Research of Schedule Managing and Forecasting for Project Progress Method in Defense Research & Development using Earned Schedule Concept

Earned Schedule 개념을 활용한 국방 연구개발 사업진도 기법의 일정 관리 및 예측 기능 연구

  • Cho, Jungho (R&D Programming Directorate, Agency for Defense Development) ;
  • Ryu, Sangchul (R&D Programming Directorate, Agency for Defense Development) ;
  • Lim, Jaesung (Department of NCW Engineering, Graduate School, Ajou University)
  • 조정호 (국방과학연구소 연구계획부) ;
  • 류상철 (국방과학연구소 연구계획부) ;
  • 임재성 (아주대학교 일반대학원 NCW공학과)
  • Received : 2019.04.08
  • Accepted : 2019.07.12
  • Published : 2019.08.05

Abstract

Traditional project progress method(PPM) has been used for Korean defense research and development project management for the last 20 years. However, it is difficult to intuitively understand the performance in terms of the project schedule, because the PPM does not provide the function of managing and forecasting project schedule. Therefore, this paper proposes new schedule managing and forecasting function for the PPM using earned schedule management concept. We verify the effectiveness of the proposed functions through several defense projects and prove that it is possible to reinforce the schedule management function of the PPM.

Keywords

GSGGBW_2019_v22n4_567_f0001.png 이미지

Fig. 1. Procedure of progress management in defense R&D project

GSGGBW_2019_v22n4_567_f0002.png 이미지

Fig. 2. Example of project progress index

GSGGBW_2019_v22n4_567_f0003.png 이미지

Fig. 3. Leveraging ESM concept

GSGGBW_2019_v22n4_567_f0004.png 이미지

Fig. 4. SPI and SEAC over the entire duration of a specific project

GSGGBW_2019_v22n4_567_f0005.png 이미지

Fig. 5. SPI quarterly comparison before project extension point

GSGGBW_2019_v22n4_567_f0006.png 이미지

Fig. 6. MAPE quarterly comparison before project extension point

Table 1. Estimate formula in EVM

GSGGBW_2019_v22n4_567_t0001.png 이미지

Table 2. Project schedule/budget adjustment status for last 5 years

GSGGBW_2019_v22n4_567_t0002.png 이미지

Table 3. Schedule performance indicator

GSGGBW_2019_v22n4_567_t0003.png 이미지

Table 4. Example of comparison between PPI and SPIPPM

GSGGBW_2019_v22n4_567_t0004.png 이미지

Table 5. Schedule estimate at completion(SEAC)

GSGGBW_2019_v22n4_567_t0005.png 이미지

Table 6. Performance factor of SEAC

GSGGBW_2019_v22n4_567_t0006.png 이미지

Table 7. Number of delayed projects for verification

GSGGBW_2019_v22n4_567_t0007.png 이미지

References

  1. Whitehouse, G. E., “Project Management Techniques,” Industrial Engineer, Vol. 5, No. 3, pp. 24-29, 1973.
  2. "Program Evaluation Research Task, Summary Report," Government Printing Office, Washington, D. C., USA, pp. 1-118, 1958.
  3. Q. W. Fleming and J. M. Koppelman, "Earned Value Project Management - 3rd edition," Project Management Institute Inc. USA, pp. 54-60, 2005.
  4. Jaewon Kim, et. al., "Proposal of the Project Management Procedure," Research & Development Report, RDPD-405-011428, Agency for Defense Development, Korea, pp. 138-142, 2001.
  5. "Yearly Project Planning Guidance," Regulation No. 297, Agency for Defense Development, Korea, October, pp. 1-11, 2008.
  6. "Quarterly Evaluation Analysis Task Guidance," Regulation No. 296, Agency for Defense Development, Korea, October, pp. 1-19, 2008.
  7. "Scientific Project Management Execution Guidance," Regulation No. 367, Defense Acquisition Program Administration, Korea, March, pp. 1-22, 2017.
  8. H. Jeon, et. al., "EVM Application Upgrade Plan," Security Management Institute, pp. 74-84, October, 2017.
  9. Walt Lipke, "Schedule is Different," The Measurable News, pp. 31-34, Summer, 2003.
  10. J. Cho and J. Lim, “An Analysis of Effect and Limitation when Adapting Earned Schedule Method for Schedule Management and Estimation in Korean Defense Research & Development Projects,” Journal of the Korea Institute of Military Science and Technology, Vol. 21, No. 3, pp. 396-402, 2018. https://doi.org/10.9766/KIMST.2018.21.3.396
  11. Jungho Cho and Jungyu Park, "A Comparison Analysis between SPI in EVM Techniques and Rate of Progress for Project in ADD," KIMST Annual Conference Proceedings, pp. 1508-1509, June, 2016.
  12. Suqrat Babar, et. al., "Estimated Cost at Completion: Integrating Risk into Earned Value Management," Journal of Construction Engineering and Management, Vol. 143, No. 3, 04016104, pp. 1-11, 2017.
  13. Jordy Batselier and Mario Vanhoucke, "Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost," Journal of Construction Engineering and Management, Vol. 141, No. 11, 05015010, pp. 1-13, 2015.
  14. Stephan Vandevoorde and Mario Vanhoucke, “A Comparison of Different Project Duration Forecasting Methods using Earned Value Metrics,” International Journal of Project Management, Vol. 24, No. 4, pp. 289-302, 2006. https://doi.org/10.1016/j.ijproman.2005.10.004
  15. Steven Nahmias and Tava Lennon Olsen, "Production and Operations Analysis : 7th edition," Waveland Press Inc. USA, pp. 62-66, 2015.
  16. "Earned Value Management Systems EIA-748-D Intent Guide," National Defense Industrial Association, August, pp. 1-56, 2018.