과제정보
연구 과제 주관 기관 : 한국학술진흥재단
참고문헌
- Bongha, Choi, S. Y. Chang, and June-Ho Chang (2007), The heuristic approach to the order consolidation problem, Proceedings of the Conference of Korean Institute of Industrial Engineers
- Hwang, H. C. and S. Y. Chang (2005), Order consolidation for batch processing, Journal of Combinatorial Optimization, 9, 121-138 https://doi.org/10.1007/s10878-005-5488-z
- June-Ho Chang and S. Y. Chang (2006), Minimum batch cover for efficient order consolidation, Proceedings of the Joint Conference of Korean Institute of Industrial Engineers and Korean Operations Research and Management Science Society
- Kangbok, Lee, S. Y. Chang, and Y. S. Hong (2004), Continuous slab caster scheduling and interval graph, Production Planning and Control, 15, 495-501 https://doi.org/10.1080/09537280410001714279
- L. Tang, J. Liu, A. Ring, and Z. Yang (2001), A review of planning and scheduling systems and methods for integrated steel production, European Journal of Operational Research, 133, 1-20 https://doi.org/10.1016/S0377-2217(00)00240-X
-
S. Micali and V. V. Vazirani (1980), An O(
${\sqrt}{{\left|}V{\right|}}$ $\times$ ${\left|}E{\right|}$ )algorithm for finding maximum matching in general graphs, in Proc. Twenty -first Annual Symposium on the Foundations of Computer Science, 17-27 - S. Y. Chang, M. R. Chang, and Y. S. Hong (2000), A lot grouping algorithm for a continuous slab caster in an integrated steel mill, Production Planning and Control, 11, 363-368. https://doi.org/10.1080/095372800232090
- Y. H. Min, S. P. Hong, S. W. Kwon, B. C. Choi, and S. Y. Chang (2007), Maximum batch cover for order consolidation, Proceedings of the Conference of Korean Operations Research and Management Science Society