• Title/Summary/Keyword: 개발사업 유형

Search Result 386, Processing Time 0.03 seconds

An Analysis on the Determinants of the Price of Primary CER (CDM 사업배출권의 가격결정요인 분석)

  • Lim, Sung-Soo;Yang, Seung Ryong
    • Environmental and Resource Economics Review
    • /
    • v.17 no.4
    • /
    • pp.691-717
    • /
    • 2008
  • The Kyoto Mechanisms allows a supplementary means for compliance, CDM(Clean Development Mechanism) and JI(Joint Implementation) projects. The investment in CDM projects is increasing rapidly as the first implementation period began in 2008. This paper seeks to determine factors affecting the price of primary CER using UNFCCC CDM Project Development Document(PDD) data. This study employs the Cluster analysis and the GLS(Generalized Least Squares) method.

  • PDF

An Analysis on the Characteristics on Incubator Organization Ventures and Independent Ventures (배태조직 벤처기업과 개인창업 벤처기업의 특성분석)

  • Kim, S.K.;Park, B.S.;Oh, K.S.
    • Electronics and Telecommunications Trends
    • /
    • v.17 no.6 s.78
    • /
    • pp.127-134
    • /
    • 2002
  • 정보통신 연구개발 사업인 우수신기술 지정 ·지원사업에 참여한 벤처기업 중 초기단계 벤처기업 75개사를 대상으로 대기업 및 중소기업으로부터 spin-off한 배태조직 벤처기업과 개인창업 벤처기업으로 분류하여 업종 및 벤처확인 유형별 특성, 재무 및 조직현황 특성, 최고경영자 특성, 기술개발 특성, 해외진출 특성을 분석하여 두 그룹간의 차이점 및 공통점을 파악한 후 향후 벤처기업의 나아갈 방향에 대해 제시해 보았다.

A Study on the Characteristics of Projects Following the Promotion of Private Park Special Projects (민간공원특례사업의 추진에 따른 사업특성에 관한 연구)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.5
    • /
    • pp.112-124
    • /
    • 2021
  • This study was conducted to examine and analyze local governments, park status, project characteristics, and the implementation in detail for private park special projects across the country as a means of responding to the sunsetting of urban parks. As a result of the analysis, first, the private park special project, was found to be mainly implemented in cities with a population of more than 100,000, so there was a limit to the application on military installations or in local small cities. Therefore, rather than applying the special system collectively, it was judged that institutional flexibility, considering the characteristics and size of local government, was needed. Second, the current special projects by the park creation donation collection method shows monotonous development centered on apartment houses, so it is necessary to diversify the development by introducing a park preservation method that purchases and donates park sites. Third, it was found that the area standard needs to be eased to less than 50,000m2 to include parks with high utilization and good accessibility in urban areas of large cities, as the type and area of parks are limited. Fourth, most special projects are mountain parks, which are feared to damage the natural terrain and skyline, so separate ordinances should be established and applied, and development approaches should be made to allow nature and parks to coexist with the setting of detailed building guidelines for each type of facility. The guidelines should include, first, after the nationwide private park special projects are completed, standards for appropriate returns for similar projects should be established, institutional standards such as the recovery of excess profits should be established, and environmental reviews should be conducted. Second, it was found that local governments should institutionalize the composition of private consultations to promote the efficient management of projects through a cooperative system, and third, a roadmap for maintenance after the donation of special parks should be established.

Evaluating Implementation Rate of Wildlife Mitigation Measures in the Environmental Impact Assessment (환경영향평가에서 동물상 영향 저감방안 이행현황 평가 - 도시 및 도로 개발사업을 중심으로 -)

  • Ji-Hoon, Lee;Eun-Sub, Kim;Yong-Won, Mo;Dong-Kun, Lee
    • Journal of Environmental Impact Assessment
    • /
    • v.31 no.6
    • /
    • pp.359-368
    • /
    • 2022
  • It is essential to increase the implementation rate in order to increase the effectiveness of mitigation measures that can mitigate the negative impact of development projects. In the case of Environmental Impact Assessment (EIA),research on the implementation evaluation of development projects is insufficient, even though the effectiveness of mitigation measures has been steadily raised. Therefore, this study evaluated the implementation rate of the mitigation measures and identified the cause of the difference in the implementation rate for each mitigation measures in order to understand the current status of the ecological mitigation measures. The implementation rate of urban and road development projects mitigation measures was 56.0% and 64.4%, respectively. the implementation rate of 'Monitoring' mitigation measures was the highest in all development project. But, 'Habitat creation' and 'Accident prevention measures' were low. In addition, it was found that the implementation rate of the mitigation measures were high when the contents of the mitigation measure described in the report were specific. Through this study, it was found that in order to increase the implementation rate of the EIA ecological environment animal mitigation measures, it is necessary to reflect the environmental and geographical characteristics of the target site in detail. Furthermore, it is judged that this study can be used as a basic basis for enhancing the effectiveness of the EIA system introduced to mitigate the negative impact on the environment.

