• Title/Summary/Keyword: , AHP 분석

Search Result 1,881, Processing Time 0.023 seconds

A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project (확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구)

  • Jung Pyung-Ki;Seo Jong-Won;Lim Jong-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.181-193
    • /
    • 2004
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a probabilistic life cycle cost analysis (PLCCA) model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented probabilistic life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment (공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델)

  • Jung, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

  • PDF

Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase (공동주택의 설계VE단계에서 주체별 요구항목 분석을 통한 대상선정 개선방안)

  • Jeong, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.111-119
    • /
    • 2008
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

A Study on the Consciousness of Maintenance Work of Small-scale Apartment Owners (소규모 공동주택 소유자의 유지관리 업무에 대한 의식구조 분석)

  • Cha, Chang Jin;Yoon, Hyo Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.647-656
    • /
    • 2019
  • This paper aims to analyze the priority of elements in building management system surveying owners living in Small-scale Apartment, and to suggest basic data for establishing effective management alternatives. To achieve the goal, this paper extracted the elements from a guideline supported by the Ministry of Land, Infrastructure and Transport in Korea, and tried to analyze their priority. The result as follows. First, the analysis of the first level suggested that people give priority to facility management, moving management, security management and administrative for management. Second, on the analysis of the second level, settlement of budget was the most important for the administrative, cleaning for facility management, parking management for security management and advertisement of the administrative for moving management. By suggesting the result, this paper concludes that it would be very important to establish a regional management corporation to manage the Small-scale Apartment.

Establishment and Application of Landscape Control Point Selection Method for Landscape Assessment of Urban Development Projects (도시개발사업의 경관평가를 위한 조망점 선정체계 구축 및 적용)

  • Jang, Cheol-Kyu;Jung, Sung-Gwan;Kim, Kyung-Tae
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.3
    • /
    • pp.39-50
    • /
    • 2011
  • This study furnishes basis data for plan foundation and proper valuation of view by presenting objective and concrete selection standards and ways of Landscape Control Point(LCP) on valuation of development projects. To sum up the results of study, it establishes the prospect, publicity and direction of view as a selection standard LCP on precedent studies. The prospect, which includes visual range, direction of view, geographical features, and visibility, sets up as a valuation basis picking out the available places which have alterations according to direction and distance in practice. In the case of publicity, to select the place as there presentative area where public activities often happen than others, thirteen evaluation indexes including administration facilities, educational facilities, commercial facilities and so on. And variation of landscape is set up as an assessment index to know how much the land has changed from the beginning to the end of development. To apply the selection standards to sample places, the preliminary LCP is founded by analyzing both the prospect and published; a series of courses for selecting the final LCP is founded by analyzing the preliminary LCP and variableness of landscape on a basic of placed which have many alterations of view. At last, in the case of a selection system for LCP, the preliminary LCP is founded by analyzing both the prospect and publicity; a series of courses for selecting the final LCP is found by analyzing the preliminary LCP and variableness of landscape. Applying selection standards and the assessment index to the Sam-deok 3 residence improvement area, in the case of prospect, the southern distant view area has the largest extent. Next, the results of the assessment using the system of publicity show that a five-lane road is taking up the largest area. Hence, a total of 48 preliminary LCPs are set up by analyzing both the prospect and publicity. The results of analyzing landscape variation, one of the valuation indexes, show that Sam-deok dong around the post office has the highest rate of variation at 28.07%. Finally, three LCPs in each part, which are close range, middle range and distance view, are selected; thus, a total of nine LCPs are selected. The selected LCPs that go through a series of practical courses like a GIS program have a lot of professional opinions and are expected to secure objectivity of landscape assessment.

Efficiency Analysis of Listed Display Companies Using a Hybrid AHP and DEA Model (하이브리드 ANP와 DEA 모델을 이용한 상장 디스플레이 기업의 효율성 분석)

  • Seo, Kwang-Kyu
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.11
    • /
    • pp.295-302
    • /
    • 2012
  • The display industry plays an important role in the entire Korean economy. Few empirical research has analyzed the efficiency of display companies although it is necessary to measure the management efficiency for more efficient operation and more strengthening competitiveness of them. The purpose of this paper is to measure and analyze their efficiency of the Korean listed display companies using a hybrid ANP and DEA model. In this paper, we analyzed the 44 listed companies consisted of 7 listed on KOSPI and 37 listed on KOSDAQ at the end of 2010. In order to determine the input and output variables of DEA, the ANP model was applied to evaluate the importance of input and output variables. The benchmarking companies and efficiency value for the display firms with inefficiency were also provided to improve the their efficiency.

