Abstract
It was designed as the mechanical excavation mass method on 176m because the safety thing is located around the site. But low-vibration blasting using an electronic detonator was proposed to improve constructability and economy. As a result of the suggestion blasting, both blasting noise and vibration were safe within the allowable limit, confirming the applicability of low-vibration blasting using an electronic detonator to the section. And compared with the mechanical mass excavation method, an economic evaluation was conducted about the section, and it was evaluated that there was an economic advantage as the construction period was reduced by 88 days.
당 현장 주변에 보안물건이 위치하고 있어, 기존 설계상에 176m 구간이 무진동 기계식 굴착공법으로 설계되었으나, 시공성 및 경제성 향상을 위하여 전자뇌관 미진동 발파공법을 제안하였다. 검토 결과, 발파소음, 진동 모두 허용기준 이내의 안전성을 확보하여 해당 구간에 대하여 전자뇌관 미진동 발파공법 적용 가능성을 확인하였다. 아울러 검토 구간에서 무진동 굴착공법과 전자뇌관 미진동 발파공법을 비교한 결과, 공사 기간을 88일 단축하여 경제적으로 큰 이점이 있는 것으로 평가되었다.