• Title/Summary/Keyword: yarding

Search Result 34, Processing Time 0.027 seconds

The Yarding Productivity and Cost of Cable Yarding Operation by Yarder Attached on Trator -Using the Chuncheon Tower-yarder - (트랙터부착 집재기를 이용한 집재작업 분석 -춘천집재기를 중심으로 -)

  • Han, Won Sung;Han, Han-Sup;Kim, Yeong-Suk;Shin, Man Yong
    • Journal of Korean Society of Forest Science
    • /
    • v.97 no.6
    • /
    • pp.641-649
    • /
    • 2008
  • This study was conducted to evaluate the productivity and the operational costs of the Chuncheon Tower-yarder, a skyline yarding system used in Korea. Detailed time study data were collected from 4 thinning sites in Japanese larch (Larix leptolepis) stands; one site for uphill yarding and three sites for downhill yarding. This study derived regression models to estimate the average cycle time (sec.) for uphill and downhill yarding. The average yarding cost was $12,844won/m^3$ for uphill yarding, while downhill yarding cost was $13,221won/m^3$. The average yarding time was 239 sec/cycle for uphill yarding, while downhill average yarding time was 274 sec/cycle. We found that uphill yarding productivity was higher when the operation system was examined under the same work conditions (i.e. standardized comparison) except yarding directions for both uphill yarding and downhill yarding.

The Productivity and Cost of Yarding Operations Using a Tractor-attached Winch in Pinus densiflora Stands (소나무 임분에서의 트랙터윈치를 이용한 집재작업 생산성 및 비용분석)

  • Jeong, Eung-Jin;Cho, Min-Jae;Park, Jeong-Mook;Cho, Koo-Hyun;Yoo, Young-Min;Cha, Du-Song
    • Journal of Korean Society of Forest Science
    • /
    • v.108 no.4
    • /
    • pp.574-581
    • /
    • 2019
  • The present study analyzed the productivity and cost of winching operations for evaluating the efficiency of a tractor-attached winch in a Pinus densiflora thinning site located in the Yangyang County of Gangwon-do. The mean yarding distance and mean timber volume were 29 m and 0.15 ㎥, respectively. In the 95 cycles of yarding operations, the uphill and downhill yarding operations constituted 51% and 49%, respectively, of the total yarding operations. The productivity of the uphill yarding operation was 2.28 ㎥/h, and the productivity of the downhill yarding operation was 1.89 ㎥/h. The findings of this study revealedthat productivity would increase by 0.5 ㎥/h when the rate of utilization of the machine is increased to 80% by reducing the operational delay time. The cost of the downhill yarding operation was 44,116 KRW/㎥, whereas that of the uphill yarding operation was 53,369 KRW/㎥. The difference in cost resulted from the difference in the number of yarding stems (stems/cycle). Furthermore, the results of the multiple linear regression equation developed for predicting the yarding operation times showed that productivity was significantly affected by working conditions such as yarding distance (m), the number of stems per cycle (stems/cycle), and the terrain slope (%) in the uphill and downhill yarding operations. Further research is required for developing an accurate prediction model equation according to a yarding direction.

Productivity and Cost of Tree-length Harvesting Using Cable Yarding System in a Larch (Larix leptolepis) Clear-cutting Stand

  • Jeong, Eungjin;Cho, Koohyun;Cho, Minjae;Choi, Byoungkoo;Cha, Dusong
    • Journal of Forest and Environmental Science
    • /
    • v.33 no.2
    • /
    • pp.147-153
    • /
    • 2017
  • The purpose of this study was to examine productivity and cost of tree-length harvesting using cable yarding system in a larch (Larix leptolepis) clear-cutting stand located in Pyeongchang-gun, Gangwon-do. We used tree-length harvesting method using cable yarding system with a tower yarder HAM300. The productivity was $17.6m^3/hr$ for felling, $12.4m^3/hr$ for delimbing, $4.2m^3/hr$ for yarding, and $8.1m^3/hr$ for processing. The total cost of the harvesting system was $48,381won/m^3$, which was majorly composed of yarding operation cost, at $40,169won/m^3$ (79.3%), while felling had the lowest cost at $1,154won/m^3$ (4.1%). Major factors affecting felling and processing productivity was tree volume and the number and thickness of branches for delimbing productivity. In addition, we suggest that training and education for machine operators were critical to improve yarding productivity.

