Abstract
The aim of this study was evaluated the effects of total rainfall, rainfall intensity and antecedent dry days and identify the correlation analysis with the EMC removal efficiency, in order to provide an understanding of the operation and maintenance factors of constructed wetland in flood pumping station. This study was conducted total of 20 monitoring in a catchment(326.2 ha) of constructed wetland in Ga-un flood pumping station located at the downstream of the Wang-suk stream. The determined EMC removal efficiencies were $36.04{\pm}9.45%$ for BOD, $38.50{\pm}13.50%$ for $COD_{Mn}$, $34.34{\pm}13.05%$ for TN and $34.22{\pm}14.27%$ for TP, respectively. These results showed that the pollutants concentration and EMC were reduced while passing through the constructed wetland. In the correlation analysis, the highly correlations with EMC removal efficiency of BOD and $COD_{Mn}$ were observed for total rainfall and rainfall intensity (P<0.05). However, the correlations were not found with TN and TP for rainfall variables.