과제정보
This work was supported by a 2-Year Research Grant of Pusan National University.
참고문헌
- Hong WK, Lee GJ, Lee S, Kim SH. Algorithms for in-situ production layout of composite precast concrete members. Automation in Construction. 2014 May;41:50-9. https://doi.org/10.1016/j.autcon.2014.02.005
- Park SH, Lim CY, Lee WJ, Kim DS, Jung, YS. The experimental study on concrete manufacturing technologies for ultra high strength concrete pile. Proceeding of the 2013 Spring Annual Conference of the Korea Concrete Institute; 2013 May 8-10; Seoul, Korea. Seoul (Korea): the Korea Concrete Institute; 2013. p. 67-8.
- Won IW, Na YJ, Kim JT, Kim SK. Energy-efficient algorithms of the steam curing for the in situ production of precast concrete members. Energy and Building. 2013 Sep;64:275-84. https://doi.org/10.1016/j.enbuild.2013.05.019
- Kim SK, Hong WK, Kim JH, Kim JT. The development of modularized construction of enhanced precast composite structural systems (Smart Green frame) and its embedded energy efficiency. Energy and Building. 2013 Nov;66:16-21. https://doi.org/10.1016/j.enbuild.2013.07.023
- Lim J. A risk management model for in-situ production of precast concrete members focused on time and cost using system dynamics [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2018. 54 p.
- Lim C. Construction planning model for in-situ production and installation of composite precast concrete frame [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2016. 9 p.
- Oh OJ. A model for production and erection integration management of large scale PC structures using system dynamics [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2017. 42 p.
- Lim J, Park K, Son S, Kim S. Cost reduction effects of in-situ PC production for heavily loaded long-span buildings. Journal of Asian Architecture and Building Engineering. 2020 Mar;19:242-53. https://doi.org/10.1080/13467581.2020.1740095
- Jung KO, Chung YK. The pollution and economic growth based on the multi-country comparative analysis. Journal of Industrial Economics and Business. 2004 Oct;17(4):1077-98.
- Lee GJ. A study of in-situ production management model of composite precast concrete members [Ph.D. Thesis]. [Seoul (Korea)]: Kyung Hee University; 2012. 77 p.
- Lim JY, Kim SK. Evaluation of CO2 emission reduction effect using in-situ production of precast concrete components. Journal of Asian Architecture and Building Engineering. 2020 Feb;19(2):176-86. https://doi.org/10.1080/13467581.2020.1726763
- Lim JY, Kim SK, Kim JJ. Dynamic simulation model for estimating in-situ production quantity of PC members. International Journal of Civil Engineering. 2020 Apr;18:935-50. https://doi.org/10.1007/s40999-020-00509-4
- Na YJ, Kim SK. A process for the efficient in-situ production of precast concrete members. Journal of the Regional Association of Architectural Institute of Korea. 2017 Oct;19(4):153-61.
- Pan M, Pan W. Advancing formwork systems for the production of precast concrete building elements: from manual to robotic. Proceedings of 2016 Modular and Offsite Construction (MOC) Summit; 2016 Sep 29-Oct 01; Edmonton, Canada. Alberta (Canada): Modular and Offsite Construction Summit; 2016. p. 2-9. https://doi.org/10.29173/mocs1
- Pan M, Pan W. Determinants of adoption of robotics in precast concrete production for buildings. Journal of Management in Engineering. 2019 Sep;35(5):05019007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000706
- Pan W, Gibb AGF, Dainty ARJ. Strategies for integrating the use of off-site production technologies in house building. Journal of Construction Engineering and Management. 2012 Nov;138(11):1331-40. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000544
- Hwang BG, Shan M, Looi KY. Key constraints and mitigation strategies for prefabricated prefinished volumetric construction. Journal of Cleaner Production. 2018 May;183:183-93. https://doi.org/10.1016/j.jclepro.2018.02.136
- Mao C, Shen Q, Pan W, Ye K. Major barriers to off-site construction: The developer's perspective in China. Journal of Management in Engineering. 2015 May;31(3):04014043. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000246
- Arashpour M, Wakefield R, Abbasi B, Lee EWM, Minas J. Off-site construction optimization: Sequencing multiple job classes with time constraints. Automation in Construction. 2016 Nov;71:262-70. https://doi.org/10.1016/j.autcon.2016.08.001
- Pan M, Linner T, Pan W, Cheng H, Bock T. A framework of indicators for assessing construction automation and robotics in the sustainability context. Journal of Cleaner Production. 2018 May;182:82-95. https://doi.org/10.1016/j.jclepro.2018.02.053
- Lim J, Kim JJ. Dynamic optimization model for estimating in-situ production quantity of PC members to minimize environmental loads. Sustainability. 2020 Oct;12(19):8202. https://doi.org/10.3390/su12198202
- Kang SM, Kim OJ. Domestic and foreign present situation analysis of a PC method. Seoul (Korea): Daelim Technology Research Institute: Architecture(Spring); 2006. p. 28-37.
