DOI QR코드

DOI QR Code

Toward Quality Control in Precast Concrete Methods : Development and Validation of Inspection Management System

Precast Concrete 품질관리를 위한 검사 관리 시스템 개발 및 검증

  • Moon, Jae Sang (Dept. of Civil Engineering, Kumoh National Institute of Technology) ;
  • Seo, Wonseok (Dept. of Architecture, Ajou University) ;
  • Kim, Jinyoung (Dept. of Architecture, Ajou University)
  • 문재상 (국립금오공과대학교 토목공학과) ;
  • 서원석 (아주대학교 건축학과) ;
  • 김진영 (아주대학교 건축학과)
  • Received : 2023.10.04
  • Accepted : 2024.02.02
  • Published : 2024.02.29

Abstract

The precast concrete (PC) method involves manufacturing components at the factory and assembling them on-site. Effective application of the PC method requires proper quality management of manufactured PC components. Currently, many PC factories conduct inspections on selected PC components and generate paper-based inspection reports due to time and cost constraints. To enhance both the quality and quantity of inspections without increasing time, this study proposed a quality control system that automatically records data and generates inspection reports for PC components. The system includes recording inspection results based on component specifications, storing comprehensive inspection data, and automatically constructing digital inspection reports. The developed system was tested in a PC factory to validate its efficiency. Additionally, a survey was conducted to enhance the system's usability in the field, and the system was updated based on the survey findings.

Keywords

Acknowledgement

본 연구는 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음(과제번호 RS-2020-KA158109)

References

  1. Ballard, G., Harper, N., & Zabelle, T. (2003). Learning to See Work Flow: An Application of Lean Concepts to Precast Concrete Fabrication, Engineering, Construction and Architectural Management, 10(1), 6-14.  https://doi.org/10.1108/09699980310466505
  2. Bangor, A., Kortum, P. T., & Miller, J. T. (2008). An empirical evaluation of the system usability scale. Intl. Journal of Human-Computer Interaction, 24(6): 574-594.  https://doi.org/10.1080/10447310802205776
  3. Hajdukiewicz, M., Goggins, J., de la Torre, O., Holleran, D., & Keane, M. M. (2019). An Automated Standard-Based Life Cycle Quality Inspection Methodology for Smart Precast Concrete Solutions in Buildings," Journal of Structural Integrity and Maintenance, 4(3), 123-134.  https://doi.org/10.1080/24705314.2019.1627454
  4. International Labour Organization (2023). Global Wage Report 2022-23: The Impact of Inflation and COVID-19 on wages and purchasing power. 
  5. Jaillon, L., Poon, C. S., & Chiang, Y. H. (2009). Quantifying the Waste Reduction Potential of Using Prefabrication in Building Construction in Hong Kong. Waste Management, 29(1), 309-320.  https://doi.org/10.1016/j.wasman.2008.02.015
  6. Jiang, R., Mao, C., Hou, L., Wu, C., & Tan, J. (2018). A Swot Analysis for Promoting Off-Site Construction under the Backdrop of China's New Urbanisation. Journal of Cleaner Production, 173, 225-234.  https://doi.org/10.1016/j.jclepro.2017.06.147
  7. Juliani, A., Berges, V. P., Teng, E., Cohen, A., Harper, J., Elion, C., Goy, C., Gao, Y., Henry, H., Mattar, M., & Lange, D. (2018). Unity: A general platform for intelligent agents. arXiv preprint arXiv:1809.02627. 
  8. KCS 14 20 52 (2021). Precast Concrete, Korea Construction Standards Center. 
  9. Kim, M. K., Cheng, J. C., Sohn, H., & Chang, C. C. (2015). A Framework for Dimensional and Surface Quality Assessment of Precast Concrete Elements Using Bim and 3D Laser Scanning, Automation in Construction, 49, 225-238.  https://doi.org/10.1016/j.autcon.2014.07.010
  10. Lee, S., Kwon, S., Jeong, M., Hasan, S., & Kim, A. (2020). Automated on-Site Quality Inspection and Reporting Technology for Off-Site Construction (Osc)-Based Precast Concrete Members. International Symposium on Automation and Robotics in Construction (ISARC), 1152-1159. 
  11. Lewis, J. R., & Sauro, J. (2009). The factor structure of the system usability scale. In Human Centered Design: First International Conference, HCD 2009, Held as Part of HCI International 2009, San Diego, CA, USA, July 19-24, 2009 Proceedings 1 (pp. 94-103). Springer Berlin Heidelberg. 
  12. Lewis, J. R. (2018). The system usability scale: past, present, and future, International Journal of Human-Computer Interaction, 34(7): 577-590.  https://doi.org/10.1080/10447318.2018.1455307
  13. Moroney, L. (2017). Cloud storage for firebase. The definitive guide to firebase: build android apps on google's mobile platform, 73-92. 
  14. National Precast Concrete Association (2022). Quality Control Manual for Precast Concrete Plants. 
  15. PCI MNL-116-99 (1999). Manual for Quality Control for Plants and Production of Structural Precast Concrete Products, Precast / Prestressed Concrete Institute.
  16. Reichenbach, S. & Kromoser, B. (2021) State of Practice of Automation in Precast Concrete Production, Journal of Building Engineering, 43. 
  17. Sacks, R., Eastman, C. M., & Lee, G. (2004). Process Model Perspectives on Management and Engineering Procedures in the Precast/Prestressed Concrete Industry. Journal of Construction Engineering and Management, 130(2), 206-215.  https://doi.org/10.1061/(ASCE)0733-9364(2004)130:2(206)
  18. Shayanfar, M. A., Mahyar, P., Jafari, A., & Mohtadinia, M. (2017). Classification of Precast Concrete Segments Damages During Production and Transportation in Mechanized Shield Tunnels of Iran, Civil Engineering Journal, 3(6), 412-426.  https://doi.org/10.28991/cej-2017-00000101
  19. Wang, Q., Cheng, J. C., & Sohn, H. (2017). Automated Estimation of Reinforced Precast Concrete Rebar Positions Using Colored Laser Scan Data, Computer-Aided Civil and Infrastructure Engineering, 32(9), 787-802.  https://doi.org/10.1111/mice.12293
  20. Wang, Z., Hu, H., & Gong, J. (2018). Framework for Modeling Operational Uncertainty to Optimize Offsite Production Scheduling of Precast Components, Automation in Construction, 86, 69-80.  https://doi.org/10.1016/j.autcon.2017.10.026
  21. Wang, Z., Wang, T., Hu, H., Gong, J., Ren, X., & Xiao, Q. (2020). Blockchain-Based Framework for Improving Supply Chain Traceability and Information Sharing in Precast Construction. Automation in Construction, 111.