The main idea of this study is to propose a BIM-based automation system drawing up a report of energy conservation plan in the architecture division. In order to obtain a building permit, an energy conservation plan must be prepared for buildings with a total floor area of 500m2 or more under the current law. Currently, it is adopted as a general method to complete a report by obtaining data and drawings necessary for an energy conservation plan through manual work and input them directly into the verification system. This method takes a lot of effort and time in the design phase which ultimately increases the initial cost of the business, including the services of companies specialized in the environmental field. However, in preparation for mandatory BIM work process in the future, it is necessary to introduce BIM-based automatic creation system that has an advantage for shortening the whole process to enable rapid permission of energy-saving designs for buildings. There may be many methods of automation, but this study introduces how to build an application using Dynamo of Revit, in terms of utilizing BIM, and write an energy conservation plan by automatic completion of report through Dynamo and Excel's VBA algorithm, which can save time and cost in preparing the report of energy conservation plan compared with the manual process. Also we have insisted that the digital transformation of architectural process is a necessary for an efficient use of our automation system in the current energy conservation plan workflow.