• Title/Summary/Keyword: 자원할당변동치

Search Result 1, Processing Time 0.015 seconds

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.