A Study on the Reason for Change of Master Plan of Hospital Architecture in Design Process

병원건축 마스터플랜이 설계과정에서 변경되는 원인에 관한 연구

  • Park, Cheolkyun (Department of Architectural Design, graduate School of Hanyang University) ;
  • Yang, Naewon (Department of Architecture, Hanyang University)
  • Received : 2018.10.11
  • Accepted : 2018.11.30
  • Published : 2018.12.15

Abstract

Purpose: The life span of a hospital building is short. This is because the building will have to be built up due to the fact that it can not cope with the new medical environment, it can not be replaced due to low floor height, lack of land. The purpose of the hospital building master plan is to find a way to fulfill its role in the long term. Methods: Comparison the proposals submitted by the master plan and the proposals submitted by the hospitals, the case of three hospitals that have established a master plan for the past three years. In addition, interviews with the designers who participated in the design competition and the administrator of hospital about the variables that occurred during the business process. Results: The result of this study can be summarized into four points. The first one is that master plan is changed by administrator of hospital so that Thy need to understand about the role of master plan. And next is to protect reduction of the project cost. Third, continuous participation of master plan researchers in following projects is good to communicate with administrator and designer. The last one is empathy of master plan by designer and users. Implications: It is necessary to reduce changing of master plan in design process for sustainable managing of hospital.

Keywords

OBSHBY_2018_v24n4_7_f0001.png 이미지

[Figure 1] Process of Decision Making for Hospital

[Table 1] Abstract of Analyzed Hospital

OBSHBY_2018_v24n4_7_t0001.png 이미지

[Table 2] Master Plan of Analyzed Hospital

OBSHBY_2018_v24n4_7_t0002.png 이미지

[Table 3] Use of Site

OBSHBY_2018_v24n4_7_t0003.png 이미지

[Table 4] Circulation System

OBSHBY_2018_v24n4_7_t0004.png 이미지

[Table 5] Arrangement of Department

OBSHBY_2018_v24n4_7_t0005.png 이미지

[Table 6] Use of Site and Circulation System

OBSHBY_2018_v24n4_7_t0006.png 이미지

[Table 7] Circulation System

OBSHBY_2018_v24n4_7_t0007.png 이미지

[Table 8] Step of Project

OBSHBY_2018_v24n4_7_t0008.png 이미지

[Table 9] Summary of Comparison

OBSHBY_2018_v24n4_7_t0009.png 이미지

[Table 10] Conclusion

OBSHBY_2018_v24n4_7_t0010.png 이미지

References

  1. Cho, Jun Young, 2016, Master Plan:지속가능한 성장과 변화를 위한 전략수립, 병원건축포럼, Architectural Institute of Korea, pp.5-28
  2. Kim, Ha Jin, 2004, A Study on the Architectural Remodeling Strategy of General Hospitals in Korea, Ph.D Dissertation, Hanyang
  3. Yang, Nae Won et al. 2015, 전라북도 남원의료원 종합시설운영계획 연구보고서, Architectural Institute of Korea
  4. Yang, Nae Won et al. 2016, 서산의료원 재활전문센터 신축 및 기존건물 리모델링을 위한 종합시설 계획수립 연구보고서, Architectural Institute of Korea
  5. Yang, Nae Won et al. 2017, 서산의료원 재활병동 건립에 따른 본관 리모델링을 위한 공간구성계획 수립 연구보고서, Architectural Institute of Korea
  6. Yang, Nae Won et al. 2017, 원주의료원 증(신)축 및 기존 건물 리모델 링을 위한 종합시설계획 수립 연구보고서, Architectural Institute of Korea