• Title/Summary/Keyword: Low-vibration blasting method

Search Result 13, Processing Time 0.023 seconds

A Case Study on the Applicability Evaluation of Electronic Detonator for Non-Vibration Excavation Section (무진동 굴착구간에 대한 전자뇌관의 적용성 평가 사례)

  • Seung-Won, Jung;Jin-Hyuk, Song;Nam-Sun, Hwang;Nam-Soo, Kim;Min-Sung, Jung
    • Explosives and Blasting
    • /
    • v.40 no.4
    • /
    • pp.47-56
    • /
    • 2022
  • It was designed as the mechanical excavation mass method on 176m because the safety thing is located around the site. But low-vibration blasting using an electronic detonator was proposed to improve constructability and economy. As a result of the suggestion blasting, both blasting noise and vibration were safe within the allowable limit, confirming the applicability of low-vibration blasting using an electronic detonator to the section. And compared with the mechanical mass excavation method, an economic evaluation was conducted about the section, and it was evaluated that there was an economic advantage as the construction period was reduced by 88 days.

Evaluation of low-vibration electronic detonator blasting method to improve constructability in non-vibration excavation section (무진동 굴착구간에서의 시공성 향상을 위한 미진동 전자발파공법 평가)

  • Seung-won Jung;Jin-Hyuk Song;Nam-Sun Hwang;Hyun-Gi Kim;Nam-Soo Kim;Jong-woo Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.157-173
    • /
    • 2023
  • Although this site is designed with a non-vibration excavation method for a section of 265 m, there are concerns about decline of constructability and economic feasibility. For this reason, the low-vibration electronic detonator blasting method was suggested. To evaluate the applicability of the low-vibration electronic detonator blasting method, the damage range of blasting vibration of low-vibration electronic detonator blasting applied just before the site (suggestion I) and low-vibration electronic detonator blasting constructed close range the subway like this site (suggestion II) was analyzed. As a result of comparing the blasting vibration damage ranges of the two suggestions, the damage range of suggestion II was calculated more conservatively. Considering the specificity of the close range of this site, suggestion II was selected for design change for safer construction. As a result, it is predicted that there will be no damage to the structure even if the 72 m section out of the non-vibration excavation 265 m section is changed to the Low-vibration electronic detonator blasting. And it is evaluated that high economic benefits can be obtained because the total expected excavation period can be reduced by 144 days from 662.5 days.

A Study on the Nano-Plasma Rock Breaking Blasting Method Using Rapidly Expansive Metal Mixture (급팽창 금속혼합물을 이용한 나노프라즈마 바위 파쇄공법에 관한 연구)

  • Kim Sung-Kook;Ahn Myung-Seog;Cho Myung-Chan
    • Explosives and Blasting
    • /
    • v.23 no.3
    • /
    • pp.57-74
    • /
    • 2005
  • In the past, explosives like dynamite was used to blast rock. However, today it is difficult to use explosives in urban blastinglike excavation for subway, building, and housing land. According to Korea Department of Construction and Transportation's proposal for blasting design manual and test blasting, from TYPE I blasting to TYPE IV blasting are recommended when we determine 0.3cm/sec(centisec) as a maximum allowable ground vibration with a distance between $25m\~120m$ from structures. This article was written to introduce one of TYPE I (reck blasting within 25m from structures) blasting method, Nano-Plasma blasting method. When Nano-Plasma blasting method is applied in urban blasting job, ground vibration (15m away from blasting point) is expected 0.1cm/sec, which is only half of a ground vibration when low ground vibration blasting method is applied. By this unique characteristic, Nano-Plasma blasting method is epochal urban blasting technique.

A Study on the Tunnel Blasting Technique with a Combined Application of Electronic Detonators and Low Vibration Explosives in a Close Proximity to a Safety things (전자뇌관과 미진동폭약을 활용한 보안물건 초근접 구간에서의 터널발파공법 적용에 관한 연구)

  • Oh, Sei young;Lee, Chun sik;Lee, Ki keun;Lee, Dong hee;Lee, Seung jae;Park, Jong ho
    • Explosives and Blasting
    • /
    • v.35 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • Due to civil complaints on vibrations and noises arising from blasting, mechanical excavation has been widely used for tunneling rather than the method of blasting, especially in the case of being in a close-proximity of 10M-20M range to a safety-thing. However, mechanical excavation, though less, it does increase the cost of whole construction project as the period of excavation is much prolonged from lack of constructability. This study aims to research and develop an effective blasting method that can ensure the constructability of shortened excavation period whilst not compromising the safety of the safety-things in a proximity to the blasting site by using a combination of an electronic detonator that can accurately control its delay period and a Low Vibration Explosives(LoVEX) that is effective on vibration control.