An Analysis of the Yarding Productivity and Cost in Forest Tending Operation (숲가꾸기 작업에서의 산물수집 공정 및 비용 분석)

  • Kim, Jae-Hwan;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.99 no.4
    • /
    • pp.625-632
    • /
    • 2010
  • This study was carried out to analyze the yarding productivity and cost of the man-power operation by plastic chute, the yarding operation by yarder attached in tractor (Chuncheon Tower-yarder) and yarding operation by Tower-yarder (RME-300T) in forest tending operation. As result of average yarding timber volume was 0.67 $m^3$, 3.8 $m^3$ and 7.3 $m^3$ per day and man, respectively. And, when an yarding timber volume was 60 $m^3$/ha, the total yarding time including setting up and dismantling time of the plastic chute and yarding line was 20 days and 2 hours, 7 days and 1 hours and 21 minutes, 3 days and 4 hours and 27 minutes, respectively. The operation costs were 104,448 won/$m^3$, 29,968 won/$m^3$ and 23,032 won/$m^3$, respectively. And, when yarding timber volume was 60 $m^3$/ha, the total operation cost including setting up and dismantling time of the plastic chute and yarding line was 7,429,173 won/ha, 2,431,573 won/ha and 1,610,672 won/ha, respectively.

Comparison of Harvesting Productivity and Cost of Cable Yarding Systems (가선집재작업에서의 작업 생산성 및 비용 분석)

  • Han, Won Sung;Han, Han-Sup;Kim, Nam-Hun;Cha, Du Song;Cho, Koo Hyun;Min, Do Hong;Kwon, Ki Cheol
    • Journal of Korean Society of Forest Science
    • /
    • v.103 no.1
    • /
    • pp.87-97
    • /
    • 2014
  • This study was conducted to provide field-based harvesting study information which can be used to select an optimal cable system for certain work conditions on steep grounds (> $20^{\circ}$ ground slope) in Korea. To accomplish this study objectives, we evaluated three cable yarding systems (RME-300T tower-yarder, Chuncheon tower-yarder, FARMI tractor winch) working in typical work conditions for their yarding productivity and operational efficiency. Those yarders are commonly used for removing logs or trees on steep grounds in Korea. Under the same work conditions (average DBH of tree to be cut, 20 cm; yarding distance, 60 m; lateral yarding distance, 10 m; and machine utilization rate, 70%), the average productivities were $33.04m^3$/day, $38.47m^3$/day, and $14.17m^3$/day for RME-300T, Chuncheon tower-yarder, and FARMI, respectively. Our standardized cost comparison study also showed that the yarding cost was highest at $37,835won/m^3$ with FARMI, followed by RME-300T at $25,105won/m^3$ for the same work conditions. We found the lowest yarding cost with the Chuncheon tower-yarder at $20,520won/m^3$ which was resulted primarily from high yarding productivity at the yarding distance (60 m). Our analysis suggested that a small machine such as FARMI could be a low-cost yarding machine option for a cable yarding job with a short yarding distance (40 m or less). The Chuncheon tower-yarder is well suited for a mid-range yarding distance job in Korea, ranged between 40 to 140 m. If yarding distance were longer than 140 m, the RME-300T tower yarder appears to be most cost-effective.

A Study on Economical Analysis of Yarding Operation by Cable Crane (케이블클레인을 이용(利用)한 집재작업(集材作業)의 경제성(經濟性)에 관(關)한 연구(硏究))

  • Woo, Bo Myeong;Park, Jong Myeong;Lee, Joon Woo;Chung, Nam Hun
    • Journal of Korean Society of Forest Science
    • /
    • v.79 no.4
    • /
    • pp.413-418
    • /
    • 1990
  • Since 1945, the periodical reforestation projects considered as the fundamental apparatus of the forest policy of the Government have been continuously carried out during last 40 years in Korea. As a result, some of the forests are ready to be harvested, especially in well-managed plantations as well as in the natural forests. This requires to pay more attention to harvesting the timber rather than planting trees. At the present, such timber harvesting operations such as cutting, felling, bucking, and skidding and yarding, particularly yarding operations in mountain areas with harsh terrains are in the most cases depend upon man power. However, the yarding operations should be more mechanized in the near future in Korea mainly because of the high cost of labour couppled with the lack of labour in forested areas. The Forest Work Training Center attached to the Forest Administration imported and tested the smallsized cable crane(K-300) with movable tower. The result of economic analysis of the yarding operation expenditures shows that the cable crane yarding costs more than the man yarding at the present time. As the labour cost will gradually increase and the efficiency of machine operation will improve, the results of the study indicates that the yarding operation by cable crane will be more cost-effective in the future.

  • PDF

The Characteristics of Residual Stand Damages Caused by Skyline Thinning Operations in Mixed Conifer Stands in South Korea

  • Han, Sang-Kyun;Cho, Min-Jae;Baek, Seung-An;Yun, Ju-Ung;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.35 no.3
    • /
    • pp.197-204
    • /
    • 2019
  • A tree-length harvesting system using the HAM300, which is mounted on a farm tractor prototype machine, have been recently introduced in South Korea for thinning old (>30 years) forests. However, no research has previously been conducted on the characteristics of residual stand damage associated with cable yarding systems on thinning treatment stands in South Korea. Therefore, there were assessed on the degree and quantity of residual stand damage caused by felling and yarding process to broaden the knowledge of residual stand damage on semi-mechanized skyline thinning operations. This study investigated scar size, direction, area, shape type and their distribution on the residual stand damage caused by felling and yarding operations. Damage to residual trees was generated for 7.4% and 6.9% of residual trees in felling and yarding operations, respectively. Damaged direction of scars was located in front-side (38.9%) and up-side (34.7%) for felling operations while the highest scar damage was found on down-side (44.6%) for yarding operations. Scar heights of felling damage were higher than those of yarding damage. In yarding operation, the most of the scars was located within l0m from the center of the skyline corridor. These results should be useful information for forest managers and landowners to reduce residual stand damages and retain valuable timber volume from thinning treatments.

