학적 고찰)

  • Lee, Jang-U
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.4
    • /
    • pp.397-406
    • /
    • 1998
  • The Pyokkolche Reservoir was constructed as a major public project of the ancient agricultural society, 1600 years ago. From a hydraulic point of view, it is considered to have been carried out with a distinguished technology. It should be in particular noticed that for a consecutive banking the main stream was diverted and drained to the Yonpo stream and the dam with same sea levels on its top along the whole length was built in a nearly straight line in spite of the different sea levels between both ends on the bottom. These suggest that the carrying out artifice and surveying technigue of those days were considerably excellent. However, the insufficient plan and design at the time of the construction, the temporary management and the repeated repair works in the later ages caused the Pyokkolche to lose its function. The Changsaenggeo and Kyungjanggeo gate sites being the facilities for sluices composed of a simple span and a vertical lift hand-operated sing a pully. The advantage of the geographical characteristics at both ends of the main dam was scientifically taken to these sites which also functioned as a spillway against a flood. The gate site of Suyogeo must have been located in an entrance to Suwolri, the northern end of the Pyokkolche and Yutonggeo is presumed to have been located on the right of Sangsori, the southern end of the Pyokklche. Keywords : Pyokkolche Reservoir, construction technology, gate site location.

  • PDF

Japanese case of community partnership for Healthy City Projects (일본 건강증진사업의 지역사회 자원과의 연대 구축 사례: 건강도시사업을 위한 지역사회 파트너 쉽 형성 사례)

  • Hoshi, Tanji
    • Proceedings of The Korean Society of Health Promotion Conference
    • /
    • 2005.09a
    • /
    • pp.197-230
    • /
    • 2005
  • 일본의 Soyo town에서 진행된 건강도시사업은 건강증진 프로그램 모형을 통하여 건강한 도시를 건설하겠다는 슬로건을 가지고 주민들이 참여하여 자신의 건강관리능력을 함양하고 서로의 장점을 공유하는 것을 사명으로 하고 있다. 또한 삶의 질 향상, 주관적 건강상태 향상, 삶의 만족도 향상, 정서적 유대감 향상, 수입증가 그리고 조기사망의 감소를 구체적 목적으로 설정하고 있다. 이러한 목적을 달성하게 위한 매우 실제적이며 수량화된 목표들이 설정되어 있다. 1992년에 사전조사를 실시하고 1996년과 2002년에 사후 조사를 실시하였다. 프로그램 내용과 과정에는 보건의료전문가와 시설에 대한 정비, 평가에 대한 계획, 학교를 포함한 포괄적인 보건의료시스템이 포함된다. 모든 부문은 자신들이 설정한 보건정책 결과에 대하여 모니터링을 진행하며 적절한 정책을 다시 설정하고 수량화된 목표를 설정하며 프로그램을 수행한다. 프로그램 수행의 가장 중요한 원칙은 사업의 기획, 수행, 평가 과정에 주민이 최우선적으로 참여한다는 점이다. Soyo town은 사업을 위하여 학교 및 지역 내 사조직과 협력하고 모든 사업의 기획과정에 다양한 구성원들을 참여시켰는데 이는 건강자원 개발에 있어 매우 중요하게 실천되어야 하는 문제이다. 특히 모든 Soyo town의 주민들이 참여하는 것을 원칙으로 하였다. 주민들은 건강관련 자원의 배치상태와 과학적 근거를 고려하여 효과적인 사업을 선정하는 것을 포함한 모든 사업의 과정에 참여하였다. 바람직한 생활양식을 향상시키기 위하여 식품회사, 자원단체 그리고 사회적 관계망 그리고 지역의 단체급식시설, 식당 등이 파악되었으며, 요양원, 가사도우미, 공중보건간호사, 방문간호사, 사회사업가로 구성된 보건의료 시설과 인력들이 협력하였다. 사업이 주민의 건강을 향상시켰는가와 건강향상에 사업이 효과적이었는지를 판단하기 위해서 평가가 진행되었는데, 서비스 제공자 뿐 아니라 소비자와 주민들도 평가를 수행하였다. Soyo town의 건강도시사업의 평가 결과, 조기사망률이 1988년 22.1%이 1992년 18.2%로, 1998년 15.6%로 감소하였다. 또한 주관적인 건강상태는 1988년 48%에서 1992년 67.1%로, 1998년 71.5%로 증가하였다. 전반적으로 주관적 건강상태, 사회적 관계망, 보건의료서비스에 대한 접근성은 증가하였으며, 조기사망, 의료비용은 감소하였다. 한편 보건의료부문의 질적인 향상을 가져왔으며, Soyo town은 건강한 도시의 명성을 얻게 되었다. 사업의 효과성을 향상시킨 요인은 주민 개개인들에게 사업의 기획과정에 처음부터 참여할 기회가 주어졌다는 점과 자원개발에 있어 기존자원의 재개발에 우선순위를 두었다는 점이었다. 효과적인 사업의 수행을 위하여 행정부, 주민, 건강관련 단체들은 수단과 방법에 관한 정보를 교환하는 것이 중요하다. 사업의 기획단계에 모든 이해당사자들이 참여하여 각자의 역할분담을 명확히 하는 것이 필요하며, 건강증진은 개인의 노력 뿐 아니라 사회적 환경의 개선과 자원의 개발을 통해서 달성되는 것이므로 주민들은 건강증진을 위한 환경개선을 위해 노력도 병행되어야 한다.

