• Title/Summary/Keyword: 건설공정관리

Search Result 657, Processing Time 0.026 seconds

A Study on the Construction Specification and Quality Assurance Criteria in Clay Paver (점토바닥벽돌의 품질 및 시공기준 연구)

  • Park, Dae-Gun;Lee, Sang-Yum;Kim, Kyoon-Tai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.111-121
    • /
    • 2010
  • As the customer's interest for sidewalk block in the street or apartment complex is increasing, the materials of block which had been a concrete block exclusively are varied to clay paver, native rock and wood etc. Especially, the sales volume of clay paver which is environment-friendly and ergonomic is dramatically increasing every year with two digits growth rate, however, many problems like "Edge Cracking" "Freezing Breakage" "Bending Breakage" "Joint Gap" are happening frequently within a couple of hours after installation due to the durabilities. Because of the characteristics of Ceramic products, clay pavers are very easy to be broken when they are bumped against each other. In addition, they are relatively fragile by a freezing expansion breakage when exposed to water due to hydrophilic property as well as the intensity and absorptance of the products are varied with small difference from the production process such as production equipment and process control. Therefore, it costs a lot of money to repair the breakdown unless production and installation is carried out according to the strict criteria of the quality control. In this study, the symptoms of breakdown frequently happened in clay paver are classified by each type and finally the solution for this problem in the production of brick, installation and criteria of quality control through compressive strength and absorptance test is suggested.

Strategy for Various CM Applications based on Comparative Case Analysis (사례 비교분석을 통한 CM 적용 다양화 방안 - 발주자 특성 및 사업특성을 중심으로 -)

  • Kim, Namjoon;Jung, Youngsoo;Kang, Seunghee;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.10-17
    • /
    • 2016
  • Domestic CM market has continued to grow since the enactment of CM policies in 1996. In addition, future CM market is forecasted to have potential high growth. Therefore, it is necessary to apply various CM business models reflecting the owner's requirements and characteristics in order to improve in the CM industry and to strengthen the competitiveness in the overseas construction market. In this context, the purpose of this study is to suggest strategies of various CM applications based on comparison of 4 cases analyzed by 'business weight' and 'business depth' in terms of business function as well as by the types of 'CM market' and 'CM practice'. Result of this comparative analysis shows that each case presents differences in terms of type, business weight, and business depth of CM practice. However, domestic public CM services are currently being challenged to strengthen capability throughout the project life-cycle against the limitation of government's CM policies focused on the construction supervision. In order to address this problem, this study proposes the strategies of various CM applciations from several different perspectives

Analysis of Dose by Items According to Act on Safety Control of Radiation Around Living Environment (생활주변방사선안전관리법 시행에 따른 항목별 선량 분석)

  • Jeong, Cheonsoo;Oh, Hyunji;Lee, Jieun;Jo, Sumin;Park, Sohyun
    • Journal of the Korean Society of Radiology
    • /
    • v.7 no.6
    • /
    • pp.377-381
    • /
    • 2013
  • The study attempted to analyze items presented in Act on safety control of radioactive rays around living environment, which has been recently enacted. The test items have been divided into cosmic rays, cosmic rays, terrestrial radiation, and byproduct, etc., and the selected locations for measurement included an airplane at 8000m in the air, mountainous area at 1000m above sea level, 15m-underground building, construction site, and seashore at 0m altitude. The test showed that, based on cosmic rays, plane at 8000m in the air had 4.91mSv/y of effective dose per year. The mountainous area at 1000m above sea level, which was chosen to measure cosmic rays and terrestrial radiation, was measured 0.35mSv higher than the seashore at 0m in altitude due to the effect of cosmic rays and terrestrial radiation from the greater height above sea level. The construction site, chosen as a location to measure byproduct, showed the highest value among the items with 6.66mSv, which is as 10times high as that of a completed building. The seashore at 0m in altitude had 5.96mSv, and, 15m-underground building, based on terrestrial radiation, was the lowest with 4.91mSv. This suggests that, despite the assumption that terrestrial radiation will have greater effect deeper underground, it did not affect inside the building significantly. This study showed that the items presented in Act on safety control of radioactive rays around living environment were not close to effective dose limit for radiation workers proposed by ICRP. However, they were between 4 and 7 times higher than that for general public. This suggests that there should be continuous research on and attention to Safe Management of Daily Surrounding Radiation Act, which is still at its beginning stage.

