• Title/Summary/Keyword: 건설문서

Search Result 243, Processing Time 0.034 seconds

Improvement of Synthesis Construction Plan through 6sigma (6시그마를 통한 종합시공계획서 작성 프로세스 개선)

  • Baek, Ho-Jin;Yoo, Chang-Kyu;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.613-617
    • /
    • 2007
  • To achieve project successfully in domestic construction site, pre-management of risk is important factor. Synthesis Construction Document made early construction is representative as means of pre-management of risk. But, Synthesis Construction Document is not working properly for pre-management of risk because the level is low as Synthesis Construction Document is made formally and the time is too late to pre manage the risk for various factor. A epoch-making method that differ with existing need to solve this deep-rooted problem of domestic construction site. So, this study is analyzing to achieve subject to heighten level Synthesis Construction Document and shorten creation period with "S"construction company(introducing 6sigma by tool of management innovation 6 sigma)'s data and offering an opportunity that heightens effectiveness and goes forward and aims possibility about construction site suitability of 6sigma by confirming Pilot Test.

  • PDF

Developing a Project Management Information System for Construction Claims (건설 클레임에 대비한 정보관리시스템 개발)

  • Wang, Hankyeom;Park, Junil;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.70-81
    • /
    • 2018
  • Claims in the construction industry can have a serious impact on the profitability of the project or can even result in project failure if it fails to take appropriate prevention. In order to properly prevent and respond to the potential claims and legal disputes throughout the project execution, it is necessary to continuously accumulate informations and clearly define the roles and responsibilities of the important activities systematically. Based on these needs, this study develops and verifies the project information management system(PMIS) that can prevent and respond possible claims for construction projects. Developed system includes such management modules as schedule, cost, PM/CM, design, collaboration, and claims. The system was validated by adopting it to the practical projects. The results showed that information systems tailored to the construction claim need to elevate users' familiarity to be more useful. Besides, the system can be more functional when used by both owners and contractors.

A Method for Information Management of Defects in Bridge Superstructure Using BIM-COBie (BIM-COBie를 활용한 교량 상부구조의 손상정보 관리 방법)

  • Lee, Sangho;Lee, Jung-Bin;Tak, Ho-Kyun;Lee, Sang-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • The data management and the evaluation of defects in the bridge are generally conducted based on inspection and diagnosis data, including the exterior damage map and defect quantity table prepared by periodic inspection. Since most of these data are written in 2D-based documents and are difficult to digitize in a standardized manner, it is challenging to utilize them beyond the defined functionality. This study proposed methods to efficiently build a BIM (Building Information Modeling)-based bridge damage model from raw data of inspection report and to manage and utilize the damage information linking to bridge model through the spread sheet data generated by COBie (Construction Operations Building Information Exchange). In addition, a method to conduct the condition assessment of defects in bridge was proposed based on an automatic evaluation process using digitized bridge member and damage information. The proposed methods were tested using superstructure of PSC-I girder concrete bridge, and the efficiency and effectiveness of the methods were verified.

Development of Real-Time Locating System for Construction Safety Management (건설 안전관리를 위한 실시간 위치추적(RTLS)기술 개발)

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moon-Seo;Kim, Hyun-Soo;Baek, Yun-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.106-115
    • /
    • 2010
  • Recently, as the size of construction projects are getting bigger and higher, more effective managing methods are required in management areas such as duration reduction, cost reduction and quality management. In the current construction industry, conjunction with IT(Information Technology) is being noticed as a solution to support these needs. Various IT solutions such as Bar Code, Personal digital assistant(PDA), global positioning system(GPS), radio frequency identification(RFID) are being developed. In this research, among the various IT solutions, the Real Time Locating System(RTLS) which is acknowledged as a technology with high applicational potential is analyzed. Based on this analysis, a locating system to apply in construction sites is developed and validated. The locating system is developed to prevent construction disasters through real-time management of workers and equipment, which enables effective application in the area of construction safety management. Moreover, applications of the locating system in many different areas like construction material realtime monitoring, construction automation, construction quality management, maintenance management are expected.

Cost Performance Evaluation Framework through Analysis of Unstructured Construction Supervision Documents using Binomial Logistic Regression (비정형 공사감리문서 정보와 이항 로지스틱 회귀분석을 이용한 건축 현장 비용성과 평가 프레임워크 개발)

  • Kim, Chang-Won;Song, Taegeun;Lee, Kiseok;Yoo, Wi Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.121-131
    • /
    • 2024
  • This research explores the potential of leveraging unstructured data from construction supervision documents, which contain detailed inspection insights from independent third-party monitors of building construction processes. With the evolution of analytical methodologies, such unstructured data has been recognized as a valuable source of information, offering diverse insights. The study introduces a framework designed to assess cost performance by applying advanced analytical methods to the unstructured data found in final construction supervision reports. Specifically, key phrases were identified using text mining and social network analysis techniques, and these phrases were then analyzed through binomial logistic regression to assess cost performance. The study found that predictions of cost performance based on unstructured data from supervision documents achieved an accuracy rate of approximately 73%. The findings of this research are anticipated to serve as a foundational resource for analyzing various forms of unstructured data generated within the construction sector in future projects.

