Figure 1. Hourly mean transmission power of TL in Dangjin-si by voltage on September, 2017.
Figure 2. Process flowchart of EIA for ELF-MF of high voltage transmission line (HVTL).
Table 1. EIA survey overview of ELF-MF impact near overhead High Voltage Transmission Lines(HVTL)
Table 3. Measurement information of High Voltage Transmission line(HVTL) including Capacity, annual Avg. and Max. power in 2015~2017.
Table 4. Actual field measurement value(FV), predicted magnetic field strength value at annual mean power(Mean) and annual max. power(Max.) during recent 3 years 2015~2017 by the distance from the ground reference point under the HVTL(DGR) and the distance from the HVTL(DTL) (unit : mG)
Table 5. EMF-MF exposure Mitigation Options
Table 6. Checklists of environmental impact assessment for EMF-MF
Table 2. Investigation overviews for ELF-MF impacts of HVTL in EIA
References
- Ansan-si. 2017. Sasa-dong Ansan-si Public housing district Designation project EIA. [Korean Literature]
- Environmental Impact Assessment Support System (EIASS): http://www.eiass.go.kr/
- GEP. 2017. 345kV Gangneung Ahnin Thermal Power plant Power line Construction project EIA. [Korean Literature]
- Hong SC. 2015. Methodology of Environmental Impact Assessment of Electromagnetic Wave. Electromagnetic wave technology. 26(2): 24-30. [Korean Literature]
- Hong SM, Choi HS. 2008. A Study on the Conflict Management and Risk Frame in Siting Policy for NIMBY Public Facilities. Dispute Resolution Studies Review. 6(1): 113-144. [Korean Literature]
- Jeon JS, Choi SH, Jeon HJ, Kim YS, Hong SC. 2014. Evaluation of Extremely Low Frequency Magnetic Fields emission Level from High Voltage Transmission Lines. Environmental Impact Assessment. 23(5): 353-363. [Korean Literature] https://doi.org/10.14249/eia.2014.23.5.353
- Jeon IS, Kim HN. 2006. Exposure range setting method for High Voltage Transmission Line Electromagnetic wave. KEI. [Korean Literature]
- KEPCO. 2005. 765kV Shin-Kori-Bukgyeongnam (2section) Power line Construction project of EIA. [Korean Literature]
- KEPCO. 2012. 345kV Sindangjin-Sinonyang Power line Construction project EIA. [Korean Literature]
- KEPCO. 2012. 345kV Singapyeong-Sinpocheon Power line Construction project EIA. [Korean Literature]
- KEPCO. 2014. 154kV Yanggu-Hwacheon Hydro Power plant Power line Construction project EIA. [Korean Literature]
- KEPCO. 2017. 154kV Inju-Buldang Power line Construction project EIA. [Korean Literature]
- KEPCO. 2017. 154kV Namyang-Dongsongsan- Sagang Power line Construction project EIA. [Korean Literature]
- KEPCO. 2018. 154kV Bukosong Branch Power line Construction project EIA. [Korean Literature]
- Kim IJ, Yoo JM, Choi MS. 2011. A study on environmental impact assessment standard preparation and application. National Assembly Budjet Office. 8-11. [Korean Literature]
- Kim SD. 2010. An Experimental Study for Load Capacity and Dip Characteristic in Overhead Transmission Lines. Korean Institute of Illuminating and Electrical Installation Engineers. 24(12): 177-183. [Korean Literature]
- KLC. 2007. Gimpo River New Town Site Development project EIA. [Korean Literature]
- KOMIPO. 2015. 765kV Sinjungbu Substation and Power line Construction project EIA. [Korean Literature]
- KOSPO. 2016. 154kV Goryeong-Guji Power line Construction project EIA. [Korean Literature]
- KOMIPO. 2016. 154kV Sejong-Songgang, Deokjin-Daehwa Power line Construction project EIA. [Korean Literature]
- KOSPO. 2017. 154kV Changan Branch Power line Construction project EIA. [Korean Literature]
- KOSPO. 2018. 154kV Bukmyeon Branch Power line Construction project EIA. [Korean Literature]
- LH. 2014. Hwaseong Bibong Public housing district Construction project EIA. [Korean Literature]
- LH. 2016. UlsanDaun-2 Public housing district Construction project EIA. [Korean Literature]
- LH. 2017. Public housing district Development project near Suseo Station EIA. [Korean Literature]
- ME(Ministry of Environment. 2000). Research for development of EMF measurement process method. [Korean Literature]
- Minnesota State Interagency Working Group on Emf Issues. 2002. A White Paper On Electric and Mitigation Options.
- MTIE(Ministry of Trade Industry and Energy). 2017. Eighth Basic Plan for Electricity Supply and Demand. [Korean Literature]
- NIER(National Institute of Environmental Research). 2003. A survey of the EMF levels in Korea (I) - EMF levels near power line -.[Korean Literature]
- NIER(National Institute of Environmental Research). 2017. Study on the Standard Guideline of Environmental Impact Assessment (I) - focusing on Light pollution and Electromagnetic-.[Korean Literature]
- Park JH, Choi JG. 2018. A Study on the Improvement of the EIA Items and the Operating System Based on the Analysis of EIA Items Usage. Environment Impact Assessment. 27(1): 1-26. [Korean Literature]
- POSPower. 2018. 345kV POSPower Power line Construction project EIA. [Korean Literature]
- SPPC. 2016. 345kV Shin Pyeongtaek Natural gas power plant-Hwaseong Substation Power line Construction project EIA. [Korean Literature]
- Yang JH, Park SH, Kim TH, Hwang SI. 2016. Study on the soil related assessment factors in Korean Environmental Impact Assessment. [Korean Literature]
- Yoon SH, Jeon DB, Choi YI, Kwon HJ. 2013. An analysis of predictive value and actual measurement value of electromagnetic fields exposure in all the transmission lines in Korea, Summer Conference of the Korean Institute of Electrical Engineers. 369-370. [Korean Literature]