CRITICAL SUCCESS FACTORS FOR PROJECT SUCCESS OF CONSTRUCTION PROJECTS BASED ON DIFFERENT PROJECT OBJECTIVES

  • Hamimah Adnan;Faridah Yusuf;Mohd Arphian Salleh
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.611-624
    • /
    • 2007
  • Every construction project expects a success. In order to attain success for every project involved, issues that are related to the success of a construction project must be identified. This paper identifies those key factors, which contribute to the success of construction projects. The main factors crucial to project success were identified from a literature review and through a questionnaire survey administered to local contractors. A follow-up interview was conducted to validate the first survey and to evaluate the perception of the local contractors. An Analytical Hierarchy Model was used to obtain the final Critical Success Factors. The identification of the critical factors related to the success of construction projects will contribute to the achievement of a particular objective which will accomplish the success of the project. Aspects that affect the success of the project are the project characteristic, contractual arrangement, parties involved in a construction project and finally, and the aspect of the project interactive processes.

  • PDF

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

A FRAMEWORK FOR ACTIVITY-BASED CONSTRUCTION MANAGEMENT SIMILATION

  • Boong Yeol Ryoo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.732-737
    • /
    • 2009
  • Due to various project delivery methods and the complexity of construction projects in the construction industry, developing the framework of construction management for critical, highly complex projects in the construction industry has become problematic. Currently, a set of construction manuals play a pivotal role in planning and managing construction projects as subcontractors try to complete their scope of work according to the instructions of a general contractor. It is challenging for general contractors to write a construction management procedure manual to cover various types of project delivery methods and construction projects. In construction, the construction procedure manuals describe specific actions to be taken through the project. In reality a few contactors own such manuals and their construction schedules include more construction operation activities. Thus, it is hard to estimate the workload and productivity of construction managers because the manual and the schedule do not present the amount of management efforts required to complete a project. This paper proposes a framework to present construction management tasks according to project delivery methods which can be applied to various construction projects. Actions for management tasks were mapped and were integrated with construction activities throughout the project life cycle. The framework can then be used to give specific instructions to project participants, collect management actions, and replicate management actions throughout the project life cycle. The framework can also be can used to visualize complete construction project to analyze and manage construction management activities in each phase of a project in order to enhance productivity and efficiency. The studies of existing construction manuals were carried out to identify construction managers' responsibilities. An artificial intelligence program, CLIPS (C-Language Integrated Production System) was used to search for appropriate actions for impending tasks from a set of predefined actions to be performed for a given situation. The framework would significantly help construction managers to understand interrelations among management tasks or actions within a project. Furthermore, the framework can be embedded into Building Information Modeling (BIM) or Facility Management Systems (FMS) so that designers and constructors would execute constructability review before construction begins.

  • PDF

Analysis of the Changes in the Perceived Important Capabilities of Construction Project Managers after the Global Financial Crisis

  • Lee, Na-Kyung;Bae, Ju-Lee;Jang, Hyoun-Seung
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권3호
    • /
    • pp.8-16
    • /
    • 2012
  • After the 2008 global financial crisis, the construction environment in South Korea continued change in the construction environment. Construction orders in 2011 have shown a downward trend compared with the previous year. Along with these changes in the construction market, the professional capabilities of construction project managers that are perceived as important also changed after the global financial crisis. Accordingly, this study was conducted to identify the major business capabilities of the current construction project managers and to determine which of these capabilities have undergone changes in terms of the importance accorded to them after the global financial crisis, and ultimately, to derive the construction project manager capability areas that need to be strengthened according to the changes in the construction environment. The capabilities of construction project managers were surveyed at two different time points: in 2007 and in 2010. The results show that the year 2010, after the global financial crisis, an increase in the perceived important capabilities of construction project managers compared with 2007. This results the impact of the changes in the construction environment on the importance of construction project managers. This study derived the ramifications of the early identification of systems and prospects according to the changes in the construction circumstances on more efficient onsite and human resources management, by considering the appropriate capabilities of the construction project managers.

