Economic Analysis of Economic Steel beam method.

ES 빔 공법의 경제성 분석

  • 최태호 ((주)연덕이엠씨) ;
  • 우종열 ((주)힐엔지니어링) ;
  • 홍성욱 ((주)상지엔지니어링건축사사무소) ;
  • 서용칠 ((주)건축사사무소건원엔지니어링) ;
  • 신찬호 ((주)상지엔지니어링건축사사무소, 기획기술본부)
  • Published : 2011.05.20

Abstract

This study concerned with the steel beam of bonding method and bonded steel beams by this method and both ends of different height, steel beams and steel beams in the center makes the junction. Both ends and the central part of steel beams connecting the lower flange by additional combining steel plates to convey stress, the stress to focus on the beam connections are passed to both ends of steel beams, and strength of beam connections is improved and steel structural beams is proposed to minimize the loss by Incision. If you use the developed method, the construction period is shortened, and reducing the amount of material can decrease the cost and reduction in floor height can be maximized business feasibility.

Keywords