References
- Choi, J. W. (2015). "An Analysis on Regional Differences of Major Delay Factors in Overseas Architectural Projects-Focused on the Southeast Asia and the Middle East." MS thesis, Hanyang Univ., Seoul.
- Choi, S. K. (2016). "Legal Issues Relating to Acceleration in International Construction Contracts." Korean Forum on International Trade and Business Law, 25(1), pp. 205-243.
- Chung, H. S. (2014). "Comparative Analysis on Concurrent Delay in International Construction Contract-Focusing on Common Law Approaches." The Korean Association of Comparative Private Law, 21(2), pp. 827-864.
- Kim, W. T. and Lee, Y. H. (2012). "Overseas Construction Contracts and Claim Management Status and Countermeasures." Construction Economy Research Institute of Korea, CERIK, Construction Issue Focus, pp. 1-29.
- Jeon, K. H. and Yoon, S. H. (2010). "A Study of Improvement Through Utilization of PMIS and Perceptions of Field Managers Research." Journal of The Regional Association of Architectural Institute of Korea, 2010(1), pp. 383-386.
- Jeong, M. J. and Cho, Y. J. (2007). "A Study on the Improvement Contract System of to Prevent Domestic Public Construction Claims." Proceedings of KICEM Annual Conference, KICEM, 7, pp. 239-242.
- Kang, L. S. and Kwon, J. H. (2008). "Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis." Journal of the Korean Society of Civil Engineers, KSCE, 28(5D), pp. 685-694.
- Kim, Y., Hong, J., Kim, K., and Kim, J. (1999). "A Study on the Reasonable Analysis Method for Delay Claims-Based on Judical Precedents." Journal of the Architectural Institute of Korea Structure & Construction, 15(7), pp. 117-126.
- Kim, Y. J., Kim, T. S., Jo, D. S. and Lee, H. G. (2015). " A Study on Substantiation Methodology for Extension of Time in International Mega-Project Claims." Korean Journal of Construction Engineering and Management, KICEM, 16(3), pp. 165-176. https://doi.org/10.6106/KJCEM.2015.16.3.165
- Construction Economy Research Institute of Korea (CERIK) (2008). Analysis on the Trends in Construction Claims in Korea, CERIK Research Report, 1998-10.
- Lee, J. H., Lee, H. S., Park, M. S. and Kim, I. H. (2007 ). "Claim Management during Construction Based on Key Claim Management Factors." Proceedings of KICEM Annual Conference, KICEM, 7, pp. 463-468.
- Seo, J. H., Kim, Y. S. and Jin, S. Y. (2010). "Eliciting Management Factors of Claims types for Coping with The Construction Claim." Proceedings of KICEM Annual Conference, KICEM, 10, pp. 287-288.
- Sung, N. W., Kim, Y. S., Lee, M. Y. and Lee, J. S. (2006). "The Development of a Web-based Decision Support System for Construction Claim Management." Journal of Korea Society of Civil Engineers. KSCE, 26(1D), pp. 115-123.
- Yoon, J. S. (2006). "A Study of Analyzing Claim Factor and Making Strategies to Prevent Claim in Early Stage for Architectural Turn-key Project." Journal of Korea Institute of Building Construction, 6(1), pp. 93-99. https://doi.org/10.5345/JKIC.2006.6.1.093