건설사업 수행성과평가에 대한 분석 고도화 연구 (A Study on Advanced Analysis of Construction Project Performance Evaluation)

  • 김경훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2023
  • The performance of the construction project is to be evaluated within 60 days of completion, according to relevant laws. It evaluates cost, construction period, design change, re-construction, safety, etc. for each project stage. And the project owners are inputting the evaluation results of the construction work into the construction project information system(CALS). The post-evaluation result information entered in this way can be referred to in the basic design of the construction project by referring to the related contents if there is a similar construction in the future. And It can also be used to predict and respond to the required period and cost by analyzing the accumulated data. In this study, in order to provide reference data that can be used in similar projects in the future, the latest analysis methods are reviewed and the possibility of future application is considered. Accordingly, this study intends to focus on the construction cost part among the indicators such as construction cost, construction period, design change, and re-construction that are currently being dealt with in post evaluation.

  • PDF

A Multilevel Project-Oriented Risk-Mining Framework for Overseas Construction Projects

  • Son, JeongWook;Lee, JeeHee;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.39-40
    • /
    • 2015
  • As international construction market increases, the importance of risk management in international construction project is emphasized. Unfortunately, current risk management practice does not sufficiently deal with project risks. Although a lot of risk analysis techniques have been introduced, most of them focus on project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to manage and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

Selecting Optimum Management Practicesin Pre-construction Phase Considering Project Characteristics

  • Cha, Hee-Sung;Kim, Ki-Hyun;Ko, Young-Jin
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권1호
    • /
    • pp.1-4
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

THE INFLUENCE OF THE PROJECT MANAGER ON THE SUCCESS OF THE CONSTRUCTION PROJECTS

  • Mahdi M Abdulsamad Ali;Nicholas Chileshe
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.345-353
    • /
    • 2009
  • The success and failure of any project depends upon many factors, the Project Manager is considered to be the key contributor to the success of any project, as well as a guide to the team members to achieve the client satisfaction (Cost, Time and Quality). Therefore the main aim of this paper is to provide a practical approach for understanding the importance of the Project Manager and his effectiveness to the success of the construction projects. In addition, the Project Manager's roles, responsibilities and duties have direct impact to the success of the construction projects. In order to identify the thoughts and opinion of the construction industry on this particular assertion, a quantitative study was carried out within the UK construction industry. The result of the study shows that there is an extremely strong correlation between the Project Manager and the success of the construction projects. In construction projects the Project Manager is considered to be one of the most important people who can lead and drive the projects in the right direction and conclude construction projects successfully. Moreover, these can play the most important role regarding the improvement of the organization's performance, the organization's profitability and the client's satisfaction. The research confirmed that the Project Manager is a very essential element to the success of the construction project and have an impact at every stage of the construction project. So it concluded that selection of a Project Manager should be carefully done with regard to experience, knowledge, power/authority and good understanding to the kind of the project.

  • PDF

A View from the Bottom: Project-Oriented Risk Mining Approach for Overseas Construction Projects

  • Lee, JeeHee;Son, JeongWook;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.97-100
    • /
    • 2015
  • Analysis of construction tender documents in overseas projects is a very important issue from a risk management point of view. Unfortunately, majority of construction firms are biased by winning contracts without in-depth analysis of tender documents. As a result, many contractors have incurred loss in overseas projects. Although a lot of risk analysis techniques have been introduced, most of them focus project's external unexpected risks such as country conditions and owner's financial standing. However, because those external risks are difficult to control and take preemptive action, we need to concentrate on project inherent risks. Based on this premise, this paper proposes a project-oriented risk mining approach which could detect and extract project risk factors automatically before they are materialized and assess them. This study presents a methodology regarding how to extract potential risks which exist in owner's project requirements and project tender documents using state of the art data analysis method such as text mining, data mining, and information visualization. The project-oriented risk mining approach is expected to effectively reflect project characteristics to the project risk management and could provide construction firms with valuable business intelligence.

  • PDF

NEW TREND OF SCHEDULING IN LINEAR CONSTRUCTION PROJECT

  • S. Sankar;J. Senthil
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.917-923
    • /
    • 2005
  • Scheduling is one of the main functions in construction project to determine the sequence of activities necessary to complete a project. The scheduling techniques provide important information crucial to a project's success. Highway construction project the paving activity can be considered a linear activity. Linear scheduling technique may be better suited for linear projects than other scheduling techniques. A new type of scheduling in linear project is calling Linear Scheduling Model (LSM). The Project monitoring and controlling is very ease to identify that all the stage of linear project and have more advantages.

  • PDF