• Title/Summary/Keyword: 건설공기

Search Result 841, Processing Time 0.029 seconds

Effect of Office Building Remodeling Project Characteristics on the Occurrence of Schedule Delay Risk Factors (오피스 리모델링 프로젝트 특성에 따른 공기지연 리스크 발생 영향도)

  • Cho, Kyuman;Kim, Taehoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.5
    • /
    • pp.22-31
    • /
    • 2018
  • Due to the inherent risk factors of the remodeling projects, the remodeling project is failing frequently, and schedule delay are occurring in most remodeling projects. The risk factors that cause the delays in these remodeling projects are not common to all remodeling projects, and the likelihood of risk factors will be affected by the various characteristics of the project. In this context, based on the results of a reliable survey conducted on 29 construction managers who have performed remodeling projects, this research analyzes (1) "importance of each characteristic", which means how frequently the characteristics of the remodeling project affect the occurrence of risk factors, (2) "the likelihood of delay risk factors for remodeling projects", which assesses which risk factors are most likely to occur, and 3) "the level of effect of project characteristics that affects the occurrence of each risk factor." Through this study, the relationship between various characteristics of the office building remodeling projects and the delay risk factors was analyzed in various aspects, in further, it is expected that the owner planning the remodeling will be able to grasp the delay risk that is likely to occur according to the characteristics of the project in advance.

법령과 고시 ① - '고무발포단열재' 공사용 자재 직접구매 품목 제외

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.306
    • /
    • pp.87-93
    • /
    • 2016
  • 중소기업청은 지난 해 12월 30일 '중소기업자간 경쟁제품 지정내역 및 공사용 자재 직접구매 대상품목'을 개정하고 올해 1월 1일부터 3년(2018.12.31)간 적용에 들어갔다. 개정된 공사용 자재 직접구매 대상품목 중 그동안 대한기계설비건설협회(회장 이상일)가 지정 제외를 위해 총력을 기울였던 고무발포단열재가 기존 공사용자재 직접구매 대상품목 중에서 유일하게 제외됐다. 새로 개정된 공사용 자재 직접구매 대상품목은 고무발포단열재, 애자, 공기살균기, 플라스틱포대 등 4개 품목이 빠지고 신규 지정을 신청한 12개 품목 중 8개(커튼, 차양, 볼라드, 잡석, 데이터 포트장치, 디지털영상 정보 안내시스템, 막구조물, 포설형 탄성 포장재)만 채택돼 총 127개 품목으로 확정됐다. 고무발포단열재가 공사용 자재 직접구매 대상품목에서 제외됨으로써 앞으로 기계설비건설업계의 매출 신장과 생산성 향상에 크게 기여할 것으로 기대되고 있다.

  • PDF

Evaluation of Ventilation Performances for Various Combinations of Inlets and Outlets in a Residential Unit through CO2 Tracer-Gas Concentration Decay Method (CO2 추적가스 농도감소법을 이용한 공동주택의 급·배기구 조합에 따른 환기 성능 분석)

  • Sang Yoon Lee;Soo Man Lee;Jong Yeob Kim;Gil Tae Kim;Byung Chang Kwag
    • Land and Housing Review
    • /
    • v.14 no.4
    • /
    • pp.111-120
    • /
    • 2023
  • Indoor air quality has become increasingly important with the increase in time spent in residential environments, impact of external fine dust, yellow dust, and the post-COVID 19 pandemic. Residential mechanical ventilation plays a key role in addressing indoor air quality. The legal standard for residential air changes per hour in Korea is 0.5 ACH. However, there are no standards for the location of supply and return vents. This study atempts to analyze the impact of ventilation performance based on the location of supply and return vents. An experiment was conducted using the CO2 tracer gas concentration decay method in a mock-up house set inside a large chamber to minimize external influences. The experimental results indicated that the commonly used combination of 2 supply and 2 return vents in living room spaces had a lower mean age of air than the combination of 1 supply and 2 return vents. Using multiple supply and return vents had lower mean age of air than using just 1 supply and 1 return vent.

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

A study of the Performance Measurement Based on Lean Construction (린 건설에 기초한 성과측정 방안에 관한 연구)

  • Moon, Hyo-Gi;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.492-495
    • /
    • 2006
  • The performance measurement has been taken with the transformation concept of production, which is considered to be a major cause of existing problems. In order to improving productivity, it is argued that the performance measurement based on Lean Construction is necessary. This study suggests new performance measurement indicators based on work flow ; Reliability, Effectiveness, Efficiency.