Statistical Classification of Dam Heightening Reservoirs for Classifying Rural Waterfront Development Type (농촌지역 친수공간의 개발유형 분류를 위한 둑높이기 저수지의 통계적 분류)

  • Jung, In-Kyun;Jung, Kwang-Wook;Kwon, Jin-Wook;Kim, Hae-Do;Lee, Kwang-Ya
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2012.05a
    • /
    • pp.707-707
    • /
    • 2012
  • 현재 농업용저수지 둑 높이기 사업이 전국 110개 저수지를 대상으로 추진되고 있다. 다양한 효과가 기대되고 있는 둑 높이기 사업과 더불어 농업생산기반시설 및 주변지역 활용에 관한 특별법의 시행으로 저수지 등 농업기반시설 및 그 주변지역을 본래의 기능을 유지하는 범위에서 개발할 수 있게 됨에 따라 다양한 시설물의 설치와 운영을 통해 지역의 수익창출이 가능하게 되었다. 그러나 저수지 수변지역으로 개발계획이 집중되어 있고 추가확보 되는 용수는 하천유지와 농업용수 공급에 주로 활용될 계획이므로 추가확보 용수의 보다 다양한 활용방안을 제고하여 더 많은 이익을 창출할 수 있는 방안이 요구되고 있다. 그 중 하나로 둑 하류지역 농경지의 관개배수체계를 정비하여 추가용수 이용의 효율을 향상시키고 농촌마을과 연계하여 친수공간을 조성함으로서 둑하류 농촌마을 주민의 삶의 질 향상과 경제적 이득을 창출할 수 있는 기회를 제공할 수 있을 것이다. 이와 같은 친수공간 개발은 둑높이기 저수지의 추가용수 확보규모 및 지역의 지형, 토지이용, 사회경제적 특성에 따라 달라질 수 있으나 유형화를 통해 대표적 특성에 대한 표준안을 개발 할 수 있을 것이다. 따라서 본 연구에서는 기초연구로서 둑 높이기 저수지의 특성 및 주변 현황자료를 수집하고 통계적인 기법을 이용하여 5개의 둑하류 농촌지역 친수공간 개발유형을 분류하였으며 지역 및 공간적 분포를 제시하였다.

  • PDF

A Study on a Decision Making Model of Prioritization of Supporting Policies for Regional Strategic Industries in Chung-nam (충남지역 전략산업 지원사업의 투자우선순위 결정모형에 관한 연구)

  • Lee, Bo-Hyung;Kyung, Jong-Soo;Suh, Sang-Hyuk
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.9
    • /
    • pp.3196-3203
    • /
    • 2010
  • The regional strategic industry support has been increasingly developed due to the change of environmental and political conditions for the last 10 years. As the paradigm changed from the central government-sponsored system to regional government-sponsored system, the policy has been diversified into various support systems such as regional strategic industry, specialized industry, supporting technology, supporting business, etc. It is crucial to establish the overall development plans and project strategies for the regional industry in terms of effectiveness and efficiency which will generate an integrated strategic frame to adjust overlapped supporting policies and offer a consumer-oriented service. Not only does the study focus on performance-based outcome regarding to a regional business (supporting policy) portfolio, but it also analyzes and proves an empirical decision-making model to draw out the priority and relative importance according to the regional strategic industry and support cases by analyzing the case of Chungnam area's strategic industry support in 2009. Following a priority list of 20 support cases selected from this research model by the Analytic Hierarchy Process (AHP), the result shows that the diverse support plans are needed according to the different strategic industries or the size of enterprise due to the fact that priority of project type varies upon the characteristics of strategic industry. Thus, the support project needs to generate various strategic industries and develop differentiated support policy to consolidate competitiveness of regional enterprises and revitalize the regional economy.

R&D Investment and Project Performance : Research on Industrial R&D Programs of Government (연구개발투자의 성과에 영향을 미치는 요인에 관한 연구 : 정부의 산업기술개발사업을 중심으로)

  • Chang, Keum-Young
    • Journal of Technology Innovation
    • /
    • v.18 no.1
    • /
    • pp.75-98
    • /
    • 2010
  • The purpose of this paper is to give policy implications for relevant policy-makers by analyzing factors affecting performance of industrial R&D programs of the Ministry of Knowledge Economy. The independent variables are type of project leader organization(Big Enterprises, SMEs, Ventures Businesses, Public Research Institutions, Universities), cooperative or noncooperative R&D among industry-university-research institution, total number of project participant organization, total R&D investment, and the ratio of private investment to total R&D investment. The dependent variables are domestic or foreign patents granted and domestic or foreign papers accepted. The method of analysis is Poisson Regression analysis operated by STATA. The results of this research are follows ; Universities show higher R&D performance compared to enterprises or public research institutions in terms of patents and papers as well. Venture businesses show higher patent performance compared to SMEs. Inverted U-shaped relationship between total number of project participant organization and R&D performance is not supported. The higher total R&D investment, the higher R&D performance. The higher the ratio of private investment to total R&D investment, the higher R&D performance.

