Oil spills caused by the accidents have been occurred from house and factory waste, grounded tanker, the rupture of storage tank and oil pipelines, the deterioration of various industrial facilities, etc. Many oil spills result in contamination of shorelines and workplace. Fire and explosion may happen from these spills. There are several technologies used for clean-up application, which include use of oil dispersing agents, absorbents, solidifiers, booms and skimmers by physical, chemical, and biological methods. Methods for oil spill clean-up operation are classified into the absorption type, gel type and self-swelling type. Porous materials with oil absorptive properties are classified into micropore, mesopore, and macropore depending on their pore sizes. Recently, new porous materials with smaller size have been developed, but the selective oil absorption in water-in-oil interface demonstrates the macro pore size. In this study oil absorption effects were evaluated using the organic porous materials with a complex function of gel type and swelling type. Samples were subjected to analysis by FT-IR spectroscopy and were characterized in terms of gel formation and morphologies. Oil sorption capacity, pressure retention force and gel strength were also measured. From these results, the physicochemical reactivity before and after gelation was verified and the industrial applications of clean-up operation were suggested.
Rashid, Khandakar M.;Datta, Songjukta;Behzadan, Amir H.;Hasan, Raiful
Journal of Construction Engineering and Project Management
/
v.8
no.1
/
pp.10-21
/
2018
Many construction projects involve a plethora of safety-related problems that can cause loss of productivity, diminished revenue, time overruns, and legal challenges. Incorporating data collection and analytics methods can help overcome the root causes of many such problems. However, in a dynamic construction workplace collecting data from a large number of resources is not a trivial task and can be costly, while many contractors lack the motivation to incorporate technology in their activities. In this research, an Android-based mobile application, Preemptive Construction Site Safety (PCS2) is developed and tested for real-time location tracking, trajectory prediction, and prevention of potential collisions between workers and site hazards. PCS2 uses ubiquitous mobile technology (smartphones) for positional data collection, and a robust trajectory prediction technique that couples hidden Markov model (HMM) with risk-taking behavior modeling. The effectiveness of PCS2 is evaluated in field experiments where impending collisions are predicted and safety alerts are generated with enough lead time for the user. With further improvement in interface design and underlying mathematical models, PCS2 will have practical benefits in large scale multi-agent construction worksites by significantly reducing the likelihood of proximity-related accidents between workers and equipment.
Journal of Korean Society of Industrial and Systems Engineering
/
v.23
no.56
/
pp.65-85
/
2000
Industrial accidents have been consistently increased in terms of medical costs, lost work days, and incidence rates every year in Korea. Since the infrastructure of the industry changed shifts rapidly from 1980s in the developing countries such as South Korea, the nature and magnitude of the industrial accidents have also undergone a major shift. The situation is especially severe in small-to-medium sized industry(SMI). This article reports the development of a systematic evaluation system of risk factors specifically for the SMIs. The new approach introduced by this article is geared to the systematic identification and evaluation of the injuries from power press machines using the Analytic Hierarchy Process with the key evaluation data generated and evaluated by the employees on site. A total of 21 companies was studied and surveyed using the hierarchical structures of the cause-effect relationship of the mechanical injuries and their countermeasures. For the relative weighting of each risk factor, separate questionnaire survey was conducted for the selected workers from each company who had worked for more than 10 years in press work. Most participants (48 out of 62) replied that human attributes were the most significant factors for mechanical injuries fellowed by administration, machine, and work environment factors. The result also showed that the self-motivated risk assessment and safety enhancement activities would be an effective and efficient way of managing the risk factors in the SMIs.
The new chemicals are developed and circulated without the verified toxicity data. So, the accidents and occupational diseases, such as explosion, fire, suffocation about deadly poisons etc. are frequently to workers. Classifications of chemicals suited with guideline and an offer of correct chemical information data are the molt important thing for the establishment of suitable chemical management system. The GHS (Globally Harmonized System of classification and labeling of chemicals) is based with the chemical classifications and unification plan. The warning symbol and phrases are established for improvements of chemical information data system. According to these unified and improved systematic form of data, and the chemical information data, the workplaces will be presented many chemical safety and risk data correctly. In this paper, we will present constructions and accomplishment contents-based chemical management of workplace through development of chemical information data and the nice using for new chemical investigation and risk assessment of chemicals in workplaces.
