Proceedings of the Korean Geotechical Society Conference (한국지반공학회:학술대회논문집)
- 2009.09a
- /
- Pages.554-563
- /
- 2009
A Case Study of a Drilled Shaft Design and Construction of Buildings
건축구조물에서 현장타설말뚝에 의한 대형기초의 설계 및 시공사례
- Joeng, Gyeong-Hwan (Dong-A Geological Engineering Co., LTD.) ;
- Jung, Dong-Young (Dong-A Geological Engineering Co., LTD.) ;
- Kim, Young-Man (Dong-A Geological Engineering Co., LTD.) ;
- Jung, Sun-Tae (Dong-A Geological Engineering Co., LTD.) ;
- Kim, Dong-Jun (Dong-A Geological Engineering Co., LTD.) ;
- Kim, Min-Sung (Daewoo Motor Sales Corporation Engineering & Construction Div.)
- 정경환 ((주)동아지질) ;
- 정동영 ((주)동아지질) ;
- 김영만 ((주)동아지질) ;
- 정선태 ((주)동아지질) ;
- 김동준 ((주)동아지질) ;
- 김민성 (대우자동차판매(주) 건설부문)
- Published : 2009.09.25
Abstract
The trend of current urban redevelopment and new city development project shows that the superstructure of building is getting larger and higher in consequence of a limited plottage condition. For this reason, it is definitely required to extend pile diameter and install more deep foundation(Mega foundation) to support superstructure. The existing precast pile construction method causes construction-related problems such as increasing quantities, difficulty of storage & transportation material and decreasing design load while construct pile in deep foundation. The drilled shaft method has applied to minimize those problems. This article will be presented construction case study of design & construction of R.C.D method for a large building foundation work on the inside and outside of the country.