Work limit Load Efficiency According to Splicing Method for Hand Spliced Wirerope Sling

스플라이스식 와이어로프 슬링의 편입법에 따른 사용하중한계효율

  • Park, Jae-Suk (Occupational Safety and Health Research Institute, KOSHA) ;
  • Han, Kyoung-Hun (Occupational Safety and Health Research Institute, KOSHA)
  • 박재석 (한국산업안전보건공단 산업안전보건연구원) ;
  • 한경훈 (한국산업안전보건공단 산업안전보건연구원)
  • Received : 2010.04.28
  • Accepted : 2010.05.06
  • Published : 2010.12.31

Abstract

For each strand of wirerope sling, the international standards, ISO-8794, EN-13414 specify that the splice shall have five series of load carrying tucks. At least three of the load carrying tucks shall be made with the whole strand. And, the breaking force of the splice shall not be less than 70% or 80% of that of rope. But, There are no prescriptions for splicing types against different efficiency of each splicing type being used many workplace. In this study, analysis the work limit load efficiency according to variation of number of tucks and splicing types by experimental method As a result, the number of tucks 3+2 had the highest breaking efficiency.

Keywords

References

  1. "KS B 6242 : 와이어로프 슬링", KS, 2001.
  2. "ISO 8794 : Steel wire ropes-Spliced eye terminations for slings", ISO, 2002.
  3. "BS EN 13411-2, Terminations for steel wire ropes - Safety - Part 2 : Splicing of eyes for wire rope slings", EN, 2001.
  4. "산업안전보건법령집", 한국산업안전공단, 2009.