References
- Alfares, M and Seireg, A. (1996), "An integrated system for computer-aided design and construction of reinforced concrete buildings using modular forms", Automation in Construction, Vol. 5, No. 5, pp. 323-341. https://doi.org/10.1016/S0926-5805(96)00157-4
- Eastman, C., Aram, S. and Venugopal, M. (2011), "Status of Precast Project BIM Efforts in the US", PCI Conventional and National Bridge Conference.
- Eastman, C., Teicholz, P., Sacks, R. and Liston, L. (2008), BIM HANDBOOK - A Guide to Building Information Modeling, John Wiley & Sons, Inc.
- Jeong, J-S, Lee, K-M, Park, K-H and Park, Y-S (2013), "BIM Based Design of Precast Concrete Platform", Proceedings of ICCBEI 2013, pp. 367-369.
- Jeong, J-S (2013), BIM Based Design of Precast Concrete Platform, Master Thesis, SungKyunKwan University.
- Jo, J-H, Lee, K-M and Nam, S-H (2012), "Classification Scheme of Modular Bridge Pier for Information Modeling", Proceeding of society of CAD/CAM engineers, pp. 841-844.
- Jo, J-H, Lee, K-M and Nam, S-H (2012), "Parametric Modeling of Modular Bridge Pier", KIBIM Annual Conference 2012, Vol. 2, No. 1, pp. 59-60.
- Kang, T-W (2011), The Building Information Modeling Principle, Spacetime.
- Olofsson, T., Lee, G. and Eastman, C. (2008), "Case studies of BIM adoption for precast concrete design by midsized structural engineering firms", ITcon, Vol. 13, pp. 303-323.
- Park, N-Y, Jeong, J-S, Jo, J-H and Lee, K-M (2012), "Development of the RC Piers Design Module using Parametric Modeling Technique", KIBIM Annual Conference 2012, Vol. 2, No. 1, pp. 127-128.
- Sacks, R., Eastman, C. and Lee, G. (2004), "Parametric 3D modeling in building construction with examples from precast concrete", Automation in Construction, V. 13, No. 3, pp. 291-312. https://doi.org/10.1016/S0926-5805(03)00043-8