The Mixed Charging Method with Low-velocity Explosives and Normal Explosives in Tunnel Blasting (터널 발파에서의 저폭속폭약과 일반폭약의 혼용장약법)

  • Kang, Dae-Woo;Ahn, Bong-Do
    • Tunnel and Underground Space
    • /
    • v.20 no.4
    • /
    • pp.252-259
    • /
    • 2010
  • In urban tunnels, namely, in case there are residents in the near distance, we normally use non-vibration and ambient vibration which are not blasting methods because it’ impossible to meet the blasting vibration regulation with only normal explosives. However, non-vibration methods not only cause increase of excavating cost, but need much time than explosives. Generally, the lower velocity explosives with 2,000 m/s VOD have been applied to ambient vibration blasting in open cut area, but difficult in tunneling in its use. However, by charging the hole together with lower velocity explosives and normal explosives, we have got the result which shows 20~30% vibration decrease compared with using only normal explosives. Therefore, I’ like to suggest the blasting method which is able to do as ambient vibration using lower velocity explosives mixed with normal explosives in urban tunnel and the area which is adjacent to security facilities within the vibration regulation.

서울지하철 3,4호선 Tunnel 굴착과 진동대책 조사연구(1)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.2
    • /
    • pp.3-15
    • /
    • 1982
  • The study on prevention measures for vibration and excavation of tunnel for the #3, #4, Seoul Subway. In the Seoul subway tunnel blasting, the drilling pattern and prevention method to seismic vibration are as follows as well as for adaptions of NATM, the supportings of roof and wall holes are arranged with control blasting. 1. The blasting is executed basically using the low velocity explosive such as slurry, Nitrate ammonium explosive, and F-I and F-II explosive for control blasting substituting of existing dynamite. 2. The cut holes are arranged with burn cut pattern and also must be arranged with M/S electrical delay caps substituting of ordinary do]ay caps. 3. Jack leg drills are used in Five Job sites and a jumbo drill in one job site. 4. In performance of safety work and in maintenance of building safety. The drilling length for blasting will not exceed 1.20 meter for round so that the vibration value shall carry below 0.3cm/sec. The harmonizing of better powder, better drilling machine and better technique is only the way of improving tunnelling efficiency and less vibration will help the dereasing of accidence.

  • PDF

Application of Rock Splitter to Rock Excavation in an Open pit (노천현장 암 파쇄 굴착에 따른 할암공법의 적용성 고찰)

  • Won, Yeon-Ho;Kang, Choo-Won
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.63-70
    • /
    • 2010
  • This study is investigated the extent of the noise and ground vibration in an adjacent zone of a cattle pen and an antiquated housing structures for judgement of the spot applicability on the extents of the noise and ground vibration of the rock-splitting method by an oil pressure. It is studied by measuring and analysing in an adjacent position the extents of the noise and ground vibration according to the work process of the rock-splitting method, such as drilling, rock-splitting, arranging rock, loading and by being compared with the permitted level on the noise and ground vibration fixed at the spot. To the results, it is identified that the influence to the noise has to be considered, even if the rock-splitting method is applied as an excavation method to lower a ground vibration by the classification on blasting method of the ministry of land, transport and marine affairs.

A Study on Practicalization of Low Vibration New KINRECKER-II (미진동 발파용 New KINECKER-II 실용화에 관한 연구)