  • PDF

Tensile Resistance and Field Application of Hang-type PC Beam (걸이형 PC보의 인장저항성 및 현장적용)

  • Ha, Sang-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.5
    • /
    • pp.449-457
    • /
    • 2020
  • Due to the improvement of living standards and avoidance of the 3D industry, it is difficult to find young and competent domestic workers at construction sites, and most foreign workers are contributing to the replacement, but the quality is still deteriorating due to lack of skilled workers and aging. Precast method is a method that make members in factory and assembles them on site, which can be expected to improve labor force and quality. This study is intended to provide basic data for the development of hang-type PC beams that can be applied to the determination of the field application of developed PC beams. The U-type connecting material is installed on both ends of the hang-up PC beam, and the role of the U-type connecting material is very important because it is a simple construction method through the U-type connecting material. In addition, the performance of the U-type connecting material will determine the performance of the hang-type PC beam as the final destruction occurs in the hang-type PC beam. The material properties of U-type connecting material were identified through structural experiments, and the end test corresponding to the partial experiment was conducted based on the material test results identified. Finally, the final design value of PC beams was proposed through structural experiments for application to the site.

우리도 국제수학경시대회(IMO)에 참가 하여야 한다.

  • 박한식;최영한
    • The Mathematical Education
    • /
    • v.25 no.2
    • /
    • pp.1-11
    • /
    • 1987