Background: Since the Republic of Korea became a labor-force-importing country, the number of foreign workers has increased gradually, especially in the construction industry. The main objective of this study was to examine the differences in safety perception between domestic and foreign workers at Korean construction sites. Methods: A total of 891 Korean and foreign workers were surveyed: 140 foreign and 751 Korean workers. The general characteristics and 25 factors influencing safety perception were considered in the questionnaire. Regression and correlation analyses were conducted to examine the variables of workers' safety perception. Results: Differences of nationality (F = 7.379, p < 0.001) and workplace accidents were statistically significant for both domestic (F = 1.503, p < 0.05) and foreign workers (F = 7.868, p < 0.05). In contrast, age, education, and Korean language level were significant variables only for foreign workers. Correlation coefficients of $0.428^{**}$ for Korean and 0.148 for foreign workers between two items - namely, "management's commitment to safety" and "blaming staff when they make mistakes" - support the conclusion that foreign workers do not trust management's commitment to safety, while Korean workers have confidence in these commitments. Conclusion: Foreign workers' level of safety perception should rise to the same level as Korean workers, especially in terms of obeying safety rules, safety education performance, and safety beliefs. Therefore, an improvement plan for the Korean construction industry is suggested in order to have a better safety level at construction sites with foreign workers.
Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.
Purpose: In this study, we proposed a plan to establish and implement a safety and health management system by utilizing corporate resources so that manufacturing companies can effectively respond to the Serious Accident Punishment Act. Methods: We identified critical factors and response strategies necessary for manufacturing companies to respond to the Severe Accident Punishment Act effectively and surveyed employees working at the company regarding their importance and performance. Results: In this study, we presented a method of strategically constructing the response strategies (20) shown in previous studies by matching them with the company's resources (leadership, organization, budget, education, and awareness). In particular, leadership refers to the ability of managers who can prevent serious accidents by carrying out safety and health security obligations to avoid safety and health hazards or risks to employees in the business or workplace that is controlled, operated, and managed. Conclusion: Based on the manager's firm leadership, the system's purpose and direction must be accurately set and sufficiently communicated to members. In addition, for companies to identify and improve risk factors on their own, a Process approach must be established to improve execution by referring to legal standards together with field managers and supervisors.
Journal of Korean Society of Disaster and Security
/
v.14
no.3
/
pp.39-49
/
2021
According to the recent "Status of Industrial Accidents at the End of December 2020" released by the Ministry of Employment and Labor, each industry is subject to industrial accidents. The number of accident deaths by construction industry, accident deaths by accident type fell, and accident deaths by workplace size were 5 to 49, indicating that most accident deaths occurred due to falling accidents at small construction sites. Therefore, urban living houses are small construction sites, and the probability of falling accidents is very high. Fall simulation training for disaster occurrence is conducted mainly by large construction ordering organizations in the public sector, and it is the first case in Korea that a housing construction company has conducted at a small construction site. This study analyzed and presented the definition, construction characteristics, and safety management status of urban living houses, and developed and spread an emergency relief procedure manual in the event of a fall accident to minimize deaths.
Kim, Young Sun;Kwon, Oh Jun;Kim, Ki Sik;Rhee, Kyung Yong
Safety and Health at Work
/
v.3
no.4
/
pp.278-286
/
2012
Objectives: Authors investigated the pattern of the rate of occupational injuries and illnesses (ROII) at the level of enterprises in order to build a network for exchange of experience and knowledge, which would contribute to workers' safety and health through safety climate of workplace. Methods: Occupational accidents were analyzed at the manufacturing work site unit. A two step clustering process for the past patterns regarding the ROII from 2001 to 2009 was investigated. The ROII patterns were categorized based on regression analysis and the patterns were further divided according to the subtle changes with Mahalanobis distance and Ward's linkage. Results: The first clustering of ROII through regression analysis showed 5 different functions; 29 work sites of the linear function, 50 sites of the quadratic function, 95 sites of the logarithm function, 62 sites of the exponential function, and 54 sites of the sine function. Fourteen clusters were created in the second clustering. There were 3 clusters in each function categorized in the first clustering except for sine function. Each cluster consisted of the work sites with similar ROII patterns, which had unique characteristics. Conclusion: The five different patterns of ROII suggest that tailored management activities should be applied to every work site. Based on these differences, the authors selected exemplary work sites and built a network to help the work sites to share information on safety climate and accident prevention measures. The causes of different patterns of ROII, building network and evaluation of this management model should be evaluated as future researches.
Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
/
v.8
no.5
/
pp.417-425
/
2018
This paper proposes a safety management method that extracts ETA (event tree analysis) based scenario and combines ICT technology to reduce serious disasters occurring workplace for shipbuilding and offshore plant. The statistics of Safety and Health Agency and (previous)Ministry of Public Safety and Security show that the most frequent accident among the serious disasters related to shipbuilding and offshore plant is falling. The main cause of accidents is absence of a safety belt and safety belt ring. To solve these problems, we create ETA based scenarios to derive results based on safety considerations. Based on these results, we propose a solution by applying ICT technology for accident prevention. Deriving ETA based scenarios and ICT technology, the proposed solutions include a system for detecting the wearing of safety belts and safety helmets, a system for detecting whether or not the safety belts are connected, and a hook system for measuring safety distances. These safety related systems can reduce the probability of death of workers. By preventing accidents using the proposed method, we can reduce serious disasters in shipbuilding and offshore plant and establish systematic safety management.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.