A Study on the Establishment of Design and Construction Process Standardization through Building BIM Application Case (건축물 BIM 적용사례를 통한 설계 및 시공프로세스 표준화 수립에 대한 연구)

  • Jeong, Hee-woong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.4
    • /
    • pp.347-358
    • /
    • 2022
  • In order to satisfy the extraction and use of information such as estimates and processes required in the design and construction stages of BIM, which is an expectation of overall construction operation for the design and construction stage of domestic buildings, it is insufficient to supply and apply mobile technologies or terminals. In this paper, standardization of BIM-based processes from the design stage to the construction stage is proposed as an efficient construction system method through mobile-based simulation and test-bed case analysis review. The current status and potential of BIM application were identified through theoretical review of BIM and case studies at home and abroad. In addition, the overall flow of the project and the direction of effective process construction were investigated through each process by 3D, 4D, and 5D execution stage and the role of each collaborator. 4D building process BIM simulation system using mobile was implemented by applying a visualization engine that simulates process information, object information connection module, and related object information. Therefore, it was possible to minimize the possibility of re-construction of the BIM design and construction process model through the visualization of 2D drawings based on the 3D model of the building and the review of errors and interferences in the drawings. In addition, in the implementation of simulation for each process of the construction process through mobile devices, it was possible to support construction progress and process management according to the optimal option selected by the user.

Developing User Interfaces of Mobile PMIS Modules Based on Technology Demand Analysis (국내·외 사용자 기술수요 분석에 따른 모바일 PMIS UI개발)

  • Park, Kyung-Mo;Lee, Hyun Woo;Kim, Chang-Duk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.3
    • /
    • pp.244-251
    • /
    • 2014
  • Project Management Information System (PMIS) has not yet fully met needs of the construction industry. Based on the deficiency of the current system, the present study performed a survey to identify a need for mobile PMIS in the industry. The survey revealed that most respondents expect the development of mobile PMIS would contribute to improving the productivity and efficiency of field operations. Based on the survey findings, this study proposes a suite of modules for mobile PMIS, which are focused on construction management, document management, schedule management, and field information management. Mobile PMIS would allow to access from the field through mobile devices by using tablet computers and smart-phones. The study also suggests that the effectiveness of the system can be enhanced by user interfaces that are customized for each module.

Analysis of the commercial diving national qualification system for the introduction of a diving supervisor (잠수기능장 제도 신설을 위한 산업 잠수 국가자격체계 분석)

  • Sim, Kyoung-Bo;Cha, Joo-Hong;Kang, Sin-Young
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.40 no.7
    • /
    • pp.655-662
    • /
    • 2016
  • This study proposes that a diving supervisor, who can perform the role of both a field manager and a supervisor, be introduced in the national qualification system. The goal was achieved by surveying the general status of the commercial diving sector, including the statistics of an underwater construction company, commercial diving equipment operation condition, diver working hours, diver supply and demand status, and underwater construction market size. The national qualification and national competency standard (NCS) systems were also analyzed to deduce the role definition and work scope of the diving supervisor. Consequently, the following proposition is made: the diving supervisor should be an "on-site manager with the highest job skill in the commercial diving field, who can perform the on-site process management as well as guide, supervise, and educate project participants and serve as an intermediary between the contractor and the workers." The responsibilities of the diving supervisor are proposed to include "diving planning and operation of the diving team," "diving with surface-supplied air and mixed-gas diving system," "chamber operation," "underwater construction," and "ship salvage." The persistent issues in commercial diving sectors, such as diver career development, management, and worker supervision, are expected to be largely resolved with the introduction of this qualification.

A Study on the Success Factors Related to the Performance of Power Plant Engineering Projects (발전플랜트 엔지니어링 프로젝트 성공요인 우선순위 도출 연구)

  • Suh, Jaeho;Lee, Dongmyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.11-22
    • /
    • 2024
  • Power plant engineering industry obtains EPC plan project and delivers results about electricity, measurement, machinery, and piping and so on. Its works are taken by projects. Although power plant engineering composes 2~5% of whole EPC project cost, it's one of the fundamentals because it affects process after planning step a lot. However, domestic power plant engineering companies' project performance ability is insufficient and there's a need for systematic performance. Thus, this study defined related factors of successful performance and analyzed the priority among them through analytical hierarchy process. All respondents recognized experience, knowledge, and communication as important factors. Administrators considered knowledge, experience, and communication. But hands-on workers considered experience, knowledge, human resources. Those who have experience in oversea project considered process, experience, human resources. However those who don't have experience in oversea project considered knowledge, experience, and communication. Recognition of important factors varies by the position and work experience of members.