Analyzing Article 85(Penalty) in the Construction Technology Promotion Act based on the Principle of Legality (죄형법정주의에 입각한 건설기술 진흥법 제85조(벌칙) 고찰)

  • Kim, Eunbae;Lee, Hyun-Soo;Park, Moonseo;Son, Bosik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.119-127
    • /
    • 2016
  • Since May 23, 2014, the Construction Technology Promotion Act has been effect through the entire reform of the Act. Despite the extensive reform, the previous penalty articles remain intact. According to the article 85 (1), especially, if a service provider or an engineer has caused death or injury by violating the duty of good faith and by damaging the principal parts of facilities, the person should be sentenced for lifetime imprisonment or imprisonment for no less than three years. The article has been controversial in its clarity and adequacy. This study is to verify the characteristics and the scope of the article and to suggest the theoretical backgrounds by analyzing the article based on the principle of legality, which enables to set forth the possibility to improve the article. To achieve the goal, the provision has been analyzed in accordance with the basic laws in Korea including the constitutional law and the criminal law, the related cases have been collected, and the comparison of the relevant acts has been executed. The detailed discussion about the articles in laws and acts on construction and the long-term and integrated study are expected to vitalize through this research.

The Development of Noise Management Model using Active Noise Control Technique on Construction Site (능동소음제어를 이용한 건설현장의 소음관리모델 개발 - 도심지 공사현장을 중심으로 -)

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Ahn, Joseph;Kim, Sunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.12-22
    • /
    • 2014
  • Recently, many people have been damaged seriously by construction noise. Accordingly, there have been increased the complaints and disputes. These complaints should be controlled strictly. Otherwise there could be delays or stops of project and losses of time and money. For this reasons, the Korean government is trying to convert from depending on the soundproof wall to noise control system focusing on noise sources. However, it is difficult to control the noise which is generated from construction site because construction equipment has very high noise level and construction noise generates temporarily and irregularly. Also, people do not know how much low frequency affect human body adversely because they cannot perceive low frequency noise easily. Hence, recently developed countries have conducted the research on the low frequency noise which damages on human physically and mentally. However, passive noise control is insufficient to reduce the low frequency noise, but only efficient to lower the high frequency noise. Thus, an approach which can complement limitations of passive noise control is needed. Therefore, the purpose of this research is to suggest the noise management model using active noise control on construction site. Also, ANC simulation has been conducted to examine its applicability on construction equipment. As a result, it is expected that there will be a reduction of construction noise and demages, as well as both mental and physical damages.

COBie Based Maintenance Document Generation of Railway Track (COBie 기반 철도 선로유지관리 문서 생성)

  • Seo, Kyung-Wan;Kwon, Tae-Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.4
    • /
    • pp.307-312
    • /
    • 2017
  • In this study, we proposed a method to generate a maintenance documents for railway track through Construction Operations Building information exchange(COBie) which is a subset of Industry Foundation Classes(IFC), a data model for Building Information Modeling(BIM). In order to define the items necessary for railway track maintenance document generation, we analyzed the guideline of maintenance and management to track by the Ministry of Land, Infrastructure and Transport(MLTM), and defined the way to refer to the information items in the COBie spreadsheet. The additional properties not supported in IFC, were created for generation of an Information model that reflecting maintenance information items of railway track by applying user-defined property set within the IFC framework. An IFC-based Information model reflecting the user-defined property was implemented through BIM software, and rail track maintenance information items were transferred to COBie spreadsheet according to the defined approach. It is tested that the information can be transferred from the IFC-based as-built model to the COBie spreadsheet, which can be used to generate the necessary documents for railway facility maintenance work.

A Study on Securing Safety at Small and Medium-sized Construction Sites using The Safety and Health Register at Each Construction Stage (건설 단계별 안전보건대장을 활용한 중·소규모건설현장의 안전성 확보 방안)

  • Lee, Goon-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.11
    • /
    • pp.187-192
    • /
    • 2020
  • In the past 20 years, accidents in the construction industry have declined in absolute numbers. On the other hand, disasters occurring at small and medium-sized construction sites account for more than 80% of the entire construction industry and are showing a continuous increase. A system for preparing a safety and health register in stages was enacted to preemptively prevent accidents by mandating responsibility for safety to owners with relatively strong authority in the construction industry. Considerable is needed to become an effective legal system. Although there have been many studies related to safety management plans and hazard prevention plans, there are no studies on the safety and health register. Therefore, in this study, an improved safety management procedure connected with the orderer's safety and health management procedure was presented as a plan for reducing accidents at small and medium-sized construction sites. All information was made as a data-based procedure to reduce the burden on the manager. The results of this study are expected to be used as basic data for the development of a safety management support information system for small and medium-sized construction sites.

Optimum Delivery Frequency for Reducing Construction Logistics Cost under a Carbon Taxation (탄소세 부과시 건설 물류비용 최소화를 위한 운송빈도 최적화)

  • Park, Moon-Seo;Chun, Myung-Hee;Lee, Hyun-Soo;Hwang, Sung-Joo;Jang, Myung-Houn
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.3
    • /
    • pp.73-82
    • /
    • 2011
  • The term 'green' has become an important way of survival for the construction industry in 21th century in accordance with the emergence of the environmental crisis due to the climatic change. Especially the policy of carbon taxation, planed to be introduced from 2012, is expected to be a considerable burden to the construction industry which has abundant carbon emission during the resource transportation due to the complexity of resources and local distribution of the construction sites. In this regard, this study shows an optimizing strategy for delivery frequency, which downsizes the net distribution costs based on the assumption that, despite of its other advantagements, the frequent small lot mode of JIT delivery would take negative effects due to the increase of costs of transportation and carbon emission once the carbon taxation policy carried out. To simulate the efficiency of the management strategies, the System Dynamics modeling has been used. The results show that the frequent small lot transportation strategy is now always efficient method to these changes, and that the frequency of transportation should be re-determinated according to the extent of the imposition of carbon tax. This study provides the conceptual frame for an efficient management of transportation system of the construction industry, showing necessity of change of the resource transportation systems through analysing JIT deliver system in accordance with the global changes in environmental economy.