  • 호주 정부는 1988년이 유럽인의 호주 이민 200주년이 되는 것을 기념하여 대대적인 행사를 추진하고 있으며 이 행사의 일환으로 1988년 7월 9일 부터 21일 까지 "제29회 국제수학경시대회"를 개최할 예정이다. 이 대회의 주최측에서는 우리나라에도 중ㆍ고등학생의 참가를 요청하였다. 필자들은 이 대회에 우리나라 대표를 파견할 경우를 대비하여 그 동안 IMO에 관한 여러가지의 정보를 조사한 바 대회 참가 여부에 대하여 다음과 같은 결론을 얻었다. 1. 참가의 필요성 (1) 중ㆍ고등 학생들에게 수학에 관한 관심을 높히고, 나아가서는 모든 국민에게 과학적인 사고의 향상을 기대한다. (2) 궁극적으로 수학을 위시한 기초 과학, 응용 과학에 대한 전반적인 관심도가 높아져서 수학자 및 과학자의 저변 확대를 기대할 수 있고, 특히 수리적인 사고력이 뛰어난 사람을 조기에 찾아내어 2000년대의 과학 선진국 건설에 중추적인 역할을 맡을 인력자원을 확보할 수 있다. (3) 현재 중ㆍ고등학교 수학 교육이 계산 위주, 암기 위주로 되어 있고, 학력 고사를 위시하여 많은 시험이 객관적으로 사고력 배양이 고려되지 않고 있다. IMO 참가자를 선발하기 위하여 거국적인 경시 대회를 개최한다면 자연히 이를 대비한 주관식 문제를 접할 기회를 가지게 되고, 따라서 수학 교육의 목적중의 하나인 사고력 배양을 기대할 수 있다. (4) 우리 국민의 조직적인 사고력과 과학적인 두뇌를 세계적으로 자랑할 수 있는 좋은 기회이다. (5) 자라나는 새싹들에게 국제 대회의 기회를 주므로써 장차 우리나라의 수학 수준을 국제적으로 높힐 수 있는 기틀을 마련한다. 2. 우리나라 학생이 IMO에 참가하여 우수한 성적을 거둘수 있는지 여부 (1) 절대적으로 있다. 참가하는 첫 해부터 상위권에 들어갈 것이다. 우리의 중ㆍ고등학교 수학 수준이 세계 평균보다 약간 높다. 그리고 몇 년의 경륜을 쌓는다면 세계 1, 2위에 도전 할 수 있다. 이것은 올림픽이나 아시아 게임에 기울이는 비용의 몇 만분의 일을 가지고, 그 보다 훨씬 높은 수준의 국력을 과시할 수 있는 기회이다. (2)매년 그 성적이 올라가리라 생각한다. 예로서 우리와 비교하여 형편없는 국력을 가진 몽고가 8년간 꼴찌를 하다 1894년 대회에서 참가국 33개국 중에서 10위를 차지하였다. 미국은 참가 첫 해부터 2위를 하였고, 11년 동안 1위 2번, 2위 4번을 하였으며, 매번 5위 이내에 머물렀다. (3) 월남은 그 나라의 사정때문인지 자주 참가하지 못하였다. 그러나 참가할 때마다 항상 상위권에 속하였다. 이것은 월남 국민들의 수학에 관한 관심도를 나타낸다고 본다. 우리 국민도 월남 국민에 못지 않으리라 생각한다. 3. 한국수학교육학회가 주관하여 뛰어난 학생을 선발 할 수 있는지 여부 (1) 있다. (2)한국수학경시대회 (KMO) 위원회를 한국수학교육학회 산하에 구성하여 KMO를 주관하게 하고, 또 국내의 여러 수학경시대회에서 우수한 성적을 나타낸 학생중에서 일정한 인원(50명 정도)을 선발하여 특별히 선정된 훈련팀으로 하여금 조직적인 훈련을 시킨다면 된다. 4. 기타 (1) 과거 어떠한 형태로든 국제 대회에 참가한 경력은 전혀 없다. (2) 1960년대에 서울대학교 공과대학 학생회에서 주최한 수학경시대회가 있었으나 보잘것이 없었고, 현재에도 각 시도별 또는 대학주관의 경시대회가 있으나 거국적인 호응을 받지 못했다. 물론 국제 대회에 참석시키는 것은 엄두도 내지 않았다.

  • PDF

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

A Study DH the Identification Of Critical Intelligent Information Technologies and Application Areas in the Defence Side (국방부문 핵심지능정보기술 식별 및 활용방안 연구)

