Abstract
If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.
건설공사의 시공공정을 관리자의 경험적 판단에 의하여 작업팀을 구성하여 운영하면, 시공공정의 진행이 비효율적으로 될 가능성이 많다. 그러나 시공계획단계에서 모의조작을 통하여 자원할당, 공사비, 공사기간의 최적 안을 산출하면 시공공정을 정량화하여 효율적인 운영을 할 수 있다. 본 연구에서는 시공공정을 계획할 때 작업팀 운영의 변화에 따른 자원할당 변동치, 자원 손실비, 총공사비, 공사기간의 최적 안을 모의조작 할 수 있는 수식모형의 시안 식을 제안하였다. 제안된 수식모형을 검증하기 위하여 시공공정의 수평작업역과 수직작업 역이 각각 상이하게 구성된 공동주택 골조공사에 적용하여 시현하였다. 본 연구에서 제시된 수식모형을 적용하여 모의 조작을 실시한 결과가 실제 사례공사에서 적용된 작업팀의 운영실적보다 효율화를 달성하였다.