- Park JH, Kim SJ, Paik MS, Lee SH, Park B K, Jung SJ. An experimental study on strength characteristics of mass concrete cast with high-strength concrete for precast application. Proceeding of the 2007 Autumn Annual Conference of the Korea Concrete Institute; 2007 Nov 7-9; Seoul, Korea. Seoul (Korea): the Korea Concrete Institute; 2007. p. 585-8.
- Park H, Park S, Hong K, Kim S. Development of residential PC prefabricated building structure system. Construction Engineering and Management. 2011 Feb;12(1):11-6.
- Song KJ, Lee UK, An SH, Kang KI. PC production schedule optimization model using a genetic algorithms and random keys. Proceeding of the 2005 Autumn Annual Conference of the Architectural Institute of Korea; 2005 Oct 24-25; Seoul, Korea. Seoul (Korea): the Architectural Institute of Korea; 2005. p. 487-90.
- You YC, Choi KD, Kim KH, Lee LH. Mechanical bar anchorage of the PC in beam-column joint. Journal of the Architectural Institute of Korea. 2001 May;17(5):35-42.
- Yoon D, Hong W, Yoon T. Half slab construction for eco-friendly composite frame system. Proceeding of the 2010 Autumn Annual Conference of the Korea Institute of Building Construction; 2010 Nov 18-19; Suwon, Korea. Seoul (Korea): the Korea Institute of Building Construction; 2010. p. 15-8.
- Hong WK, Kim SK, Kim SI. Load carrying capacity of structural composite hybrid system (green frame). The International Journal of the Korea Institute of Ecological Architecture and Environment. 2010 Feb;10(1):25-31.
- Son SH, Lim JY, Kim SK. Planning algorithms for in-situ production of free-form concrete panels. Automation in Construction. 2018 Jul;91:83-91. https://doi.org/10.1016/j.autcon.2018.03.006
- Kang LS, Kim CH, Kwak JM. Analysis for the importance of risk factors through the project life cycle. Journal of the Architectural Institute of Korea(Structure & Construction). 2001 Aug;17(8):103-10.
- Chung BH, Chung YS. Analysis and reduction for risk factors of construction projects. Korean Journal of Construction Engineering and Management. 2001 Aug;2(4);62-8.
- Shin KH, Kim JJ. A Study on the importance of risk factors for effective risk management in the pre-project planning phase of the development projects. Korean Journal of Construction Engineering and Management. 2002 Mar;3(2):75-86.
- Suh SW, Kim JJ, Kim KR. A decision making model for construction risks using optimized response method. Journal of The Architectural Institute of Korea(Structure & Construction). 2002 Oct;18(8):115-22.
- Kang SK. A study on the risk management efficiency in the cost of apartment housing development [master's thesis]. [Seoul (Korea)]: Chung-Ang University; 2004. 86 p.
- Kim MH. A study on the method of the risk management in the real estate development project. Seoul (Korea): Construction and Economy Research Institute of Korea; 2005. 97 p.
- Lee JK, Lee JH. A study on the method of the risk management in the housing project. Journal of the Korea Institute of Ecological Architecture and Environment. 2008 Apr;8(2):79-86.
- Lim J, Son S, Kim JT, Kim S. Experimental study of in-situ production of precast concrete members, Proceeding of the 7th International Conference on Construction Engineering and Project Management(ICCEPM); 2017 Oct 27-30; Chengdu, China. Seoul (Korea): Korea Institute of Construction Engineering and Management; 2017. p. 98.