과제정보
연구 과제번호 : Planning and Scheduling in Remanufacturing Systems
연구 과제 주관 기관 : Swiss National Science Foundation
참고문헌
- Aggarwal, A. and Park, J. K. (1993), Improved Algorithms for Economic Lot Size Problems, Operations Research, 41, 549-571 https://doi.org/10.1287/opre.41.3.549
- Boothroyd, G. and Alting, L. (1992), Design for Assembly and Disassembly, CIRP Annals-Manufacturing Technology, 41, 625-636 https://doi.org/10.1016/S0007-8506(07)63249-1
- Erdos, G., Kis, T., and Xirouchakis, P. (2001), Modeling and Evaluating Product End-of-life Options, International Journal of Production Research, 39, 1203-1220 https://doi.org/10.1080/713845985
- Federgruen, A. and Tzur, M. (1991), A Simple Forward Algorithm to Solve General Dynamic Lot sizing Models with n periods in O(n log n) or O(n) Time, Management Science, 37, 909-925 https://doi.org/10.1287/mnsc.37.8.909
- Gupta, S. M. and McLean, C. R. (1996). Disassembly of Products, Computers and Industrial Engineering, 31, 225-228 https://doi.org/10.1016/0360-8352(96)00146-5
- Gupta, S. M. and Taleb, K. N. (1994), Scheduling Disassembly. International Journal of Production Research, 32, 1857- 1886 https://doi.org/10.1080/00207549408957046
- Inderfurth, K. and Langella, I. M. (2006), Heuristics for Solving Disassemble-to-Order Problems with Stochastic Yields. OR Spectrum, 28, 71-97
- Jovane, F., Alting, L., Armoillotta, A., Eversheirm, W., Feldmann, K., Seliger, G., and Roth, N. (1993), A Key Issue in Product Life Cycle : Disassembly, CIRP Annals-Manufacturing Technology, 42, 651-658 https://doi.org/10.1016/S0007-8506(07)62530-X
- Kang, J-G., Lee, D-H., Xirouchakis, P., and Lambert, A. J. D. (2002), Optimal Disassembly Sequencing with Sequence Dependent Operation Times Based on the Directed Graph of Assembly States, Journal of the Korean Institute of Industrial Engineers, 28, 264-273
- Kang, J-G., Lee, D-H., Xirouchakis, P., and Persson, J-G. (2001), Parallel Disassembly Sequencing with Sequence- Dependent Operation Times, CIRP Annals-Manufacturing Technology, 50, 343-346 https://doi.org/10.1016/S0007-8506(07)62136-2
- Kang, J-G., Lee, D-H., and Xirouchakis, P. (2003), Disassembly Sequencing with Imprecise Data : A Case Study, International Journal of Industrial Engineering, 10, 407-412
- Kang, J-G. and Xirouchakis, P. (2006), Disassembly Sequencing for Maintenance : A Survey, Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, 220, 1697-1716 https://doi.org/10.1243/09544054JEM596
- Kim, H-J., Lee, D-H., Xirouchakis, P., and Züst, R. (2003), Disassembly Scheduling with Multiple Product Types, CIRP Annals-Manufacturing Technology, 52, 403-406 https://doi.org/10.1016/S0007-8506(07)60611-8
- Kim, H-J., Lee, D-H., and Xirouchakis, P. (2006a), Two-Phase Heuristic for Disassembly Scheduling with Multiple Product Types and Parts Commonality, International Journal of Production Research, 44, 195-212 https://doi.org/10.1080/00207540500244443
- Kim, H-J., Lee, D-H., and Xirouchakis, P. (2006b), A Lagrangean Heuristic Algorithm for Disassembly Scheduling with Capacity Constraints, Journal of the Operational Research Society, 57, 1231-1240 https://doi.org/10.1057/palgrave.jors.2602094
- Kim, H-J., Lee, D-H., and Xirouchakis, P. (2007), Disassembly Scheduling : Literature Review and Future Research Directions, International Journal of Production Research, 45, 4465-4484 https://doi.org/10.1080/00207540701440097
- Kim, J-G., Jeon, H-B., Kim, H-J., Lee, D-H., and Xirouchakis, P. (2006c), Disassembly Scheduling with Capacity Constraints : Minimizing the Number of Products Disassembled. Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, Journal of Engineering Manufacture, 220, 1473-1481 https://doi.org/10.1243/09544054JEM349
- Kongar, E. and Gupta, S. M. (2006), Disassembly to Order System Under Uncertainty, Omega-International Journal of Management Science, 34, 550-561 https://doi.org/10.1016/j.omega.2005.01.006
- Lambert, A. J. D. (2003), Disassembly Sequencing : A Survey. International Journal of Production Research, 41, 3721-3759 https://doi.org/10.1080/0020754031000120078
