Critical Impact Factors Affecting the Performance of Domestic Construction Projects through Megatrend Analysis

거시 환경 분석을 통한 국내 건설 프로젝트 성과의 주요 영향지표 도출

  • Lim, Hyunsu (Department of Architecture, Soonchunhyang University) ;
  • Seo, Junghoon (Graduate School, School of Civil, Environmental and Architectural Engineering, Korea University) ;
  • Yoo, Wi Sung (Department of Construction Economic & Finance Research, Construction & Economy Research Institute of Korea) ;
  • Kim, Chang-Won (Team of Research for Public Construction Contract System, Korea Institute of Procurement)
  • Received : 2022.03.14
  • Accepted : 2022.03.30
  • Published : 2022.04.20

Abstract

Changes in megatrends occurring within the spatial range of the production process can be critical factors that affect the performance of unit projects in construction industry, one of the representative order industries. Although changes in the megatrend are a prerequisite for successful performance achievement, previous studies suggested methods for performance measurement and management within the production process as major results. Accordingly, this study analyzed the megatrend related to domestic construction projects and presented critical impact factors(CIFs) that can be affect a project's performance. CIFs were set by combining keywords derived by reviewing major contents of related laws and policies and future strategy reports, and the importance of each indicator was quantitatively analyzed using analytic hierarchy process(AHP). It is expected that the findings of this study can provide meaningful basic data that the various stakeholders in a construction project can refer to when establishing the strategies to achieve successful performance.

생산 과정이 이루어지는 공간적 범위 내에서 발생하는 거시환경 변화는 대표적인 수주산업의 하나인 건설산업의 단위 프로젝트 성과에 직접적인 영향을 미칠 수 있는 요인이 될 수 있다. 이와 같은 거시환경 변화는 성공적인 사업 성과 달성을 위한 전제조건임에도 불구하고, 선행 연구는 생산과정 내에서의 성과관리를 위한 방안들을 주요 결과로 제시하고 있다. 이에 본 연구는 국내 건설 프로젝트를 대상으로 거시적 측면에서의 환경 변화를 분석하여 성과에 영향을 미칠 수 있는 지표 도출을 제안하였다. 주요 영향지표는 관련 법령 및 정책, 미래전략보고서 등의 주요 분석 내용을 기초로 도출된 중점 키워드를 조합하여 설정하였으며, 지표별 중요도는 계층적 의사결정기법을 통해 정량적으로 검토하였다. 본 연구의 결과는 건설 프로젝트의 다양한 이해관계자들이 성공적인 성과 달성을 위한 전략 수립 시 참고할 수 있는 유의미한 기초자료로서 활용이 가능할 것으로 예상된다.

Keywords

Acknowledgement

This work is supported by the National Research Foundation of Korea(NRF) grant funded by the Ministry of Science and ICT(MSIT)(N0. NRF-2020R1F1A1070268) and by research fund from Soonchunhyang University.