  • 김화수;이승구
    • Proceedings of the Korea Inteligent Information System Society Conference
    • /
    • 2000.11a
    • /
    • pp.407-416
    • /
    • 2000
  • 국방 부문에 종사하는 관리자들은 국방정보시스템 사업관리에 있어서 최신정보기술에 대한 기본적인 사항은 알고있어야 효율적이고 효과적이며 성공적인 사업관리를 진행할 수 있을 것이다. 국방 부문에 종사하는 관리자들이 저비용 고효율의 국방정보시스템을 건설하고 운영 유지관리 하기 위하여 알아야 할 핵심 및 최신정보기술은 크게 인공지능기술, 멀티미디어 정보화 기술, 가상현실 기술, 시뮬레이션 기술, 텔레프레즌스 기술, 나노테크놀로지 기술, 데이터베이스 기술, 병렬처리 기술, 로봇공학 기술, 소프트웨어 공학에 관련된 기술 등이 있다. 그러나 국방부문에 종사하는 정보통신 전문 인력을 제외한 관리자들이 국방관련 사업관리를 수행하면서 정보기술에 대한 이해 수준이 비교적 낮기 때문에 효율적으로 국방사업을 준비, 계획, 추진하기 어려운 실정이다. 따라서 국방부문에 종사하는 관리자들이 정보기술을 알기 쉽게 이해할 수 있도록 국방부문 핵심지능형정보기술 발전 및 군 활용방안을 이해하기 쉽도록 작성하며 효율적인 사업관리가 이루어질 수 있는 방안을 연구하였다. 본 논문은 국방부문핵심 지능정보기술 식별 및 활용방안을 연구하여 핵심적으로 식별된 사항들을 우리 국방부문의 $C^4$I(지휘, 통제, 통신, 컴퓨터시스템)시스템, 내장형 무기시스템, 각종 교육훈련 정보시스템, 자원관리 정보시스템 등에 어떻게 적용할 것이며 적용시 기대효과는 무엇인가를 제시토록 하여 국방부문에 종사하는 관리자들이 각종 국방사업을 조정, 통제, 확인, 감독, 준비/계획하면서 참고하여 저비용 고효율의 국방관련 각층 사업을 관리할 수 있는 능력을 배양시키도록 연구를 수행하였다. 국방관련 각종 사업을 관리할 수 있는 능력을 배양시키도록 연구를 수행하였다. 국방부문 핵심지능정보기술 발전 및 활용 방안에 포함될 주요 내용을 요약하여 제시하였다.의 경향성을 나타내는 오차 주기(error cyc1e)를 이용함으로써 고객들의 수요의 경향성을 좀 더 세밀한 부분까지 파악할 수 있게 해 준다.ction, secondary electron microscopy, atomic force microscoy, $\alpha$-step, Raman scattering spectroscopu, Fourier transform infrared spectroscopy 및 micro hardness tester를 이용하여 기판 bias 전압이 DLC 박막의 특성에 미치는 영향을 조사하였다. 분석결과 본 연구에서 제작된 DLC 박막은 탄소와 수소만으로 구성되어 있으며, 비정질 상태임을 알 수 있었다. 기판 bias 전압의 증가에 따라 박막의 두께가 감소됨을 알 수 있었고, -150V에서는 박막이 거의 만들어지지 않았으며, -200V에서는 기판 표면이 식각되었다. 이것은 기판 bias 전압과 ECR 플라즈마에 의한 이온충돌 효과 때문으로 판단되며, 150V 이하에서는 증착되는 양보다 re-sputtering 되는 양이 더 많을 것으로 생각된다. 기판 bias 전압을 증가시킬수록 플라즈마에 의한 이온충돌 현상이 두드러져 탄소와 결합하고 있던 수소원자들이 떨어져 나가는 탈수소화 (dehydrogenation) 현상을 확인할 수 있었으며, 이것은 C-H 결합에너지가 C-C 결합이나 C=C 결합보다 약하여 수소 원자가 비교적 해리가 잘되므로 이러한 현상이 일어난다고 판단된다. 결합이 끊어진 탄소 원자들은 다른 탄소원자들과 결합하여 3차원적 cross-link를 형성시켜 나가면서 내부 압축응력을 증가시키는 것으로 알려져 있으며, hardness 시험 결과로 이것을 확인할 수 있었다. 그리고 표면거칠기는 기판 bias 전압을 증가시킬수록 더 smooth 해짐을 확인

  • PDF

A Basic Study on BIM Library Business Model based on Building Material Information System (건축 자재 정보 시스템기반 BIM 라이브러리 비즈니스 모델에 관한 기초 연구)

