Abstract
In the application of the BIPV system, it is expected that the workability is lowered due to the difficulty in securing the space for wiring in the frame and the performance of the frame due to the wiring hole processing is lowered. Therefore, In this study, we propose a method to improve the wiring of the inner space of the BIPV frame, and through the simulation evaluation process, the thermal and condensation performance are secured by complementing the problems caused by the hole machining, and the time and effort required for BIPV construction are reduced. For this purpose, a wiring treatment method using a flange insertion tube was proposed, and the thermal and condensation performance was evaluated through simulation analysis.