- Lambert, A. J. D. and Gupta, S. M. (2005), Disassembly Modeling for Assembly, Maintenance, Reuse and Recycling, CRC Press, Florida, USA
- Langella, I. M. (2007), Heuristics for Demand-Driven Disassembly Planning, Computers and Operations Research, 34, 552-577 https://doi.org/10.1016/j.cor.2005.03.013
- Lee, D-H. (2005), Disassembly Scheduling for Products with Assembly Structure, International Journal of Management Science, 11, 63-78
- Lee, D-H., Kang, J-G., and Xirouchakis, P. (2001), Disassembly Planning and Scheduling : Review and Further Research, Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, 215, 695-710 https://doi.org/10.1243/0954405011518629
- Lee, D-H., Kim, H-J., Choi, G., and Xirouchakis, P. (2004), Disassembly Scheduling : Integer Programming Models. Proceedings of the Institution of Mechanical Engineers : Journal of Engineering Manufacture-Part B, 218, 1357-1372 https://doi.org/10.1243/0954405042323586
- Lee, D-H. and Xirouchakis, P. (2004), A Two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure, Journal of the Operational Research Society, 55, 287-297 https://doi.org/10.1057/palgrave.jors.2601690
- Lee, D-H., Xirouchakis, P., and Züst, R. (2002), Disassembly Scheduling with Capacity Constraints, CIRP Annals-Manufacturing Technology, 51, 387-390 https://doi.org/10.1016/S0007-8506(07)61543-1
- Moore, K. E., Gungor, A., and Gupta, S. M. (2001), Petri Net Approach to Disassembly Process Planning for Products with Complex AND/OR Precedence Relationships, European Journal of Operational Research, 135, 428-449 https://doi.org/10.1016/S0377-2217(00)00321-0
- Neuendorf, K-P., Lee, D-H., Kiritsis, D., and Xirouchakis, P. (2001), Disassembly Scheduling with Parts Commonality Using Petri-nets with Timestamps, Fundamenta Informaticae, 47, 295-306
- O'Shea, B., Grewal, S. S., and Kaebernick, H. (1998), State of the Art Literature Survey on Disassembly Planning, Concurrent Engineering : Research and Applications, 6, 345-357 https://doi.org/10.1177/1063293X9800600407
- Richter, K. and Sombrutzki, M. (2000), Remanufacturing Planning for the Reverse Wagner/Whitin Models. European Journal of Operational Research, 121, 304-315 https://doi.org/10.1016/S0377-2217(99)00219-2
- Richter, K. and Weber, J. (2001), The Reverse Wagner/Whitin Model with Variable Manufacturing and Remanufacturing Cost, International Journal of Production Economics, 71, 447-456 https://doi.org/10.1016/S0925-5273(00)00142-0
- Santochi, M., Dini, G., and Failli, F. (2002), Computer Aided Disassembly Planning : State of the Art and Perspectives, CIRP Annals- Manufacturing Technology, 51, 1-23 https://doi.org/10.1016/S0007-8506(07)61453-X
- Taleb, K. N. and Gupta, S. M. (1997), Disassembly of Multiple Product Structures, Computers and Industrial Engineering, 32, 949-961 https://doi.org/10.1016/S0360-8352(97)00023-5
- Taleb, K. N., Gupta, S. M., and Brennan, L. (1997), Disassembly of Complex Product Structures with Parts and Materials Commonality, Production Planning and Control, 8, 255-269 https://doi.org/10.1080/095372897235316
- Wagelmans, A., Hoesel, S. V., and Kolen, A. (1992), Economic Lot Sizing : An O(n log n) Algorithm that Runs in Linear Time in the Wagner-Whitin Case, Operations Research, 40, 145-156 https://doi.org/10.1287/opre.40.1.S145
- Wagner, M. H. and Whitin, T. M. (1958), Dynamic Version of the Economic Lot-Sizing Model, Management Science, 5, 89-96 https://doi.org/10.1287/mnsc.5.1.89
- Xirouchakis, P. and Kiritsis, D. (1996), A Generic Petri Net Model for Disassembly Planning Processes, Proceedings of Tools and Methods for Concurrent Engineering, 523-529
- Xirouchakis, P. and Kiritsis, D. (1997), Petri Net Model for Disassembly Process Planning, Proceedings of ASME Mechanical Engineering, 255-262
- Zabel, E. (1964), Some Generalizations of an Inventory Planning Horizon Theorem, Management Science, 10, 465-471 https://doi.org/10.1287/mnsc.10.3.465