A Product Model Centered Integration Methodology for Design and Construction Information (프로덕트 모델 중심의 설계, 시공 정보 통합 방법론)

  • Lee Keun-Hyoung;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.99-106
    • /
    • 2002
  • Researches on integration of design and construction information from earlier era focused on the conceptual data models. Development and prevalent use of commercial database management system led many researchers to design database schemas for enlightening of relationship between non-graphic data items. Although these researches became the foundation fur the proceeding researches. they did not utilize the graphic data providable from CAD system which is already widely used. 4D CAD concept suggests a way of integrating graphic data with schedule data. Although this integration provided a new possibility for integration, there exists a limitation in data dependency on a specific application. This research suggests a new approach on integration for design and construction information, 'Product Model Centered Integration Methodology'. This methodology achieves integration by preliminary research on existing methodology using 4D CAD concept. and by development and application of new integration methodology, 'Product Model Centered Integration Methodology'. 'Design Component' can be converted into digital format by object based CAD system. 'Unified Object-based Graphic Modeling' shows how to model graphic product model using CAD system. Possibility of reusing design information in latter stage depends on the ways of creating CAD model, so modeling guidelines and specifications are suggested. Then prototype system for integration management, and exchange are presented, using 'Product Frameworker', and 'Product Database' which also supports multiple-viewpoints. 'Product Data Model' is designed, and main data workflows are represented using 'Activity Diagram', one of UML diagrams. These can be used for writing programming codes and developing prototype in order to automatically create activity items in actual schedule management system. Through validation processes, 'Product Model Centered Integration Methodology' is suggested as the new approach for integration of design and construction information.

  • PDF

Development of an Automated Gangform Climbing System for Apartment Housing Construction - Structural Stability and Tower Crane Lifting Load Analysis - (공동주택 전용 갱폼 인양 자동화 기술의 개발 - 구조적 안정성 및 타워크레인 양중부하 분석 -)

  • Lee, Jeong-Ho;Yang, Sang-Hoon;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.48-59
    • /
    • 2012
  • Gangform, compared to the traditional forms, is a systemized form which can reduce construction duration and cost by the advantage of using it repeatedly. However, transportation and climbing process of the Gangform is highly dependant on the performance of tower crane. Gangform climbing process takes one day out of six to seven days of a structural work cycle. Tower cranes can not be used in other lifting works when they lift the Gangform during the structural work cycle, causing the delay in the construction project. Numerous efforts and researches have been done in domestic and international industry to solve such limitations of Gangform climbing process. Especially, "A Study on the Development of Automatic Gangform Climbing System for Apartment Housing Construction"has suggested a conceptual model which can climb the Gangform system without a tower crane. In this paper, the technical and economical feasibilities of previously proposed Automatic Gangform climbing system are examined by evaluating its structural stability and lifting load reduction effect.

The Analysis of Job Stress of Workers in the Architectural Design Firm After the Introduction of BIM (BIM 도입 후 설계사무소 실무자들의 직무스트레스 분석)

  • Seo, Hee-Chang;Oh, Jung-Keun;Kim, Jea-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.120-131
    • /
    • 2012
  • Today, companies exist amid unlimited competition and uncertain adminstration environment, so hands-on workers are being exposed to various job requirements and stress due to this. Especially, employees in the design firm are physically difficult because of heavy working intensity unlike other industrial field, and because the process is interrelated unlike working of a five-day workday of the other industry, it is difficult to guarantee periodic holidays and vacation. In addition, recently, while BIM is introduced in the construction industry, various changes in the individual role as well as organizational dimension such as business environment and scope & role, etc. are required, so it is the actual situation that the category and factors of job stress due to this are being also changed. Accordingly, this research has grasped important and weak sectors according to characteristics such as career, position, gender, education and existence/nonexistence of BIM template, etc. by confirming a job stress level and inducing factors of hands-on workers at the design firm. This research has a meaning in constructing a business environment of a design firm that is a main participant of BIM-based projects that are expected to have high utilization in the future.