CONSTRUCTABILITY IMPLEMENTATION MODEL USING DEPENDENCY STRUCTURE MATRIX

  • Youngjib Ham;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.550-555
    • /
    • 2011
  • Utilizing construction knowledge and experiences in design phase can reduce change orders and improve productivity in construction phase. To do so, information must be made available to the design team in time. Current approaches for effective utilization of constructability knowledge, however, only focus on the formalization of constructability knowledge such as a checklist, which lacks the consideration of the appropriate use at the proper point in time. The inadequate use of constructability knowledge can result in unnecessary reworks. To deal with this problem, the design team needs to know what constructability knowledge is required for specific design activities in the design process. This paper presents a constructability implementation model using the dependency structure matrix (DSM) that focuses on information flows between design activities and constructability knowledge. For this objective, design activities in the design process are modeled in a matrix form based on their dependency. Then, constructability knowledge, which needs to be considered in the design stage, is mapped into activities and incorporated into the matrix, creating Constructability-DSM (C-DSM). Next, the partitioning algorithm is applied to C-DSM for optimal information flow. The Partitioned C-DSM is then analyzed based on the relationship between activities. Finally, the optimal utilization of construction knowledge in the design process is determined by identifying what constructability knowledge is required for each design activity, and how and when it is reflected to design for constructability. Thus, this research can help provide robust control actions to reduce unnecessary iterative cycles in design process for efficient constructability implementation.

  • PDF

A BIM-based model for constructability assessment of conceptual design

  • Fadoul, Abdelaziz;Tizani, Walid;Koch, Christian
    • Advances in Computational Design
    • /
    • v.3 no.4
    • /
    • pp.367-384
    • /
    • 2018
  • The consideration of constructability issues at the design stage can lead to improved construction performance with smooth project delivery and savings in time and money. Empirical studies demonstrate the value obtained by integrating construction knowledge with the building design process, and its benefits for owners, contractors and designers. However, it is still a challenge to implement the concept into current design practice. There is a need for a decision support tool to aid designers in reviewing their design constructability, deploying current technological tools, such as BIM. Such tools are beneficial at the conceptual design stage when there is a room to improve the design significantly with less incurred cost. This research investigates how current process- and object-oriented models can be used to assess design constructability. It proposes a BIM-based model using embedded information within the design environment to conduct the assessment. The modelling framework is demonstrated in four key parts; namely, the conceptual design model, the constructability assessment model, the assessment process model and the decision-making phase. Each is associated with a set of components and functions that contribute towards the targeted constructability assessment outcomes. The proposed framework is the first to combine a numerical assessment system and a rule-based system, allowing for both quantitative and qualitative approaches. The modelling framework and its implementation through a prototype are described in this paper. It is believed that this framework is the first to enable users to transfer their construction knowledge and experience directly into a design platform linked to BIM models. The assessment criteria can be customised by the users who can reflect their own constructability preferences into various specialised profiles that can be added to the constructability assessment model. It also allows for the integration of the assessment process with the design phase, facilitating the optimisation of constructability performance from the early design stage.

CONSTRUCTABILITY REVIEWS: A STRATEGIC PROCESS IN DESIGN DEVELOPMENT

  • Patrick T.I. Lam;Franky W.H. Wong
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.1-8
    • /
    • 2007
  • Construction designs are often produced with insufficient considerations on the constructability aspects. Poor constructability has resulted in delay, cost increase, disputes, safety hazards and inconvenience to the public. Increasingly, there has been a call for more systematic input of construction knowledge in the planning and design processes of modern day's infrastructure development. In some countries, notably the US, the practice of constructability reviews is on the rise, with concomitant benefits. It is advocated that construction plans and designs be subject to constructability reviews as early as possible. It should be made part of the project management strategy driven by the client. This paper outlines the constructability review process and benefits, whilst drawing lessons from a number of case studies.

  • PDF

Methods of Reviewing Constructability of Nuclear Power Plants Utilizing a Data-based Technology

  • Kim, Woo Joong;Lim, Byung Ki;Byon, SuJin
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.147-149
    • /
    • 2015
  • A nuclear power plant construction project normally involves a large construction work of which the total project cost is over 5 trillion Won, Such a large-scale construction project has the risks of schedule delay and quality degradation due to increase in project cost, because designs are changed due to design errors. The reasons for design changes during installation are 1) insufficient engineering capability of the owner, 2) information discontinuance due to the multiple package method, and 3) inefficient constructability review processes. Accordingly, this study proposes, through problem analysis, a method of developing a constructability review system that utilizes constructability review processes and a data-based technology (3D modeling) that are optimized for nuclear power plant construction projects. It also presents a method of establishing a system for reviewing constructability in which constructability review processes and a Database (3D model, Schedule, Design change Items) are linked each other.

