• Title/Summary/Keyword: 건설관리프로세스

Search Result 573, Processing Time 0.024 seconds

A Study on the Framework of the Continuous Improvement Model of Construction Process using Construction Failure Information (건설실패정보를 활용한 건설 프로세스의 지속적 개선 모델의 개념적 틀에 관한 연구)

  • Jeon Yong-Seok;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.195-204
    • /
    • 2005
  • The construction failures can be decreased by continuously improving the construction process based upon the information of construction failures. Herein, the information of construction failures can be utilized as the key factor far identifying the ineffective process and providing the improved construction process that can prevent failures. The objective of this research is to suggest a model for improving construction process continuously by using the information of construction failures. An extended review and analysis of literatures related to the construction failure are performed to investigate the definition, type, cause, and lesson teamed of failure. This research also identifies that process modeling methodology and case-based reasoning are applicable to the construction process improvement, and then it suggests a framework of CIMCP(continuous improvement model of construction process based on the module of case-based reasoning such as case retrieval, case index, and case adaptation.

The Process Development and Application of the Contingency Management by the Performance Analysis (성과분석을 통한 건설공사 예비비 관리 프로세스 및 적용)

  • Lee, Man-Hee;Lee, Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.84-92
    • /
    • 2007
  • To reduce uncertainties and make rational plans, the presumption of contingency against a failure of projects and an occurrence of unpredictable risks is important with accurate estimations as the work progressing. Therefore, if the presumption of contingency reflecting uncertainties carries out at a decision making point of time, be able to prepare for risks. The purpose of this paper is to present a management process of contingency through the performance analysis of project. In the cost planning phase, this study offers a process which is predictable contingency and predicts the range of fluctuation of the cost, laking an advantage of EVM in construction phase. With reflecting the results from this procedure, this study presents a process, rationally manageable contingency.

The Study on Correlation Between Factors Decreasing Construction Productivity and Waste Factors with Relation to Lean Construction (린 건설과 연계한 생산성 저하 요인과 Waste 요인과의 상호 관련성 연구)

  • Park Joo-Hyun;Kim Dae-Young;Lee Hak-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.164-172
    • /
    • 2003
  • 생산성은 프로젝트를 관리하는데 있어서 효율성을 측정하는 중요한 지표이다 또한 건설 생산성은 비용 및 일정과 연관성이 있을 뿐만 아니라 프로젝트의 성공 여부와도 관련이 크다. 프로젝트에서 생산성의 중요성에도 불구하고 국내에서의 생산성 관련 연구는 생산성에 대한 기본 개념 및 원칙에 관한 기초적인 연구 없이 정량적인 연구에 집중되어 있으며, 관련 데이터 수도 적은 실정이다. 국내 건설 공사의 생산성을 향상시키기 위해서는 생산성 관리의 정량적친 요인뿐만 아니라, 정성적인 요인까지 관리해야 하며, 저하요인에 따른 체계적이고 세부적인 프로세스 및 기법이 제시되어야 한다 이에 국내 건설 공사의 생산성 관리에 린 건설을 도입하고자 한다. 본 연구에서는 국내 생산성 저하요인과 린 건설에서의 Waste 요인과의 상관관계 분석을 통해 국내 건설 공사 현장에서의 Waste 주요 의미를 살펴보고 두 요인간의 상호 관련성을 파악하여, 린 건설의 프로세스 및 기법을 국내 건설 공사 현장에 적용하기 위한 이론적인 근거를 제공하고자 한다.

