분해도 및 작업시간 산정을 통한 균형잡힌 조립공정계획에 관한 연구

Line Balanced Assembly Sequence Generation Based on a Verification of Disassemblability and Work Time

  • 신철균 (한국외국어대학교 산업경영공학과)
  • 발행 : 2007.07.01

초록

This paper presents a method of a line balanced assembly sequence generation based on the verification of a disassemblability and a work time. To derive the disassemblability for a part to be disassembled, first we inference collision free assembly directions by extracting separable directions fur the part. And we determine the disassemblability defined by the separability and stability cost. The separability cost represents a facility of the part disassembly operation, and the stability cost which represents a degree of the stability for the base assembly motion. Based upon the results, we propose a new approach of evaluating work time using neural networks. The proposed assembly sequence generation provides an effective means of solving the line balancing problem and gives a design guidance of planning assembly lay-out in flexible manufacturing application. Example study is given to illustrate the concepts and procedure of the proposed schemes.

키워드

참고문헌

  1. Park, T. H. and Lee, B. H., 'An Approach to Robot Motion Analysis and Planning,' Proceedings of the IEEE International Conference on Robotics and Automation, sacramento, CA, pp. 70-75, 1991
  2. Maekawa, H., Yokoi, K., Tanie, K. and Kaneko, M., 'Position/Stiffness based Manipulation by Three-fingered Robot Hand,' Proceedings of ISART, March 5-7, pp. 597-603, 1991
  3. Wilhelm, W. E., 'Conveyor Tracking,' Int. Encyclopedia of Robotics: Applications and Automation, R.C. Dorf., Ed., New York: John Wiley & Sons, Inc., pp. 283-298, 1988
  4. Huang, Y. F. and Lee, C. S. G., 'A Framework of Knowledge-based Assembly Planning,' Proceedings of the IEEE International Conference on Robotics and Automation, sacramento, CA, pp. 599-604, 1991
  5. Sharp, W. I., 'Assembly Line Balancing Techniques,' Technical Paper Ms77-313, Society of Manufacturing Engineers, Dearborn, Mich, 1977
  6. Lee, M. K. and Lee, S. J., 'Dynamic Programming Algorithms for Scheduling Jobs with Sequence -Dependant Processing Times,' Journal of Korean Institute of Industrial Engineers, Vol. 24, No. 3, pp. 431-440, 1998
  7. Kang, J. K. and Lee, D. H., 'Optimal Disassembly Sequencing with Sequence-Dependant Operation Times Based on the Directed Graph of Assembly States,' Journal of Korean Institute of Industrial Engineers, Vol. 28, No. 3, pp. 264-273, 2002
  8. Delchambre, A., 'CAD Method for industrial Assembly,' John Wiley & Sons, Inc., 1996
  9. Shin, C. K. and Cho, H. S., 'On The Generation of Robotic Assembly planning based on Separability and Assembly Motion Stability,' Robotica, Vol. 12, No. 1, pp. 7-15,1994 https://doi.org/10.1017/S0263574700018130
  10. Cho, D. Y. and Cho, H. S., 'Inference on Robotic Assembly Precedence Constraints Using Part Contact Level Graph,' Robotica, Vol. 11, No. 1, pp. 173-183, 1993 https://doi.org/10.1017/S0263574700019287
  11. Lee, S. H., 'Assembly Planning based on Subassembly Extraction,' IEEE Transaction on Robotics and Automation, Special Issue on Manufacturing Systems: Design, Planning, Scheduling and Real-Time Control, pp.1-30, 1990
  12. Delchambre, A., 'A Pragmetic Approach to Computer-Aided Assembly Planning,' Proceedings of the IEEE International Conference on Robotics and Automation, pp. 1600-1605, 1990
  13. Pao, Y. H., 'Adaptive Pattern Recognition and Neural Networks,' Addison wisely Publishing Company, Inc. N.Y., 1989
  14. Mikell, P. G., 'Automation, Production Systems and Computer Integarted Manufacturing,' Prentice-Hall International. Inc., pp.143-149, 1987