  • Lee, Goon-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.43-49
    • /
    • 2017
  • In recent years, the use of BIM in domestic construction has been increasing, but it is used mainly for internal and external visualization rather than for BIM design including drawings. For this reason, several studies have highlighted the lack of libraries and economic problems for BIM design. In other words, for the most economically small domestic design offices, activating the BIM design is a negative factor because it is difficult to invest the necessary manpower and cost to produce and use the required BIM library. The BIM design can be more applicable if the library can be supplied economically, easily, and quickly. In this study, BIM library business model and consideration factors that can provide BIM library service economically, easily, and quickly by considering the existing building material selection task and BIM library are presented. The proposed business model will increase the number of suppliers of BIM libraries, which are lacking in Korea, and will enable an effective BIM design at low cost and effort. If a service that reflects the business model proposed in this study is made, an integrated database that can consistently share information in the design, construction, and maintenance stages will be constructed. This can monitor the changes in material and equipment information during the life cycle of the building. The database can be used to monitor any changes in material and equipment information throughout the life cycle of a building, so that it can be used as historical data for effective design and maintenance as well as for material and equipment upgrades.

Classifying Sub-Categories of Apartment Defect Repair Tasks: A Machine Learning Approach (아파트 하자 보수 시설공사 세부공종 머신러닝 분류 시스템에 관한 연구)

  • Kim, Eunhye;Ji, HongGeun;Kim, Jina;Park, Eunil;Ohm, Jay Y.
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.10 no.9
    • /
    • pp.359-366
    • /
    • 2021
  • A number of construction companies in Korea invest considerable human and financial resources to construct a system for managing apartment defect data and for categorizing repair tasks. Thus, this study proposes machine learning models to automatically classify defect complaint text-data into one of the sub categories of 'finishing work' (i.e., one of the defect repair tasks). In the proposed models, we employed two word representation methods (Bag-of-words, Term Frequency-Inverse Document Frequency (TF-IDF)) and two machine learning classifiers (Support Vector Machine, Random Forest). In particular, we conducted both binary- and multi- classification tasks to classify 9 sub categories of finishing work: home appliance installation work, paperwork, painting work, plastering work, interior masonry work, plaster finishing work, indoor furniture installation work, kitchen facility installation work, and tiling work. The machine learning classifiers using the TF-IDF representation method and Random Forest classification achieved more than 90% accuracy, precision, recall, and F1 score. We shed light on the possibility of constructing automated defect classification systems based on the proposed machine learning models.

A Study on the Legal Liabilities of Contractor as a Delay in the Product Delivery on the Offshore Plant Construction Contract (해양플랜트공사계약상 제조물인도지연에 따른 당사자의 법적 책임에 관한 고찰)

  • Jin, Ho-Hyun
    • MARITIME LAW REVIEW
    • /
    • v.29 no.2
    • /
    • pp.115-144
    • /
    • 2017
  • The impact of the global financial crisis, which began in the United States in 2007, had a major impact on the domestic shipping and shipbuilding industries. In this regard, the domestic shipyard has established an order-taking strategy in several ways as an alternative to lowering the amount of construction of commercial vessels due to deterioration of the shipping industry, and selected industrial sector was the offshore plant sector. However, the domestic shipyard has under performed the offshore plant in order to just increase sales and secure work without any risk analysis for EPC contracts. As a result, the shipyard has been charged more than the initial contract price with the offshore plant contractor, or the shipyard has become a legal issue requiring payment of liquidated damages due to delays in delivery of the product. The main legal disputes are caused by the thorough risk analysis and the inexperience of process control that can occur during offshore plant construction. and In particular, there is no sufficient review of the unequivocal provisions in the contract as an element of risk management. There is no human resource to review these contractual clauses. Therefore, this study identifies the existence of specific risks that could lead to delays in offshore plant construction, and examined the existence of any unequivocal clauses in contracts for offshore plant construction. and also discussed how the toxic clause applies to the actual parties and how the concrete risk factors in the construction contracts are transferred and expressed by referring to the interviews with the project manager of the domestic shipyard and the previous research. As a result, This paper examined the legal liability of the contracting parties regarding delayed delivery of the products due to the offshore plant construction contract. And to improve the domestic shipbuilding industry.