A Study on the Pre-feasibility study on the Cadastral Resurvey Project (지적재조사사업 예비타당성분석의 타당성 검토 - 경제성 분석을 중심으로 -)

  • Shin, Ji-Yoon;Kwak, Byung-Yong;Kim, Chang-Kee
    • Journal of Cadastre & Land InformatiX
    • /
    • v.44 no.1
    • /
    • pp.61-78
    • /
    • 2014
  • The Cadastral Resurvey Project received 'Ineligible' determination by the first Pre-feasibility study in 2010. This is a result of the AHP analysis based on the policy and the economy validity. Especially, economic validity test uses mainly the Benefit-Cost Analysis. B-C Analysis has enclosed the limit to estimate the benefit which have the external effect. This study concentrated on the limit of the estimation the benefit on the Pre-feasibility study.

A Study on the Investigation into Obstacles in Construction Budget Estimating (건설기업 실행예산 편성업무의 애로요인 분석에 관한 연구)

  • Koo, Kyo Youn;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.81-89
    • /
    • 2016
  • Under the circumstances where the profitability has become a more critical issue for general contractors, the objective of the study is to identify and discuss obstacles and their key characteristics in the construction budget estimating. Through the questionnaire survey and interviews with experienced estimators of general contractors, the study identified 18 obstacles by 6 groups. It discussed that although various obstacles exist, there are key obstacles to which general contractors should pay attention for the realistic construction budget estimating. In particular, improving subcontractors' estimating competency and incubating estimating experts are identified as the key issues to overcome obstacles in the construction budget estimating.

Analysis of Conceptual Models and State-of-the-Art Technologies for the Automation of Telescoping Work in Horizontal Tower Cranes (수평형 타워크레인 텔레스코핑 작업의 자동화를 위한 개념 모델 및 요소기술 분석)

  • Lee, Sang-Ho;Kim, Young-Suk;Lee, Jeong-Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.705-717
    • /
    • 2011
  • The number of horizontal tower cranes, major hoisting machineries for lifting approximately 50% of entire materials in construction projects, is rapidly increasing, but a number of accidents related to the tower cranes are being continuously occurred in construction sites as well. In particular, telescoping works in the horizontal tower cranes have showed the greatest safety concerns such as falls and collapses. It is due to the fact that tasks inserting a new mast in the space made after raising telescoping cage by fluid pressure and ascending it to the required height in the telescoping works include a series of dangerous factors in safety aspects, and might cause very serious and unexpected accidents in construction sites. The primary objective of this research is to propose two conceptual models for automating the telescoping work in horizontal tower crane and conduct their technical feasibility analyses. In this study, a design concept, a position control system using hydraulic cylinders is suggested as a better alternative for automating the telescoping work. Its potential safety improvement rate compared to the conventional method is also analyzed and presented in this study.

Development of Standard Systems through Analysis of Business Process the Risk Factors for the Korean Construction Management Firms (국내 CM기업의 리스크 인자별 관리 업무 프로세스 분석을 통한 표준업무체계 개발)

  • Park, Kyungmo;Kim, Changduk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.73-83
    • /
    • 2015
  • Construction management firms in Korea have mainly focused on the key management areas of time, cost, quality and safety management in line with a rapid change of construction industry recently. However, a risk management is considered comparatively less important found from our research on an investment by the firms for training, system establishment. This has been identified that the construction management firms have taken an approach of dealing with risks with their experience, insight rather than managing risks with a systemized principles or proper tools. Therefore, the current system for risk management was identified by analyzing risk factors and work process in this research and systemized process for risk management of the identified risk factors was suggested. This research is expected to be a basis on establishing standard gudiance for risk management and risk management tools.