  • PDF

A PROPOSAL OF CONSTRUCTABILITY REVIEW IN THE BASIC DESIGN STEP FOR DESIGN-BUILD PROJECTS

  • Sung-Wook Choi;Young-Woong Song;Yoon-Ki Choi;Dong-Woo Shin;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1150-1153
    • /
    • 2005
  • The orders of Design-Build Delivery System (DBDS) in a large and public construction project have been increasing. Single Source Responsibility (SSR) for design and construction, which contributes to quality improvement of design and construction, has been performed. The DBDS performs SSR for design and construction, but, it has not maximized effect because of the dissatisfied alternative analysis procedures which are based on constructability evaluation and the information system in the design step. In this research, Constructability Evaluation Factors (CEFs) that must be evaluated, investigated, and reflected in the basic design step for design-build projects. The CEF proposed and the business process of each conductor has been systematized. To propose constructability evaluation factors, first classify drawing information by the constructability evaluation sphere. CEFs must be proposed to evaluate factors according to interference among work items. Second, applicable CEFs must be classified by preference ranking and weight. Third, the values of constructability factors in accordance with building elements and work items, need to be calculated. Finally, the CEFs proposal will support rational decision making, design cost reduction, and quality improvement through the values for constructability of building elements and work items.

  • PDF

Evaluation Method of Constructability Performance by Implementing Construction Engineering at the Design Phase of Building Construction (건축공사 설계단계에서의 시공엔지니어링 업무 수행에 따른 시공성 평가 방안)

  • Kim, Tae-Hoon;Cho, Kyu-Man
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.128-129
    • /
    • 2018
  • With the increase of tall building construction, efforts for enhancing constructability are required from the pre-construction stage. Therefore, in this study, we proposed an evaluation method of constructability performance by performing construction engineering activities at the design phase. Based on some results of previous studies, we estimated the importance of design factors and categories influencing the constructability in each engineering activity related to temporary work and then presented a method for evaluating the constructability performance of design alternatives.

  • PDF

Analysis of Constructability Factors Affecting on the Productivity of Tall Building Construction -With Focus on the Area of Steel Work- (고층 건물에서 시공성 요인이 생산성에 미치는 영향 분석 -철골 공사를 중심으로-)

  • Yoon, Hyunbo;Kim, Yea Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.30-38
    • /
    • 2014
  • Achieving high productivity and constructability are very important issues in construction industry. Study on constructability have been conducted actively, and many researches referred that improving constructability can enhance cost, quality, schedule, productivity and so on. However, there are lack of quantitative analysis, since most studies have proved correlation between productivity and constructability using questionaries and by case studies. Also, researches are mostly about specific detail scope of work to improve constructability, thus it is hard to apply constructability factors on various work in construction. In this paper, will deduct general factors affecting on constructability and evaluate effects of factors affecting on each work. Furthermore this paper will verify impact of factors affecting on productivity by multi regression anlaysis using actual data sets of high-rise building construction site.

Analysis on Constructability Information and Design Elements by Construction Engineering Task at the Design Phase - Concentrated on Temporary Work in High-rise Building Projects - (설계단계 시공엔지니어링 업무별 주요 시공성 정보 및 설계요인 분석 - 고층 건축 프로젝트의 가설공사를 중심으로 -)

  • Lee, Jin Woong;Kim, Taehoon;Cho, Kyuman
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.20 no.6
    • /
    • pp.97-104
    • /
    • 2018
  • Recently, as the shape and function of high-rise buildings have become more complex, engineering for reflecting the constructability in the design phase has the increasing importance. However, engineering tasks are not performed at the appropriate level and timing in most projects, which leads to inefficient work such as design changes and reworks. Hence, this study investigated the constructability knowledge, design elements, and supporting tools required to conduct engineering tasks related to temporary work at the design phase, and also analyzed the relationship between these factors using the correlation analysis. As a result, when the engineering tasks are applied in the design phase, constructability knowledge related to 'construction method and process' is the most important and the design factor related to 'layout/arrangement' should be considered as the most important factor. Based on the results of this study, the project participants can efficiently use necessary constructability knowledge during the design phase and facilitate effective decision-making and design alternatives for enhancing constructability.

Improving Constructability Analysis Tasks by Applying BIM Technology (시공성 분석업무 개선을 위한 BIM 기술의 적용방안)

  • Park, Chan-Sik;Park, Hee-Teak
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.137-146
    • /
    • 2010
  • Becoming construction projects larger and more complicated, and utilizing more varied and complex contracting and delivery systems in the industry, integrating information and managing constructability from project inception to completion became the most critical tasks for the successful project management. However, current industry practices of constructability analysis which are too much dependent on field engineers and managers' experiences, are not performed efficiently and also not managed effectively. Then the scope, method, and procedure in performing analysis tasks are not certain as well as not systematic, In addition, due to using 2D based drawings and documents, information required at project phases for the analysis is inconsistent and inaccurate. This study aims to suggest the use of BIM technology and functions for solving various problems of current constructability practices. In particular, constructability analysis tasks performed at design and construction stages are identified and their adaptability, applicability, and benefits of BIM are investigated through interviews on constructability and BIM professionals in the industry.

Application of 3D Printing Technology for Formwork Constructability Review in Tall Building Construction (초고층 거푸집 공사의 시공성 검토를 위한 3D Printing의 활용)

  • Lee, Junehyuck;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.69-70
    • /
    • 2016
  • The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.

  • PDF