DEVELOPMENT OF AN INTEGRATED MODEL OF 3D CAD OBJECT AND AUTOMATIC SCHEDULING PROCESS

  • Je-Seung Ryu (Department of Architectural Engineering, Konkuk University) ;
  • Kyung-Hwan Kim (Department of Architectural Engineering, Konkuk University)
  • Published : 2009.05.27

Abstract

Efficient communication of construction information has been critical for successful project performance. Building Information Modeling (BIM) has appeared as a tool for efficient communication. Through 3D CAD objects, it is possible to check interception and collisions of each object in advance. In addition, 4D simulation based on 3D objects integrated with time information makes it realize to go over scheduling and to perceive potential errors in scheduling. However, current scheduling simulation is still at a stage of animation due to manual integration of 3D objects and scheduling data. Accordingly, this study aims to develop an integrated model of 3D CAD objects that automatically creates scheduling information.

Keywords

Acknowledgement

This work was supported by the Korean Institute of Construction & Transportation Technology Evaluation and Planning (KICTEP). (Grant No: 06-Unified & Advanced Construction Technology Program-D01).