The Techniques Development for the Possibility Area Analysis of Yarding Operation and the Forest-road Network Arrangement using GIS (GIS를 이용한 집재작업 가능구역 분석 및 노망배치를 위한 기법 작성)

  • Kwon, Hyun-Jung;Park, Sang-Jun
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.1
    • /
    • pp.143-155
    • /
    • 2013
  • In order to establish efficient timber harvesting system and provide the necessary data for the system establishment, the techniques to identify areas possible of the yarding-operation and design forest-road networks were newly developed and the applicability of the techniques are tested in this study. The new techniques were developed based on ArcGIS, particularly with utilizing the Viewshed Analysis Tool. From the results of the identification of the possible yarding-operation areas, it is found that the percentage of possible yardingoperation area decreases with the increment of maximum yarding distance due to terrestrial effects. When forest road networks are extended in impossible yarding-operation sites, the area of possible yarding-operation sites increases. If a forest road network is newly designed, its overall extension is altered, resulting in changes in the possible yarding-operation areas. Through the comparative analysis among the different possible yardingoperation areas from different forest road networks, the maximization of the yarding-operation possible area can be achieved. The results from this study can be utilized for establishing more efficient timber-harvesting system and developing GIS-based programs to manage the system.

Analysis on Yarding Productivity and Cost of Tower-Yarder Based on Excavator Using Radio-Controlled Double Clamp Carriage (2중 무선 클램프 반송기를 이용한 굴삭기 기반 타워야더의 생산성 및 비용 분석)

  • Choi, Yun-Sung;Cho, Min-Jae;Mun, Ho-Seong;Kim, Dae-Hyun;Cha, Du-Song;Han, Sang-Kyun;Oh, Jae-Heun
    • Journal of Korean Society of Forest Science
    • /
    • v.107 no.3
    • /
    • pp.266-277
    • /
    • 2018
  • This study was conducted in clear cutting stands. For the whole-tree yarding operation, a tower-yarder based on excavator with a radio-controlled double clamp carriage was applied to analyze yarding productivity and cost. The productivity and cost of yarding operation was $6.2m^3/SMH$(machine utilization rate, 80.4%) and $13,705won/m^3$, respectively. Although the maximum yarding distance was longer than the previous studies, the setting up time of the tower-yarder was decreased as used straw line. The application of the radio-controlled double clamp carriage improved productivity and reduced costs. Based on the fuel log and growing stock($137.0m^3/ha$), the minimum production($m^3$) and area(ha) were $558.3m^3$ and 4.1 ha for Pinus rigida stands and $433.7m^3$ and 3.2 ha for Quercus mongolica stands, respectively. Based on the this study, it will be possible to select an efficient yarding machine by accumulation of data on minimum production and area for many machines in various harvesting sites.

Studies on the Design of Forest Road Network for Mechanized Yarding Operations (II) - Optimal road spacing and density - (기계화(機械化) 집재작업(集材作業)을 위한 노망정비(路網整備)에 관(關)한 연구(硏究)(II) - 적정임도간격(適正林道間隔) 및 임도밀도(林道密度) -)

  • Cha, Du Song;Cho, Koo Hyun
    • Journal of Korean Society of Forest Science
    • /
    • v.83 no.3
    • /
    • pp.299-310
    • /
    • 1994
  • This study was carried out to examine the optimal road spacing and road density to minimize the total harvesting cost(road construction cost plus yarding cost) for mechanized yarding system to roadside by one - and two-stage two-way in Forestry build-up region. Chunchon-kun, Kangwon-do. The estimated road construction costs were ranged from ten million won to sixty million won per km. The results have indicated that cable crane was appropriate for yarding machine by one-stage, two-way, and estimated optimal road spacing was 1,698m~4,192m, averaged 3,087m, and road density was 3.44m/ha~8.44m/ha, and averaged 5. 12m/ha. In hilly terrain, combination of medium yarder and Logging bogie was suited to yarding machine by two-stage, two-way, and calculated optimal road spacing was 1,483m~3,481m, averaged 2,589m, and road density was 4.05m/ha~9.46m/ha, averaged 5.90m/ha. In steep terrain, combination of medium yarder and jinsung winch was suited, and estimated optimal road spacing was 1,693m~3,982m, averaged 2,960m, and road density was 3.68m/ha~8.64m/ha, averaged 5.38m/ha.

  • PDF