  • PDF

Classification and Analysis of the Project Contents and Expected Effects of Urban Regeneration Pilot Projects (도시재생 선도지역의 사업내용 및 기대효과 유형 분류 및 분석 -근린재생형 도시재생 선도지역 마중물 사업을 대상으로-)

  • Bae, Min-Kyung;Park, Seung-Hoon
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.10
    • /
    • pp.527-544
    • /
    • 2018
  • Urban regeneration is a project to enhance the competitiveness. Therefore, it is necessary to examine the contents and expected effects of urban regeneration projects. In this study, we classified and analyzed the contents and expected effects of the 11 neighborhood urban regeneration pilot projects. The main results are as follows; First, physical regeneration is the most popular in terms of project contents, and social approach is the most typical for the expected effects. Second, the project of social regeneration is mainly focused on strengthening the capacity of residents. Third, the most expected effect of physical regeneration was about the improvement of landscape. Fourth, the most expected effect of social regeneration was the contents of residents' participation. Finally, there is a need for the development of projects that can expect a combination effects rather than a single effect. The urban regeneration new deal projects need to pay more attention to projects that can have various effects based on the development of competitive urban contents.

Development of Work Breakdown Structure Basis for Mega-Project (메가프로젝트를 위한 업무분류체계기준(WBS Basis) 개발)

  • Lee, Hei-Duck;Seo, Yonng-Chil;Lee, Seung-Hoon;Woo, Yu-Mi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.441-444
    • /
    • 2008
  • 메가프로젝트(Mega-Project)는 다양한 유형의 시설군을 복합 개발하는 건설사업으로서 규모가 크고 복잡한 경우가 많기 때문에 종합적인 사업관리에 어려움이 따른다. 따라서 메가프로젝트는 기존의 단위프로젝트 수준이 아닌 프로그램 수준에서의 관리체계를 필요로 하며 그에 적합한 업무분류체계(WBS)를 구축해야 한다. 업무분류체계는 사업관리를 위한 전체적인 구조를 수립하는 기반으로서, 현재 프로그램 관리 수준의 업무분류체계의 기준이 갖추어지지 않은 상황이다. 이에 본 연구에서는 메가프로젝트를 위한 업무분류체계기준(WBS Basis)를 개발하여 메가프로젝트의 업무분류체계 구축을 지원하고자 한다. 메가프로젝트 생애주기에 포함되는 전체 시설군, 업무 및 용역, 기록문서, 정보 등을 대상으로 하였으며, 기존 사례분석과 관련 분류체계들을 바탕으로 초안을 작성하였다. 이후 현장시험을 통한 검증을 거쳐 최종 업무분류체계기준을 완성하였고 분류내용과 활용방안을 소개한다.

  • PDF

A Study on the Way to Construction of Integrated Urban Management Center by City Types -Focused on the Development types of City- (도시유형별 도시통합운영센터 구축방안 연구 - 신도시/기존도시 개발유형을 중심으로 -)

  • Lee, Hyo-Chang;You, Jin-Soo
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.11a
    • /
    • pp.424-429
    • /
    • 2009
  • 2009년 현재 기완료된 바 있는 화성 동탄 신도시를 시작으로 국내 12개의 u-city가 건설 추진 중에 있다. 또한 39개의 지구가 추진예정 중에 있으며 더욱 많은 지자체들이 u-city사업에 관심을 가지고 있다. 이렇듯 지대한 관심을 받고 있는 u-city의 구성요소 중 핵심이라 할 수 있는 도시통합운영센터는 도시정보를 효율적으로 취합하고 정보서비스를 제공하는 요소라 할 수 있으며, 그 구축방안에 대한 연구들이 활발히 이루어지고 있다. 하지만 도시의 여러 특성에 따라 적합한 센터의 구축방안에 대한 연구는 거의 이루어지고 있지 않은 실정이다. 특히 도시개발 유형과 관련하여 신도시를 건설하면서 u-city를 구축하는 경우 도시의 기반시설물 구축과 함께 u-city시설물 구축이 동시에 가능하지만 기존 도시의 경우 이미 구축되어 있는 도시기반 시설물에 u-city구축을 위한 시설물과 관련 기술을 적용해야 하는 차이점이 있다. 따라서 이러한 차이로 인해 각 유형의 도시통합운영센터 구축 방안에도 차이가 있을 수밖에 없다. 이에 이 연구에서는 우선 여러 가지 도시특성 중 개발 유형에 따라 도시의 유형을 구분하고 이를 중심으로 도시통합운영센터의 구축 시 고려해야할 점에 대해 살펴본다.

  • PDF