References

  1. Choi EG. Construction Issue Focus: Response trends and future tasks of construction companies after implementation of the statutory working-hours reduction [Internet]. Seoul (Korea): Construction & Economy Research Institute of Korea; 2018 Nov 13. Available from: http://www.cerik.re.kr/report/issue/detail/2186.
  2. Bekr GA. Factors affecting performance of construction projects in unstable political and economic situations. ARPN Journal of Engineering and Applied Sciences. 2017 Oct;12(19):5384-95.
  3. Irfan M, Khalid RA, Khel SSUHK, Maqsoom A, Sherani IK. Impact of work-life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management. 2021 Jul(accetped). https://doi.org/10.1108/ECAM-04-2021-0316.
  4. Cha HS, Kim TK. Developing measurement system for key performance indicators on building construction projects. Korean Journal of Construction Engineering and Management. 2008 Jan;9(4):120-30.
  5. Lee DH, Kim SH, Kwon GD, Kim MK, Kim S. The management evaluation key performance indicators of Korean construction firms. Journal of the Korea Institute of Building Construction. 2011 Feb;11(1):35-44. https://doi.org/10.5345/JKIC.2011.02.1.035
  6. Jeon MY, Yu JH. A model for developing composite indicators for construction project performance evaluation. Journal of the Architectural Institute of Korea Structure & Construction. 2012 Jul;28(7):81-90. https://doi.org/10.5659/JAIK_SC.2012.28.7.81
  7. Lee KW, Hong HU, Park HD, Han SH. Developing a program performance management framework for mixed-use development in urban regeneration projects. Korean Journal of Construction Engineering and Management. 2011 Jan;12(1): 141-52. https://doi.org/10.6106/KJCEM.2011.12.1.141
  8. Cha HS, Kim KH. Development of construction project performance management system(PPMS) considering project characteristics. Korean Journal of Construction Engineering and Management. 2013 Jan;14(1):82-90. https://doi.org/10.6106/KJCEM.2013.14.1.082
  9. Lee YS. A Survey of DEA Applications in measuring the efficiency performance of construction organizations. Korean Journal of Construction Engineering and Management. 2014 Sep;15(5):103-14. https://doi.org/10.6106/KJCEM.2014.15.5.103
  10. Kim CW, Kim TH, Yoo WS, Cho HH, Kang KI. Optimized growth curve for estimating performance measurement baseline depended on domestic construction facility type. KSCE Journal of Civil Engineering. 2018;22(8):2691-701. https://doi.org/10.1007/s12205-017-0180-2
  11. Kim CW, Yoo WS, Lim H, Yu I, Cho H, Kang KI. Early-warning performance monitoring system (EPMS) using the business information of a project. International Journal of Project Management. 2018 Jul;36(5):760-43. https://doi.org/10.1016/j.ijproman.2018.03.010
  12. Jang DH, Cho SK. Is the mid-point of a likert-type scale necessary?: comparison between the scales with or without the mid-point. Survey Research. 2017 Nov;18(4):1-24. http://dx.doi.org/10.20997/SR.18.4.1
  13. Ministry of Economy and Finance. National Finance Act [Internet]. Sejong (Korea): Ministry of Economy and Finance; 2020 Jan 09. Available from: https://www.law.go.kr/%EB%B2%95%EB%A0%B9/%EA%B5%AD%EA%B0%80%EC%9E%AC%EC%A0%95%EB%B2%95
  14. Naisbitt J. Megatrends. 1st ed. New York: Warner Books; 1982. 290 p.
  15. Park JH. Read trends through the eyes of a micro [Internet]. Seoul (Korea): LG Business Insight. LG Business Research. 2009 Aug. Available from: http://www.lgbr.co.kr/uploadFiles/ko/pdf/man/LGBI1055-02_20090824090734.pdf
  16. Ministry of Culture, Sports and Tourism. Briefing of Korea Policy [Internet]. Sejong (Korea). Available from: https://www.korea.kr
  17. Ministry of Government Legislation. The Korean Law Information Center [Internet]. Sejong (Korea). Available from: https://www.law.go.kr
  18. POSCO Engineering & Construction(E&C). 2020 Corporate citizenship report [Internet]. Pohang (Korea): POSCO E&C. 2021 Jul. Available from: https://www.poscoenc.com:446/ko/esg/report.aspx
  19. Kim CW, Yoo WS. Current state and future valuation of big data technology in building industry. Building Construction. 2021 Mar;21(1):29-36.
  20. Kim CW, Oh SW, Seo J, Hong Y. A study for the improvement on the use and transparency of the occupational safety and health expenses in construction [Internet]. Ulsan (Korea): Research Report of Occupational Safety and Health Research Institute(OSHRI). 2022 Feb. Available from: https://www.kosha.or.kr/oshri/publication/researchReportSearch.do?mode=view&articleNo=427917&article.offset=30&articleLimit=10