  • Jang, Seung-Ho;Park, Hee-Won;Lim, Jung-Hyuk;Lee, Chang-Yeop;Ahn, Bong-Do;Kang, Dae-Woo;Lee, Ha-Young
    • Explosives and Blasting
    • /
    • v.35 no.1
    • /
    • pp.43-52
    • /
    • 2017
  • Mountain and hill areas occupy by more than 70% in South Korea and Rock drilling should be applied in order to reduce noisy & vibration from massive civil engineering business such as road expansion, high-way construction, subway construction and construction of site renovation such as a newly-built & re-development of apartment, newly-built of high-rising building in downtown area. As Blasting noise & vibration such as vibration, noise, fly rock etc caused by blasting operation from large small scale construction occurs, neighboring residents who demand the compensation file a civil complaint so that the business reach a deadlock. As the excavation method for these areas, There are blasting of micro-vibration, mechanical excavation method(Rock splitter, Breaker etc), similar blasting method(plasma, gel fragmentation etc) to date. In this study, we are trying to find the feature & performance which get improved economic feasibility & construct ability through improving sympathetic detonation of New KINECKER-I used in blasting of micro-vibration & formulation and would provide convenience for use by introducing standard blasting pattern & construction method. Also, checked and confirmed all the blasting with connecting cap has been cleary detonated.

Blasting Standardization works for NATM on the Seoul Subway Construction by Dr, Ginn Huh (서울 지하철공사 발파공법의 표준화)

  • Heo, Jin
    • Journal of the Korean Professional Engineers Association
    • /
    • v.16 no.3
    • /
    • pp.5-23
    • /
    • 1983
  • On the Seoul Metropolitan Subway Construction of No. 3, 4 Line, the total length is 57 Km and it is now undergoing almost 55% progress. The working method is classified into Open Cut of 70% and the rest of 30% tunnelling method in the 48 job site. Above tunnelling method is execute by American Steel Support System and the rest of 10 job site carried out by New Austria Tunnelling Method. This paper describes Blasting Standardizations works on the above Tunnelling ' Open Cut Method under big slogan, first safety, second execution. As a superintendent, I strived standardization of works with Better powder, Better Drills ' Better Pattern. Geological structure of Seoul area is composed by Jurassic Granite and also the above rockgroup are over burden by Alluviums as a Unconformity. First of all, I carried out the standard amount of powder and burden through experimental standard blasting by each powder as following Blasting works in the subway construction is surrounding shop Building, under pass the city river and also under pass highest building basement floor. I made allowable Blasting Vibration Value by West-Germany Vornorm DIN 4150, Teil 3 and should measure each blasting works as fellows all of powder is used basically Low-Gravity and Low Velocity such as Slurry, Ammonium Nitrate ' Finex I, II. for Smooth Blasting Instead of Gelatin Dynamite. Electric Detonation Cap is used basically M/S Delay Cup instead of Electric delay ' Simultaneous cap. I applied following formula V=KW3/4 $D^{-2}$ V=Particle Velocity (Cm/sec) K=Ginh Huh's Value W=Delay Charge (Kg) D=Distance(m) In the Open Cut, within 1m distance from H-pile I made to use the Concrete breaker, as following V=7W/$^{0.5}$V/$^{-1.75}$ On the Concentrate Building area, I advise to use Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.e Light class drill ø36m Bit and advance 1.1m per round blasting the three boom jumbo drill over ø45mm used only suburb of city.

  • PDF

A Case Study on the Application of Low Vibration Blasting Method (미진동 발파공법 적용사례에 관한 연구)

  • 박주연;이천식;윤성현;안명석;류창하
    • Explosives and Blasting
    • /
    • v.20 no.3
    • /
    • pp.39-48
    • /
    • 2002
  • 우리나라는 지질특성상 각종 토공사를 시행할 때 암반 절취가 필수적이다. 그러나 소음진동 규제법의 강화, 각종 건설민원 발생 및 안전관리를 강화하기 위하여 종래에 해오던 일반발파(대발파)공법을 적용할 현장은 거의 없는 실정이므로, 미진동 발파공법과 진동제어 발파공법에 대한 기준품셈 및 시공기술에 대한 연구가 더욱 필요하다. 또한 종래의 미진동 발파공법의 품셈기준으로 되어있는 미진동 파쇄기(CCR, 상품명 Fine Cracker)를 사용한 발파공법은 기존의 암절취에 기술적 문제가 일부 대두되므로 이를 보완하기 위해 퇴적암 절취현장에서 미진동 파쇄기.정밀.에멀젼 화약을 사용하여 비교실험을 하였으며, 최근에 새로운 미진동 파쇄기(상품명 : Fine Cracker Plus)를 개발 시판하게 되어 이를 비교 검토하였다. 그 결과 일축 압축강도 $1623~2060kg/\textrm{cm}^2$의 경암 내지 극경암에서도 양호한 발파효과를 볼 수 있었다.