Improvement of the Pipe Welding Management Process for Petrochemical Plant Projects (석유화학 플랜트 배관공사용 용접관리 프로세스의 개선)

  • Shin, Euicheol;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.11 no.4
    • /
    • pp.47-54
    • /
    • 2015
  • 국내 플랜트 엔지니어링 및 건설 업체들의 수익성 악화가 지속됨에 따라 플랜트 원가 경쟁력 강화 및 생산성 향상에 대한 요구가 증대되고 있다. 본 논문에서는 ISO 도면으로부터 용접 포인트의 번호를 부여 하는 용접커팅플랜 작업과 용접이력관리를 위한 용접검사보고서 작성에 대하여 현행 프로세스를 분석하고 문제점을 도출하였다. 현행 프로세스에서는 수작업에 따른 생산성 저하와 현장변경요청 발생에 대한 검증의 어려움이 발생하여 전산화를 통하여 석유화학 플랜트 배관공사용 용접관리 프로세스를 개선하였다. 개선 효과의 검증을 위해 국내 석유화학 플랜트 건설 프로젝트를 대상으로 현장변경요청 발생률과 업무 생산성 향상에 대하여 개선 전후를 비교하였다. 개선된 프로세스를 적용하여 현장변경요청 발생률은 개선프로세스 적용 이전 대비 4.3%p 감소하였고, 업무 생산성은 개선프로세스 적용 이전 대비 생산성이 한 장당 0.13 시간 향상이 있음을 확인할 수 있었다.

  • PDF

Application of a REID-Based Monitoring System for the Concrete Pour Process (RFID를 응용한 콘크리트 타설 모니터링 시스템의 적용방안)

  • Moon, Sung-Woo;Hong, Seung-Moon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.142-149
    • /
    • 2007
  • A ubiquitous environment in construction should be developed integrating hardware and software systems. The objective of this paper is to study the feasibility of applying the RFID technology to the concrete pour process, and improve the effectiveness of data exchange A pilot system of u-CPS (Ubiquitous Concrete Pour System) has been developed to test the feasibility. The pilot can automatically generate the data for concrete pour work such as departure time, arrival time, concrete pour time. Construction managers can keep track of the progress of concrete pour work using the information. A case study was done for a building construction using the pilot system, the result of which demonstrated that the RFID-base system can help improve the effectiveness of data communication during the concrete pour process.

Integration for Port Construction Project Management System (항만건설사업관리시스템 통합화)

  • Jeong, Seong-yun;Kim, Young-jin;Kim, Tae-hak;Ok, Hyun
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2013.05a
    • /
    • pp.431-432
    • /
    • 2013
  • 본 연구는 기존에 운영 중인 항만건설통합정보시스템의 활용성과 시스템 운영관리의 효율성을 높이기 위해 시스템을 통합화하였다. 도로와 항만 건설사업관리는 대상목적물만 다르고 기본적인 업무프로세스는 유사하다. 따라서 통합 개발기간을 단축하고 안정적으로 통합화하기 위해 항만건설통합정보시스템을 기존에 운영하고 있는 도로건설사업관리시스템으로 통합하는 방식으로 추진하였다. 도로건설사업관리시스템은 항만건설통합정보시스템보다 시스템 사용이 쉽고 편리하며 건설사업관리 업무프로세스 지원 및 관리기능이 안정적으로 설계되었다. 본 연구는 시스템 통합화 과정에서 겪었던 애로사항과 이를 해결하기 위한 방안을 제시하였다. 타 시스템을 통합화할 경우에 본 연구 결과를 활용한다면 반복적인 시행착오를 미연에 예방할 수 있을 것으로 사료된다.

  • PDF

An Automated and Intelligent Process for Construction Supply Chain Management Utilizing Ubiquitous Technologies (USN 기술을 활용한 지능형 건설물류관리 프로세스)

  • Lee, Woo-Jae;Lee, Nam-Su;Yoon, Su-Won;Chin, Sang-Yoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.756-761
    • /
    • 2007
  • The construction Supply Chain Management(SCM) plays a critical role to proceed construction projects successfully. It is necessary to develop a system to support better communication among various actors and to supply construction materials in the right place on time with unstable situations on site according to the planned construction schedule for effective Supply Chain Management. Therefore, the objective of this study is to propose an automated and intelligent process that can be used to utilize ubiquitous technologies in construction supply chain management. This process consists of various equipments that can collect, store, calculate and communicate data among themselves. This study deals with a conceptual idea in order to improve process and equipment in the supply chain management process.

  • PDF

Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling (대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구)

  • Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.153-161
    • /
    • 2004
  • The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.