과제정보
본 연구는 국토교통부가 주관하고 국토교통과학기술진흥원에서 시행한 2021년도 철도 인프라 BIM 발주관리체계 구축 및 실증 과제(21RBIM-B158179-02)의 연구비 지원에 의한 결과임.
참고문헌
- Alireza Ahmadian, F.F., Rashidi, T.H., Akbarnezhad, A., Waller, S. T. (2017). BIM-enabled sustainability assessment of material supply decisions, Engineering, Construction and Architectural Management, 24(4), pp. 668-695. https://doi.org/10.1108/ECAM-12-2015-0193
- Barlish, K., Sullivan, K. (2012). How to measure the benefits of BIM-a case study approach, Automation in Construction, 24, pp. 149-159. https://doi.org/10.1016/j.autcon.2012.02.008
- BS EN ISO 19650 (2018). Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) - Information management using building information modelling, British Standards Institute. https://www.iso.org/standard/68078.html (Oct. 4. 2021).
- BS EN ISO 19650-2 (2018). Organisation of information about construction works - Information management using building information modelling - Part 2: Delivery phase of assets British Standards Institute. https://www.iso.org/standard/68080.html (Oct. 4. 2021).
- Building SMART alliance. (2015). Construction Operations Building information exchange (COBie). https://www.wbdg.org/resources/construction-operations-building-information-exchange-cobie (Oct. 1. 2021).
- Chin, S. Y. (2020). Storytelling BIM. CIR. pp. 120-200
- CPIx (2013), Building Information Modelling (BIM) Assessment Templates (IT Resource and Supplier Assessment), Construction Project Information Committee, https://www.cpic.org.uk/cpix/cpix-bim-assessment-file (Oct. 5. 2021).
- Doloi, H. (2009), Analysis of Pre-Qualification Criteria in Contractor Selection and Their Impacts on Project Success, Construction Management and Economics, 27(12), pp. 1245-1263. https://doi.org/10.1080/01446190903394541
- Eastman, C. M., Eastman, C., Teicholz, P., Sacks, R., Liston, K. (2011). BIM Handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. John Wile & Sons. pp. 1-30
- El-Abbasy, M.S., Zayed, T., Ahmed, M., Alzraiee, H., Abouhamad, M. (2013), Contractor Selection Model for Highway Projects Using Integrated Simulation and Analytic Network Process, Journal of Construction Engineering and Management, 139(7), pp. 755-767. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000647
- Gangneung-Jejin single-track railway section 2 constrution work (2021). Korea National Railway. pp. 300-375
- Giel, B., Issa, R. (2015), Framework for Evaluating the BIM Competencies of Facility Owners, Journal of Management in Engineering, ASCE, pp. 1-15.
- Lee, G. I., Park, J. J., Choi, H. l., Shin, M. H. (2018). A Study on the Development of BIM based Railway Infrastructure Information Management System for the Analysis of BIM Applications in Government and Public Agencies. DOI: https://doi.org/10.13161/kibim.2018.8.1.001.
- Mahamadu, A.-M., Mahdjoubi, L., Booth, C. (2017), Critical BIM qualification criteria for construction pre-qualification and selection, Architectural Engineering and Design Management, 13(5) pp. 326-343. https://doi.org/10.1080/17452007.2017.1296812
- Manu, E., Ankrah, N., Chinyio, E., Proverbs, D. (2015). Trust influencing factors in maincontractor and subcontractor relationships during projects, International Journal of Project Management, 3(7), pp. 1495-1508.
- National Jidokgwon Forest Healing Center Creation Project (2020). Public Procurement Service. https://www.g2b.go.kr/pt/menu/selectSubFrame.do?framesrc=/pt/menu/frameTgong.do?url=https://www.g2b.go.kr:8101/ep/tbid/tbidList.do?taskClCds=&bidNm=%C1%F6%B4%F6%B1%C7&searchDtType=1&fromBidDt=2019/11/01&toBidDt=2021/12/30&fromOpenBidDt=&toOpenBidDt=&radOrgan=1&instNm=&area=®Yn=Y&bidSearchType=1&searchType=1 (Oct. 6. 2021).
- PAS 1192:3 (2013), Tender Documents BIM 1401, https://cic.org.uk/admin/resources/bim-1401-tender-documents.pdf (Oct. 5. 2021).
- Railway BIM 2030 Roadmap (2018). Ministry of Land, Infrastructure and Transport. http://big.yonsei.ac.kr/railbim/reports/RailBIM2030Roadmap_Full_Eng_Final.pdf (Oct. 4. 2021).
- Singapore Government (2013). Singapore_BIM_Guide Version 2.0, https://www.corenet.gov.sg/general/bim-guides/singapore-bim-guide-version-20.aspx (Oct. 5. 2021).
- Succar, B., Sher, W., Williams, A. (2013), An Integrated Approach to BIM Competency Assessment, Acquisition And Application, Automation in Construction, 35, pp. 174-189. https://doi.org/10.1016/j.autcon.2013.05.016
- Van Berlo, L. A. H. M., Dijkmans, T., Hendriks, H., Spekkink, D., Pel, W. (2012). BIM QuickScan: benchmark of BIM performance in the Netherlands. In Proceedings of the CIB. https://itc.scix.net/pdfs/w78-2012-Paper-30.pdf (Oct. 5. 2021).
- Mahamadu, A. M., Manu, P., Mahdjoubi, L., Booth, C., Aigbavboa, C., Abanda, F. H. (2019). The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects. Engineering, Construction and Architectural Management. https://www.research.manchester.ac.uk/portal/files/99833447/Authors_Accepted_Version.pdf (Oct. 1. 2021).