  • PDF

A Study on Development and Site selection of an AIRFIELD (경비행장 개발 및 입지선정에 관한 연구)

  • Park, Sang-Yong
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.30 no.2
    • /
    • pp.3-36
    • /
    • 2015
  • As of end of 2014, the population engaging in aviation activities for leisure has reached approximately 13 million, where approximately 356 cases involve a general aircraft, 200 cases involve light aircraft, and 636 cases involve an ULM. The industry for leisure has become a very promising industry in line with rapidly rising living standards which are expected to further increase in the future. The demand for such services is expected to increase over time. The purpose of this paper is to review the development and site selection of airfields in anticipation of these developments in the industry. While the government also has experience in the review of airfield location and candidate sites, it is not the government that carries out the actual construction. As such, the feasibility of the site needs to be verified in terms of actual construction. This study identified factors for Site Selection of factors through a review of related documents and existing research reports. A questionnaire was also used to collect the views of experts in the field, which was then analyzed. The Research model was confirmed in the layered form for an AHP analysis. The factors for Site Selection were identified as the technical / operational factors and economic / political elements for a two-stage configuration. The third step consisted of technical and operational elements. The final step is was constructed a total of 11 elements (weather, surface conditions, obstacle limitation surface, airspace conditions, operating procedures, noise problems, environmental issues, availability of facilities, construction and investment costs, contribution to the local economy, accessibility, demand / the proximity of demand). The surveys are conducted for more than 10 General and light aircraft pilots, professionals, and instructor. The analysis results showed a higher level in the technical / operating elements (73.2%) in the first step, while the next step sawa higher level of the operational elements (30.9%) than the other. The factors for Site Selection were any particular elements did not appear high, the weather conditions (17.5%), noise problems (19.8%), the proximity of demand (6%), accessibility (5.7%), environmental issues (11.1%), availability of facilities (8%), airspace conditions (7.9%), obstacle limitation surface (12%), construction and investment costs (4.2%) and to operating procedures (4.9%), contribution to the local economy (3.8%).

A Study on the Change of Non-Working Days of Incheon Metropolitan through BCP Analysis (BCP분석을 통한 인천지역 작업불능일 변화 연구)

  • Ko, Kyujin;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.4
    • /
    • pp.80-88
    • /
    • 2015
  • In the case of those types of work that are performed outdoor construction work, many non-working days occur due to climatic elements such as low temperature, rainfall, and high wind velocity. In particular, damage incurred construction delays hardly decreases because weather forecasting has become difficult due to global warming. In the present study, time points of drastic changes in annual average temperatures, annual average maximum temperatures, and annual average minimum temperatures were identified through BCP analysis and increasing/decreasing trends of non-working days in summer and winter were compared and analyzed on the basis of the change points. According to the results of the study, annual average temperatures drastically changed in 1988 and 1998. After the two time points, non-working days in summer and winter clearly showed increasing trends and decreasing trends respectively.

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF

A Study on Estimation Model of Construction Duration for Public Construction (공공건설공사 공사기간 산정모델에 관한 연구)

  • Kim, Byeong-Soo;Chun, Jin-Ku
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.142-151
    • /
    • 2005
  • On public constructions, that the first planed projects delay than the scheduled completion day occurrence frequently because gap between the scheduled construction durations and the actual construction durations. These facts connect with not only problems of the construction during as the construction delay but also brought about the distribution costs increase as the failure of facility use plan and the people discomfort weight, failure of the production and the supply using facility then tremendous loss of each part etc. For reduce these loss, it must improve accuracy of the scheduled construction duration estimating when it order. This study try contribute to a successful manage of public project and reduce the construction duration extension frequent of the construction during, and then ensure the suitable construction duration by present the estimation model of the scheduled construction duration that include the construction duration correct element using as an index on the scheduled construction duration estimation.

An Economic Analysis of Steel Framed Modular Housing: Compared with Case of Urban Type Living Housing of Wall-slab (강재 프레임 주택형 모듈러의 경제성 분석: 벽식구조인 도시생활형주택과의 사례비교를 통해)

  • Bang, Jong-Dae;Chun, Chu-Young;Park, Ji-Young;Kim, Jong-Yeob;Kim, Gap-Deug;Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.305-314
    • /
    • 2014
  • The technology-intensive unit modular method of factory production method is attracting attention by the limit of the labor-intensive and field centered wet construction method. In recent years, the unit modular method has been applied to the construction of schoolhouse and BOQ(bachelor offices' quarters), dormitories, etc. But the modular method still is not used in housing construction by the lack of verification of resident performance and construction cost. Therefore, this study analyzed the economics of modular house to vitalize the constructed residential building by modular method and to develop the modular method. According to the study results, the construction cost of the modular house was analysed more about 6.2% expensive than that of the existing housing. However, if the construction duration of modular house is shortened or the productivity of modular house is increased, the construction cost of modular house will be similar to the that of the existing house.